Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 00396200000100 Site Address: 300 21ND AVE N EDMONDS,WA 98020-3152 Subdivision: 004344, 005922, 003962, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $3,000,000.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: BREAKWATER CONDOMINIUMS -EXTERIOR ALTERATIONS Applied: 1/10/2023 Issued:5/18/2023 Final: Expiration Date: 5/18/2024 Issued by: BAC I WA State Contractor L & I #: PACIFBE89011 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT IAN CUMMINGS 600 STEWART ST UNIT 200, (715)645-2232 ICUMMINGS@MORRISONHERSHFIELD SEATTLE WA 98101 COM CONTACT MORRISON HERSHFIELD 600 STEWART ST UNIT 200, (715)645-2232 icummings@morrisonhershfield.com SEATTLE WA 98101 17120 9th Ave SE, MILL CREEK SON@PACIFICBUILDINGENVELOPE.CO CONTRACTOR PACIFIC BUILDING ENVELOPE (425)512-8455 WA 98012 M BREAKWATER 300 2ND AVE N, EDMONDS WA OWNER CONDOMINIUM HOA 98020-3152 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/19/23 R25793 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 5/18/23 R28732 PERMIT FEE - COMMERCIAL 001.000.345.83.000.00 $16,780.00 $16,780.00 5/18/23 R28732 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $14,263.00 $14,263.00 1/19/23 R25793 TOTALS: $31,108.00 $31,108.00 CONDITION TYPE STATUS NOTES Printed: Thursday, May 18, 2023 2:44:36 PM 1 of 3 •MERCIAL BLDG PermitCity • • • • - •:0i 1 11 • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION Printed: Thursday, May 18, 2023 2:44:36 PM 2 of 3 •MMERCIAL BLDG Permit PERMIT NUM City of Edmonds 98020 1 11 • . •. INSPECTIONS• •. INSPECTOR COMPLETED RESULT NOTES AdINSPECTIONTYPE X-1 FIRE FINAL A-1 BUILDING PRECON B-5 BLDG SPECIAL INSPECTION B-5 BUILDING ENCLOSURE B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP B-3 EXT GYP SHEATHING Please see sheet S.002 of the plan sheets fastening should be done by Special Inspector. X-3 BUILDING FINAL" Please be sure to get SI reports Please be sure to get Building Enclosure documents Printed: Thursday, May 18, 2023 2:44:36 PM 3 of 3