Loading...
APPROVED BLD-Carpenter S2.1 rev12nd Floor & Lower Roof Framing Plan SCALE: 1/4" = V-0" REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION lcelpl� 610ox /e�i( BUILDING OFFICIAL Oct 19 2020 APPROVED DATE 1 S3.0 Upper Roof Framing Plan SCALE: 1/4" = V-0" GENERAL FRAMING NOTES: FLOOR FRAMING NOTES: ROOF FRAMING NOTES: 1. ALL LVL BEAMS SHALL BE FLUSH AND ALL HEADERS 5. STUD WALLS SHALL BE 2x HF STUDS @ 16"oc, UNO. SEE 1. FLOOR SHEATHING SHALL BE MIN .2%2" APA RATED SHEATHING 1. ROOF SHEATHING SHALL BE 1/2" APA RATED SHEATHING DROPPED, UNO. SHEAR WALL, HOLDOWN AND STRAP SCHEDULES ON S1.1 (48/24). NAIL @ ALL PANEL EDGES AND OVER ALL SHEAR WALLS (32/16). NAIL @ ALL FRAMED PANEL EDGES AND OVER ALL FOR ADDITIONAL REQUIREMENTS AT SHEAR WALL FRAMING. w/0.113"O @ 6"oc AND 12"oc TO ALL INTERMEDIATE FRAMING. SHEAR WALLS w/0.131"O @ 6"oc AND 12"oc TO ALL 2. TYP. HEADERS SHALL BE 4x6 DF#2, TYP. UNO. SEE PLACE LONG DIRECTION OF PLYWOOD PERPENDICULAR TO INTERMEDIATE FRAMING. PLACE LONG DIRECTION OF 4/S3.0 FOR INSTALLATION AT 4x AND GLB HEADERS. 6. AT BREAKS IN DOUBLE TOP PLATE OF ALL EXTERIOR WALLS JOISTS DIRECTION, STAGGER PANEL JOINTS. PLYWOOD PERPENDICULAR TO JOISTS DIRECTION, STAGGER AND ALL SHEAR WALLS SEE DETAIL 3/S3.1. PANEL JOINTS. 3. PROVIDE (2) BEARING STUDS UNDER EACH END OF ALL 2. TYPICAL FLOOR FRAMING SHALL BE 2x10 HF #2 @ 16 oc, BEAMS AND (1) 2x TRIMMER (BEARING) STUD AND (1) 2x 7. SW-X INDICATES SHEAR WALL PER SCHEDULE 2/S1.1. SEE DIRECTION PER PLAN. HANGERS SHALL BE SIMPSON LUS210, 2• TYPICAL ROOF FRAMING SHALL BE PRE -MANUFACTURED KING (FULL -HEIGHT) STUD AT EACH END OF ALL 4x6/4x8 ARCHITECTURAL DRAWINGS FOR ADD'L INFORMATION. ALL UNO. MENDING PLATE TRUSSES @ 24"oc UNO. HEADERS, UNO. PROVIDE PT (2)2x TRIMMER STUDS AE NEW, EXTERIOR WALLS SHALL BE SHEATHED PER SW6, UNO 49 3. CONTRACTOR COPY OF EACH END OF EACH GLB HEADER, TYP, UNO. NAIL 3. - INDICATES HOLDOWN LOCATED AT END OF SHEAR WALL TO SUBMIT FINAL TRUSS DESIGN STUDS TOGETHER PER GENERAL STRUCTURAL NOTES. 8. REFER TO ARCHITECTURAL DRAWINGS FOR DIM'S NOT ABOVE, SEE SCHEDULE ON 3/S1.1. SHOP DRAWINGS TO STRUCTURAL ENGINEER FOR SHOWN. �� APPROVAL PRIOR TO FABRICATION. 4. PROVIDE SOLID BEARING BELOW ALL POINT LOADS 4. - INDICATES STRAP AT END OF SHEAR WALL ABOVE, SEE ABOVE. 9. REFER TO GENERAL STRUCTURAL NOTES FOR ADDITIONAL SCHEDULE ON 1/S1.1. REQUIREMENTS. ANNEEENGINEERINGRA, STRUCTUL C 1801 18th Avenue South Seattle, WA 98144 phone: 206.658.5169 mike@anneestructural.com 1-1 7-2019 U C: Q 3: Q) Ln •— o E w L Q) a� Q a--J � _ n L 00 N Pl Revision Issue Date Drawing Set 7/17/2019 Permit Set Al 8/26/2020 Revisions to Permit REVISION Oct 07 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 2nd Floor &Roof Framing Plans S11