Loading...
APPROVED RESUB2 BLD2022-1702+Architectural_Plan+2.13.2023_7.26.49_AM+3365337ABBREVIATIONS Acous. Acoustical Max. Maximum A.F.F. Above Finish Floor M.B. Metal Bolt Aggr. Aggregate Mech. Mechanical Al. Aluminum Memb. Membrane Approx. Approximate Met. Metal Arch. Architectural Mfr. Manufacturer A.D. Area Drain M.H. Manhole A.D.A. Americans with Min. Minimum Disabilities Act Mir. Mirror Bd. Board, Bead Misc. Miscellaneous Bitum. Bituminous M.J. Movement Joint Bkp. Backing Plate M.L. Module Line Bldg. Building M.O. Masonry Opening Blk. Block M.R. Moisture Resistant Blkg. Blocking M.S. Machine Screw Bm. Beam Mtd. Mounted Bot. Bottom Mul. Mullion B.U. Built -Up N. North Cab. Cabinet N.I.C. Not In Contract C.B. Catch Basin No. Number C.J. Control Joint # Number Ceil. Ceiling Nom. Nominal Cem. Cement N.T.S. Not To Scale Cer. Ceramic O.A. Overall C.I. Cast Iron O.C. On Center Clg. Ceiling 0. D. Outside Diameter (dim.) Clr. Clear Off. Office Col. Column O.H. Opposite Hand Conc. Concrete Opg. Opening Conn. Connection Opp. Opposite Constr. Construction O.S. Overflow Scupper Cont. Continuous PC. Piece Corr. Corridor P.C.P. Portland Cement Plaster Ctsk. Countersunk Pl. Plate, Plastic Dbl. Double Ph. Phase Dept. Department P. Lam. Plastic Laminate Det. Detail Plas. Plaster D Diameter Plywd. Plywood Dim. Dimension Pr. Pair Disp. Dispenser Pt. Point Dn. Down Ptn. Partition D.O. Door Opening P.T. Pressure Treated Dr. Door Q.T. Quarry Tile Dwr. Drawer R. Riser, Radius D.S. Downspout R.D. Roof Drain D.S.P. Dry Standpipe R.V. Roof Vent Dwg. Drawing Ref. Reference (E) Existing Refr. Refrigerator E. East, Electrical Reinf. Reinforced Ea. Each Reqd. Required E.J. Expansion Joint Resil. Resilient El. Elevation Rm. Room Elec. Electrical R.O. Rough Opening Elev. Elevator Rwd. Redwood Emer. Emergency R.W.L. Rain Water Leader Encl. Enclosure S. South E.P.B. Electrical Panelboard S.A.D. See Architectural Drawings Eq. Equal S.C. Solid Core Equip. Equipment S.C.D. Seat Cover Dispenser E.W.C. Electric Water Cooler Sched. Schedule Exst. Existing S. D. Soap Dispenser Expo. Exposed Sect. Section Exp. Expansion Sh. Shelf Ext. Exterior Shr. Shower F.A. Fire Alarm Sht. Sheet F.B. Flat Bar Sim. Similar F.D. Floor Drain S.J. Score Joint Fdn. Foundation Spec. Specification F.H. Flat Head Sq. Square Fin. Finish S.S.D. See Structural Drawings FI. Floor S.Sk. Service Sink Fluor. Fluorescent SSt. Stainless Steel F.C. Face of Concrete Sta. Station F.F. Face of Finish Std. Standard F.S. Face of Studs Stl. Steel Fprf. Fireproof Stor. Storage Fr. Frame Str. Structural F.R.P. Fiberglass -Reinforced Plaster S.T.S. Self Tapping Screw Ft. Foot or Feet Susp. Suspended Ftg. Footing Sym. Symmetrical Furr. Furring T. Tread, Telephone Ga. Gauge T.B. Towel Bar Galv. Galvanized T.C. Top of Curb GI. Glass Tel. Telephone G.L. Grid Line Ter. Terrazzo gwb. Gypsum Wall Board T.