Loading...
APPROVED RESUB3 ENG PLN BLD2022-1060+Site_Plan+9.30.2022_7.59.08_AM+3137884■ ■ OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. rM Property Line ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ a RESUB Sep 30 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT V� IO a City Of Edmonds Building Department werk FENCE - --------- Address 831 PINE ST Owner :_----------ZUBAIR----------- Approved Date. ---------------------- Building OBicial Permit NumberBLD2022-1060 s i APPROVED BY PLANNING ��� ■ Sege ■ Sep 30 2022 ■ ENGINEERING DIVISION APPROVED AS NOTED OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Driveway 09/30/2022 ■ NO STORMWATER MANAGEMENT SYSTEM ■ REQUIRED AT THIS TIME. IF NEW AND/OR REPLACED IMPERVIOUS SURFACE EQUALS ■ 2000SQFT OR GREATER, A STORMWATER MANAGMEMENT SYSTEM MAY BE REQUIRED PER CITY CODES AND STANDARDS ■ SO m Applicant shall repair/replace all ■ damage to utilities or frontage G improvements in City right-of-way ■ per city standards that is caused or occurs during the permitted project. rD ■ ■ ■ IN ■ ■ ■ NExisting Fenc - 0 ko' 4' high non -privacy fence 33 fee .....:....... Proposed Fence ........ ... Mallbox— cn rn: t c \ Y ..............i........................................... Gas line ..................................................... Curb Pine Street r- �3 Driveway Property Line-