Loading...
Noise Variance-Form B 2017DEVELOPMENT SERVICES WORK HOURS VARIANCE REQUEST FORM 121 5t" Avenue N, Edmonds, WA 98020 Phone 425.771.0220 0 Fax 425.771.0221 PROJECT NAME: OTHER PERMIT(S) ISSUED FOR PROPOSED Replace BO Pole & Feeder Cables at Edmonds Switching Yard WORK #: 100030210-60 & 30 PROJECT ADDRESS: 335 3rd Ave S., Edmonds WA 98020 APPLICANT: Phone: Snohomish County PUD — Richard Dumo 425-783-5110 Address (Street, City, State, Zip): E-Mail: 1802 75t" St. SW, MS02, Everett WA 98206 rsdumo@snopud.com PROPERTY OWNER: Phone: S N O P U D --------- Address (Street, City, State, Zip): ----------- E-Mail: --------- CONTACT PERSON: (This person must be available at all times that Phone: extended work is being performed) 425-218-1197 Troy Benfield - (Crew Foreman) Address (Street, City, State, Zip): E-Mail: ------------ LTBenfield@snopud.com CONTRACTOR: Trenchless Construction Services Phone: Brandon Simonds — (Bore Coordinator) 206-786-5273 Address (Street, City, State, Zip): E-Mail: bs@trenchlessconstruction.com DATES AND TIME OF EXTENDED WORKTIME REQUESTED: WA State Contractor License #/Exp. Date: Date: 12/11/2020 until finished N/A Time: 5pm till 10pm City of Edmonds Business License #/Exp. Date: N/A DETAIL THE SCOPE OF WORK TO BE PERFORMED DURING THE REQUESTED TIMES: PUD is working to replace (2) critical circuit feeder cables that feeds the downtown Edmonds area. Old conduits have Collapsed and unusable so replacement now includes trenching and boring in new 6" conduits to the Switching yard. This is a high priority job and construction will include weekends until it is finished. Working on extended hours during the evening will only be as needed. Daytime work is preferred. ® A RATIONALE FOR THE PROPOSAL SHALL BE SUBMITTED IN ADDITION TO THIS FORM. PLEASE REFER TO THE WORK HOURS VARIANCE REQUEST HANDOUT WHICH ASKS FOR AN EXPLANATION OF HOW THE ACTIVITIES WILL COMPLY WITH THE REQUIREMENTS OF THE VARIANCE ORDINANCE. Print Name: Richard Dumo Signature: quid Date: 12/10/2020 FORM B B:vEngvWorkGroupsvTransmission & DistributionvDUMOvWORK IN PROGRESSvCURRENT WORKvEDMONDSvReleasedv100030210(60)(30) -130 CABLE & POLE AT I'Ll 331 (Edm)AEDMONDS PERMIT\NEW PERMIT\Noise Variance -Form B 2017.docx Updated: 09/25/2017 REQUIREMENTS FOR WORK HOURS PERMITTING & DEVELOPMENT BUILDING DIVISION 121 5th Avenue N P: 425.771.0220 Xnnnnni arlmnnr C.XA1A nnv The Code: Based on ECC 5.30.110 Sounds exempt during daytime hours: Section B. Sounds originating from temporary construction sites as a result of construction activity are exempt from the provisions of this chapter, but only during the hours of 7:00 a.m. to 6:00 p.m. on weekdays and 10:00 a.m. to 6:00 p.m. on Saturdays, excluding Sundays and federal holidays. 5.30.120 Variances. A. Variances maybe granted to any person from any requirement of ECC 5.30.040 (maximum permissible sound levels) or 5.30.110 if findings are made that immediate compliance with such requirement cannot be achieved because of special circumstances rendering immediate compliance unreasonable in light of economic or physical factors, encroachment upon an existing noise source or because of non -availability of feasible technology or control methods. B. Any such variance or renewal thereof shall be granted only for the minimum time period found to be necessary under the facts and circumstances. C. Variances shall be processed as a Type 1 permit procedure under ECDC 20.01.003.13, while using the criteria found in subsection A of this section. Factors to be balanced in the process include those identified as follows: 1. Public convenience — Will the work result in significant delays for transportation, services, or other customer needs if done only during the day and within the hour restrictions set out in other parts of this chapter? 2. Public Safety — Does working outside of normally allowed significantly improve safety conditions for the traveling public and/or construction workers? 3. Public exposure — What will be the setting for any proposed work outside of regular hours? Is it located on an arterial street or in a mostly residential area? 4. Public cost — Does a limited amount of authorized outside of regular hours established by this chapter save the public significant cost compared to daytime work? 5. Noise reduction measures -- Have all reasonable steps been taken to reduce the impact of any necessary noise outside the standard hours? Answering this question needs to include evaluation of (1) limiting the night time or early morning work to only that necessary to reasonably mitigate the issues identified above, (2) use of quiet generators and quiet pumps (as available), (3) drilling and placing of piles instead of driving them, as well as use of other techniques, design choices, and acoustic control equipment and strategies necessary to minimize the night-time or early morning impacts from construction noise. D. The grant of a variance shall not relieve any person from the requirements of ECC 5.30.130 relating to public disturbance noises. A Temporary Construction Site is defined as the location of a development -related construction project being performed under a City -issued permit, where required. Procedures: For Private Development -related Projects, applications for a noise variance shall be submitted to the Development Services Department no later than 2 weeks prior to the requested activity, or as otherwise deemed appropriate by the director. An earlier date is strongly recommended because approval could take longer if necessary if information is unclear or missing or the department needs additional time to consider relevant factors. Applications must be accompanied by documentation and rationale sufficient to identify the date(s) and time for which the variance is being requested and to demonstrate compliance with the criteria set forth in the ordinance. The director or designee shall render a determination based on the authority under ECC 5.30.120. Approval or denial shall be in writing. Fees: The fee amount shall be that as established in the current department fee schedule for a Type 1 Staff Decision (currently $315 which includes a technology fee) and is payable upon application. Refunds will not be available once a determination has been made, whether approval or denial. FORM B 13:AI?ng\WorkOroups\Transmission & Distribution\DUMO\WORK IN PROGRESS\CURRFNI' WORK\EDMONDS\Released\100030210(60)(30) - 130 CABLE & POLIi A'I PLI 331 (Edm)AEDMONDS PERMI'I\NFW PERMIT\Noise Variance -Form 13 2017.docx Updated: 09/25/2017