ENG COMPACTION REPORT 8.24.2022" Earth Solutions NW«C 15365 NE 9011 Street, Suite 100 FIELD REPORT NWLLC Redmond, WA 98052 6t Main (425) 449-4704 1 Fax (425) 449-4711 esnw.com Project No. 7572.02 Page 1 of 1 Report ID 7572.02 E 08242022 Date Wed 8/24/2022 Weather 85°F, Cloudy Arrival/Departure Time(s) 9:00/11:15 Travel Time (hr) 1.5 Project Name 203rd Street SFR Location 7918 — 203rd St SW, Edmonds ESNW Rep. & Phone Adrien Leland 1 206-330-9801 Client Info/Contact Select Homes, Inc. I Gary Klick General Contractor Info/Contact Reviewed By LAC HTW(,{J Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide ourclientwith a source of professional advice, opinions, and recommendations based upon thefield representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested, ESNW rep was onsite to observe and test stormwater utility backfill. While onsite ESNW observed the following: Stormwater Backfill- CB-3 to existing CB Upon arrival, ESNW rep observed that the contractor was excavating for shallow stormwater pipe between the existing catch basin (CB) in 203rd St. SW and CB-3. ESNW rep observed the contractor placing CB-3. ESNW rep was informed that the contractor would not be backfilling till later in the day using 1 114" minus crushed rock. ESNW rep will return tomorrow to take a surface test on the backfilled material. ESNW rep recommended that the contractor moisture treat the backfill material at the time of placement. ESNW rep will return tomorrow.