&G. Tongue and Groove H.B. Hose Bibb Thk. Thick H.C. Hollow Core T.O.P. Top of Parapet Hdwd. Hardwood T.P. Top of Pavement Hdwe. Hardware T.O.S. Top of Steel H.M. Hollow Metal T.V. Television Horiz. Horizontal T.W. Top of Wall H.P. High Point Typ. Typical Ht. Height Unf. Unfinished 1. D. Inside Diameter (dim.) U.O.N. Unless Otherwise Noted Ins. Insulation U.P.S. Uninterrupted Power Source Jan. Janitor Vert. Vertical it. Joint Vest. Vestibule Kit. Kitchen W. West Lab. Laboratory W/ With Lam. Laminate W.C. Water Closet Lay. Lavatory W.D. Window Dimension L.P. Laminated Plastic Wd. Wood Lt Light W/O Without W.O. Where Occurs W.P. Waterproof W.R. Water Resistant W.S. Wood Screw Wsct. Wainscot Wt. Weight GENERAL NOTES 1. All work shall conform to the requirements of the City and State of Seattle, Washington and the International Building Code, 2018 Edition and with the requirements of other agencies having jurisdiction. 2. One copy of all building permits shall be submitted to the Architect. 3. Contractor shall verify all conditions and measurements at the project site. Any discrepancies with project drawings or documents shall be reported to the Architect. 4. All existing construction to remain shall be repaired to be in working condition, unless otherwise noted. 5. All dimensions are to finish face of masonry, face of concrete, centerline of steel, face of millwork, or fixtures unless otherwise noted. Dimensions are not adjustable without architect's approval unless noted as "+/-". Verify dimensions marked W.I.F." prior to commencement of construction and notify architect in writing of any inconsistencies. 6. All dimensions, notes and details shown on one portion of a drawing shall apply typically to all opposite hand and/or conditions unless otherwise noted. 7. Contractor shall not scale drawings. Dimensions shall govern. Drawings at a large scale shall take precedence over drawings of a small scale. Details shall govern over plans, sections and elevations. 8. Contractor shall verify rough opening requirements with manufacturer's unit dimensions and requirements. Provide blocking or shims as required for installation. Where conditions prevent provision of required rough opening, specifics of the situation shall be reported in writing to the Architect. 9. All mounting of equipment, fixtures or accessories - including wall, floor and ceiling installation - shall be as required to meet provisions of the International Building Code and Washington Building Code, 2018 Editions and manufacturer's instructions. In cases of differences contractor shall notify architect in writing. All casework shall be secured to support blocking at walls. 10. Contractor shall notify architect immediately of all utilities determined in the course of construction as being necessary to be removed which have not otherwise been noted for removal. Contractor shall remove such utilities only after consultation with the architect and owner. All utilities removed shall be disconnected, cut back to source and capped. All penetrations created by the removal of utilities shall be sealed to match adjacent construction and finishes. 11. Delays resulting from failure to supply submittals and information shall be the responsibility of the General Contractor. Appropriate stepsshall be taken to make up lost time. 12. Contractor shall maintain project identification sign as per Architect's direction. 13. Contractor shall protect area and new or existing materials and finishes from damage which may occur from construction, demolition, dust, water, etc. and shall provide and maintain temporary barricades, closure walls, etc., as required to protect the public during the period of construction. Damage to new and existing materials, finishes, structures, and equipment shall be repaired or replaced to the satisfaction of the Owner at the expense of the General Contractor. 