ENG COMPACTION REPORT" Earth Solutions NWLLC 15365 NE 9011 Street, Suite 100 FIELD REPORT NWLLC Redmond, WA 98052 6t Main (425) 449-4704 1 Fax (425) 449-4711 esnw.com Project No. 7572.02 Page 1 of 2 Report ID 7572.02 E 08252022 Date Thu 8/25/2022 Weather 85°F, Cloudy Arrival/Departure Time(s) 11:15/11:45 Travel Time (hr) 1.75 Project Name 203rd Street SFR Location 7918 — 203rd St SW, Edmonds ESNW Rep. & Phone Adrien Leland 1 206-330-9801 Client Info/Contact Select Homes, Inc. I Gary Klick General Contractor Info/Contact Reviewed By LAC LK— — - HTW Flyll-(,{J Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide ourclientwith a source of professional advice, opinions, and recommendations based upon thefield representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Maximum Test Test Test Number Test Location Elevation Reference Proctor Dry Density Moisture Dry Density % of MDD (pcf) o (�a) (pcf) 1 Stormwater Backfill SG 1 1 144.7 6.04 138.4 95 As requested, ESNW rep was onsite to observe and test stormwater utility backfill. While onsite ESNW observed the following: Stormwater Backfill- C113-3 to existing CB Upon arrival, ESNW rep observed that the contractor backfilled shallow stormwater pipe between the existing catch basin (CB) in 203rd St. SW and CB-3. ESNW rep observed the contractor had backfilled using 1 '/4" minus crushed rock and compacted it to a dense and stable state. ESNW rep took a compaction test at the SG elevation. Density test of the backfill material indicated adequate compaction of at least 95% at the tested location. The location of this test is approximately shown in Figure 1 below. ESNW rep will return tomorrow. Report ID 7572.02 E 08252022 Page 2 of 2 Figure 1 1 203rd St SW •7918 203rd St SW, Edmonds, WA 98026 Earth Solutions NW. LLC