Loading...
APPROVED BLD-Carpenter S2.0 rev1REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION lCe',gloox�elal BUILDING OFFICIAL Oct 19 2020 APPROVED DATE III I— — — — — — — — — — — — Da De (E) (E) (E) 37 37 37 00o N LU (E) (E) (E) 00o N LU �(E) (E) (E) F__ — 1 EXISTING SLAB ON GRADE 1 LL=------ 1st Floor Framing & Foundation Plan SCALE: 1/4" = V-0" GENERAL FRAMING NOTES: FOUNDATION NOTES: 1. ALL LVL BEAMS SHALL BE FLUSH AND ALL HEADERS 5. STUD WALLS SHALL BE 2x HF STUDS @ 16"oc, UNO. SEE 1. TYPICAL SLAB ON GRADE AT INTERIOR SHALL BE 4" THICK. DROPPED, UNO. SHEAR WALL, HOLDOWN AND STRAP SCHEDULES ON S1.1 REINFORCE ALL SLABS w/ WWF 6x6 - W2.9xW2.9 AT FOR ADDITIONAL REQUIREMENTS AT SHEAR WALL FRAMING. CENTERLINE. 2. TYP. HEADERS SHALL BE 4x6 DF#2, TYP. UNO. SEE �pj 2/S3.0 FOR INSTALLATION AT 4x AND GLB HEADERS. 6. AT BREAKS IN DOUBLE TOP PLATE OF ALL EXTERIOR WALLS 2. / - INDICATES ANCHOR ROD/HOLDOWN LOCATED AT END AND ALL SHEAR WALLS SEE DETAIL 3/S3.1. OF SHEAR WALL ABOVE, SEE SCHEDULE ON 3/S1.1. 3. PROVIDE (2) BEARING STUDS UNDER EACH END OF ALL BEAMS AND (1) 2x TRIMMER (BEARING) STUD AND (1) 2x 7. SW-X INDICATES SHEAR WALL PER SCHEDULE 2/S1.1. SEE 3. EMBED ALL HORIZONTAL REINFORCEMENT MIN OF 4" INTO (E) KING (FULL -HEIGHT) STUD AT EACH END OF ALL 4x6/4x8 ARCHITECTURAL DRAWINGS FOR ADD'L INFORMATION. ALL CONCRETE w/ SIMPSON SET-XP EPDXY. EXTEND HEADERS, UNO. PROVIDE PT (2)2x TRIMMER STUDS AE NEW, EXTERIOR WALLS SHALL BE SHEATHED PER SW6, UNO REINFORCEMENT 24" OR HOOK. EACH END OF EACH GLB HEADER, TYP, UNO. NAIL STUDS TOGETHER PER GENERAL STRUCTURAL NOTES. 8. REFER TO ARCHITECTURAL DRAWINGS FOR DIM'S NOT 4. TYPICAL PAD FOOTINGS SHALL BE 30" SQ. x 10" D. w/ (3) #4 SHOWN. EW, 3" CLR. OF BTM, SEE DETAIL 11/S3.0. 4. PROVIDE SOLID BEARING BELOW ALL POINT LOADS ABOVE. 9. REFER TO GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. ANNEEENGINEERINGRA, STRUCTUL C 1801 18th Avenue South Seattle, WA 98144 phone: 206.658.5169 mike@anneestructural.com IN V C: Q 3: Q) Ln •— o E w L Q) � Q a--J � _ n L 00 N Pl Revision Issue Date Drawing Set 7/17/2019 Permit Set Al 8/26/2020 Revisions to Permit REVISION Oct 07 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Foundation & 1st Floor Framing Plan SIO