14. Work areas are to remain secure and lockable during construction. 15. Contractor shall remove all rubbish and waste materials of allsub contractors and trades on a daily basis and shall exercise strict control over job cleaning to prevent any dirt, debris or dust from affecting any finished areas in or outside the job site. Burning of debris on the site shall not be permitted. 16. Upon completion, the Contractor shall leave the premises and all affected areas clean and in an orderly manner ready for move -in. This is to include cleaning of all glass (including inside of exterior glass) and frames, both new and existing. 17. Contractor shall not proceed with any work requiring additional compensation beyond the contract amount without written authorization from the architect or owner's representative. Failure to obtain written authorization shall invalidate any claim for additional compensation. MATERIAL DETAIL PATTERNS Framing Lumber Brick Finish Wood Plywood Sheathing Batt Insulation Gypsum Board Rigid Insulation Concrete Block Concrete Sand Self Compacted Fill/Gravel Fill Ceramic Tile Steel Grout Stucco IT1T111T1TIT1T1Tl?1TTT1T GENERAL REFERENCE Note: Additional legend and symbol references appear throughout the drawings for additional parts of the work, such as landscaping, building elevations, roof plans, ceiling plans, mechanical and electrical drawings. A IM View Number S i Al 01 Sheet Number 1 Ref --w— View Number i a fr rr 1 A101 .1 1 Ref Sheet Number 1 SIM Detail Number A101 Sheet Number I Detail Area Detail Cut Lir ii SIM Room name 101 L-W Roam Number BUILDING REFERENCE GRID Grid line Section Interior Elevation VICINITY MAP S of 17140 SEA LAWN DR, EDMONDS, WA 98026 PROJECT INFORMATION t r.a sr soy Parcel ID: 00566100000200 Detail Callouts Owner: Matthew Paula M Use Code: 111 Single Family Residence - Detached Size (Gross Acres):0.32 Tax Code Area: 00217 Neighborhood: 1504000 �11lall Type Tag SEA LAWN TERRACE DIV B BLK 000 D-00 - LOT 2 Door Tag 1 Story w/ Basement Built: 1967 Room Tag PROJECT DESCRIPTION: REPLACE EXISTING ROTTING JOISTS WITH NEW GLULAM JOISTS. REPLACE WOOD DECKING WITH COMPOSITE DECKING. Centerline ADD STRUCTURAL SUPPORT POSTS AND EXPAND DECK ON NW CORNER. ADD METAL RAILING ON ALL NEW DECKING. North Arrow Reference Grid Wall aligned to face of Grid Line I B _ Wall centered between Grid Lines 0 C Wall not on grid as per dimension J - Dim. to center U F.S.: Dim. to Face of Stud u_ F.W.: Dim. to Face of Wall Assembly F.C.: Dim. to Face of Concrete SHEET LIST Sheet List Sheet Number Sheet Name A101 Title Sheet A102 Site Plan A103.2 Proposed Second Floor Deck A106 Building Sections A105 Structural Details A104 Deck Framing Plan A107 Post Locations A103.1 Existing Deck A102.1 Elevations APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE City Of Edmonds Building Department ------------ Work DECK Address 17140 SEALAWN DR Owner MATTHEW Approved Date 2/21 /2023 Building Official W. X -------------- Permit Number BLD2022-1702 DATE REV1 REV2 REV3 REW REV5 REVISIONS .'AGES - CHANGES �H D E S I G N Kim Hope Design & Build, LLC 17053 44th Ave NE Lake Forest Park, WA 98155 Phone: (206) 427-0599 PROJECT MANAGER: Kim Hope kim@kimhopedesign.com � N 0 C) 100 a' � I J (13 a) U) U) -0 c� o — E O_ r W 4W JF'W�" 2/10/2023 RESUB Feb 13 2023 CITY OF EDMONDS ISSUES & REVISIONS DEVE DOPMENT PARTMENRVICES No. Description Date P-1 Paula Matthew Title Sheet Project number 22 Date 11 /20/2022 Drawn by Kim Hope Checked by Jon Connor PE, SE A101 Scale 2 N Co N co co N 0 N N Third Floor Peak 27'-4 1 /4" Main Level Roof 23'-9 3/4" Third Floor 16'-9" Second Floor Deck 9'-9" Gr0U n0 V South 1/4" = 1'-0" K D E S I G N Kim Hope Design & Build, LLC 17053 44th Ave NE Lake Forest Park, WA 98155 Phone: (206) 427-0599 PROJECT MANAGER: Kim Hope kim@kimhopedesign.com C� � N 0 O 00 (I Q � J (13 N (n (f) -0 (� O E 0 w 2/10/2023 RESUB Feb 13 2023 CITY OF EDMONDS ISSUES & REVISIONS DEVE DOPMENT PARTMENRVICES No. Description Date Paula Matthew Elevations Project number 22 Date 11 /20/2022 Drawn by Author Checked by Checker Al 02.1 Scale 1 /4" = 1'-0" v 00 N co co N O N 04 n Second Floor Deck 3/8" = 1'-0" K D E S I G N Kim Hope Design & Build, LLC 17053 44th Ave NE Lake Forest Park, WA 98155 Phone: (206) 427-0599 PROJECT MANAGER: Kim Hope kim@kimhopedesign.com (D N 0 O CEO O I J (6 Cu Cll (n �U)� C6 O E 0 W 23 RESUB Feb 13 2023 CITY OF EDMONDS ISSUES & REVISIONS DEVE DOPMENT PARTMENRVICES No. Description Date Paula Matthew Existing Deck Project number 22 Date 11 /20/2022 Drawn by Kim Hope Checked by Jon Connor PE, SE Al 03.1 Scale 3/8" = 1'-0" v CO IN co co N O N N 1;:5.000 000 EXISTING RESIDENCE 2 'Al 06 D E S I G N Kim Hope Design &Build, LLC (E) HOUSE EXTERIOR WALL 17053 44th Ave NE FIRST FLOOR ADD (N) POST &FOOTING Lake Forest Park, WA98155 -d° Phone: (206) 427-0599 a d n Q a PROJECT MANAGER: Kim Hope kim@kimhopedesign.com 00 (E) SLAB ON GRADE (E) SLAB ON GRADE � d e UP Q a.6, N 00 se d a 4 VJ o� ode - (E) POST (E) POST co d 4 . a - _ a A a ° _ a a' d e `4 d Al 1 A106 � 14'-7 3/4" 12'-6" N O 00 23'-7" 30'-9" M (� Q 32'-0 1 /2" J ADD (N) POST & FOOTING 55-7 1 /2" n First Floor Dimensioned 0— v-- w wAs�I� EXISTING RESIDENCE 44672 �?URAL '4z�5SIONAL (E) HOUSE EXTERIOR 5 qW 2/10/2023 WALL SECOND FLOOR A105 RES U B 13'-10" 0 Feb 13 2023 OPMENT CITY OF EDMONDS N DEC ISSUES & REVISIONS DEVE D PARTMENRVICES No. Description Date CV UP 6 4 a� A105 A105 co Cn N DECK Paula Matthew 3 105 Proposed Second 23'-7" 12'-6" 20'-8 1 /4" Floor Deck Project number 22 58'-0 1 /2" Date 11 /20/2022 Drawn by Kim Hope Checked by Jon Connor PE, SE 2E n Second Floor Dimensioned Al 000 IN co 3/16" = 1'-0"co M N Scale 3/16" = 1'-0" N L /AIL VI LL `W IV V.V. 3.5"x12" GLB (24F-V4) NOTE: ALL FASTENERS INTO TREATED LUMBER SHALL BE HOT DIP GALVANIZED -ALL CONNECTORS IN CONTACT WITH TREATED LUMBER SHALL BE G185 GALVANIZED Joist Detail Dimensioned 3/8" = 11-011 DECK TENSION TIE, _Y SPACED, EACH K D E S I G N Kim Hope Design & Build, LLC 17053 44th Ave NE Lake Forest Park, WA 98155 Phone: (206) 427-0599 PROJECT MANAGER: Kim Hope kim@kimhopedesign.com CO CV 0 O 00 O � J C6 CI) c� C6 O E W 23 RESUB Feb 13 2023 CITY OF EDMONDS IOPMENT S S U E S & REVISIONS DEVE D PARTMENRVICES No. Description Date Paula Matthew Deck Framing Plan Project number 22 Date 11 /20/2022 Drawn by Kim Hope Checked by Jon Connor PE, SE Al 04 Scale 3/8" = 11-011 LO 00 IN co co CD N 2" CLR TO TOP SCREW (N) COMPOSITE DECKING (N) COMPOSITE DECKING 000 � HDGOLCG TYP 2 X 12" 6 X 12" 2 X 12 JOIST SCREWS @ JOIST PER PLAN K GLULAM STAGGERED SPACING GLULAM BEAM � BEAMS PER PLAN AC6Z 18 GAUGE _ 0 2X12" (TYP) JOIST 2 POST BEAM CONNECTION ° (1 PER SIDE) 3 1/2" LEDGER LOK D E S I G N DECORATIVE OPTION: SCREWS (TYP) SIMPSON APT KNEE BRACE 36" Kim Hope Design & Build, LLC 4X4 PT 5 1/2" LEDGER LOCKS (TYP) MIN 3/4 CLR TO BOT SCREW (N) LEDGER H2.5 @ EA JOIST 17053 44th Ave NE Lake Forest Park, WA98155 ON BOTH SIDES Phone: (206) 427-0599 LUS21-2 @ (N) GLULAM 6X6 PT POST PER PLAN BEAM (TYP) PROJECT MANAGER: Kim Hope kim@kimhopedesign.com TYP 4x4" POST PER PLAN 3 POST TO BEAM DETAIL n BLOCKING DETAIL SECTION JOIST TO BEAM CONNECTION 1 1/2" = V-0" 1 1/2" = V-0" 1 1/2" = 1'-0" PT POST & POST BASE h 6X6 TYP (10 I � N 0 O 00 POST BASE CONNECTION CBSQ-66-SDS BRACKET (E) WALL STUD Q COMPOSITE DECKING � J 3: GRADE FLASHING% 2X12" JOIST (TYP)4-0 Q 2X12" DECK JOIST 0 J0 LUS212 EA JOIST TYP CC 0 ( ) G � 0 2" MIN SPACING o 0 I PT LEDGER o o 7 5„ 0—� w 0 0 3/4" CLR TO 0 0 BOT OF LEDGER I = w �= 11 11 SEAL I F = 1/2 LAG SCREWS @ 10 O.C. STAGGERED SPACING [y OF WASI� �.i. H FTG WIDTH 2 MIN �� 44672 �8110NAL n FOOTING DETAIL n LEDGER ATTACHMENT n JOISTS TO LEDGER DETAIL 2/10/2023 RESUB Feb 13 2023 CITY OF EDMONDS ISSUES & REVISIONS DEVE DOPMENT PARTMENRVICES ol Lo'No. 13'-2" Description Date ol STAIR WIDTH - 4' 4x4" (TYP) TYP RISE - 7 1/2"POST 11 10 - RUN TYP HANDRAIL HEIGHT - 3' Paula Matthew 3" TYP SPACING d LUS212 BRACKET BETWEEN CABLES a GALVANIZED (TYP) Structural Details (N) 4X4" POST PT ° a a ° 6" O.C.° #4 REBAR @A105 a° W/ 4X8" B M °, a.__. ° EACH WAY Y = o Project number 22 - 01 Date 11 /20/2022 Drawn by Kim Hope - a. checked by Jon Connor PE, SE 2 ADD (N) FOOTING Al 0 5 LO Co co n Ground n Ground PER PLAN n TAIR DETAIL 1 1/2" = V-0" 1 1/2" = V-0" 1/4" = 1'-0" Scale As indicated CD N N Third Floor Peak 27'-4 1 /4" i Level Roof 23'-9 3/4" Third Floor 16'-9" Floor Deck 91-911 Section 1 1/4" = 1'-0" \1 YI T/\T 1 VV 1 V V 1 1 1 1 T/\V 1..J L%IIVI TO SUPPORT STAIR RUN L —J 1 Section 2 1/411 = 1'-011 Third Floor Peak A -� '-4 1 /4" V sl Roof '-9 -W V d Floor 16'-911 Ir Deck � 9'-91 I round � W'-� K D E S I G N Kim Hope Design & Build, LLC 17053 44th Ave NE Lake Forest Park, WA 98155 Phone: (206) 427-0599 PROJECT MANAGER: Kim Hope kim@kimhopedesign.com N 0 O 00 (� Q � J 3-0 (� N cn U E w 4WWWW W ' 2/10/2023 RESUB Feb 13 2023 CITY OF EDMONDS ISSUES & REVISIONS DEVE DOPMENT PARTMENRVICES No. Description Date Paula Matthew Building Sections Project number 22 Date 11 /20/2022 Drawn by Kim Hope Checked by Jon Connor PE, SE Al 06 Scale 1 /4" = 1'-011 CO 4? 00 N co co N O N N a4 0 � d " Post Locations 3/8" = 1'-0" (N) POST & FOOTING UNDER STAIRS — — — — — — — — — — — — — r — — r — — r — — T — — T — — T — — °I{ m - a ° F- fe l e { ° a a i ° ° d� 4 ° a '17 : d a `(N) POST (N) 6X6" POST °� . & FOOTING a d L L ° (N) 6X6" POST & FOOTING (N) POST K D E S I G N Kim Hope Design & Build, LLC 17053 44th Ave NE Lake Forest Park, WA 98155 Phone: (206) 427-0599 PROJECT MANAGER: Kim Hope kim@kimhopedesign.com � N CU ^� OM V I i cuICU Y I — IA O O E 0 w 2/10/2023 RESUB Feb 13 2023 CITY OF EDMONDS ISSUES & REVISIONS DEVE DOPMENT PARTMENRVICES No. Description Date Paula Matthew Post Locations Project number 22 Date 11 /20/2022 Drawn by Kim Hope Checked by Jon Connor PE, SE Al 07 Scale 3/8" = 1'-0" r` 00 N co co N O N N