APPROVED BLD-Carpenter S3.0 rev1PRE -MANUFACTURED TRUSS & SHEATHING PER PLAN 0.131"0 @ 6"oc TO 2x/LSL OR TRUSS BLK'G EXTEND SHEAR WALL SHEATHING AND NAIL TO BLK'G PER SW SCHEDULE SHEAR WALL PER PLAN H2.5A @ 24"oc & AT GABLE ENDS Trusses Perpendicular to Exterior Wall 3/4" = V-0" 0.131"0 NAILS @ 6"0c LX1S 11NU RAk I LRS & SHEATHING PER PLAN 2x LEDGER TO FRAMING w/ (2) ROWS SDS%4x3-% SCREWS @ 16 oc, (E) RAFTERS TO LEDGER w/ LUS HANGER, SEAT -CUT RAFTERS AS REQ'D BEAM PER PLAN PLATE NAILING PER SW SCHEDULE SHEATHING TO BLK'G w/ (4) 0.113"0 JOISTS & SHEATHING PER PLAN BLK'G @ 48"oc TO BEAM w/ HANGERS PER PLAN New Floor Framina Adi. to Exist. PerD. Roof 3/4" = V-0" SHEAR WALL PER PLAN PANEL EDGE NAILING PER SW SCHEDULE, TYP z xa Z 2: (2) #4 CONT BOT A. BOLT PER SW SCHEDULE (%$"O @ 48"oc ELSEWHERE) SLAB ON GRADE PER PLAN REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION /ra BUILDING OFFICIAL Oct 19 2020 APPROVED DA- PANEL EDGE NAILING PER SW SCHEDULE SHEAR WALL PER PLAN �l■IrrrE.■rit0111111.1 2x Rafters Parallel to Exterior Wall 3/4" = V-0" SHEAR WALL PER PLAN (WHERE OCCURS) NAILING PER SW SCHEDULE, TYP I -III —III III �III INSULATION PER IIIIIII III IIII lil IIII III���II ARCHITECT =III=III — — _ • — I—iII =III III —III —I I— #4 @ 12"oc EACH WAY, I I IE. I I M. I I I- —I I (2) #4 CONT @ TOP, III— ALT HOOKS @ BOT INSULATION PER V-6" II I I I I I IIi1I I I ARCHITECT Stem Wall/Footing @ Exterior Wall 3/4" = V-0" ILAN L AB PER SW SCHEDULE (%8"O @ 48"oc ELSEWHERE) SLAB ON GRADE PER PLAN (2)#4 CONTINUOUS Thickened Slab - Continuous Footin 3/4" = V-0" 0.131"0 @ 6"oc TO 2x BLK'G (NOTCH BLK'G AS REQ'- ran VENTIL NOTCH RAFTERS 7 5-%" DEPTH AT >HEATHING oc EXTEND SHEATHING TC AND APPLY PANEI NAILING PER SW SCF SHEAF PE 2x Rafters Perp. to Exterior Wall 3/4" = V-0" SHEAR WALL PER PLAN 0.131"0 NAILS @ 6"0c RAFTERS & SHEATHING PER PLAN BLK'G @ MID -HEIGHT OF WALL PER GEN. STRUCT. NOTES 2x LEDGER TO FRAMING w/ (2) ROWS SDS%4x3-% SCREWS @ 16"oc SHEAR WALL PER PLAN Low Roof Rafters to Full-Ht. Wall Framing 3/4" = V-0" COLUMN, PER PLAN, IN EXISTING WALL FRAMING COLUMN PER PLAN POST, PLINTH & FTG I EXISTING I I /—SHEATHING ATH N JOISTS AND I Crawlspace Post & Footin 3/4" = V-0" COLUMN TO WALL FRAMING ABOVE w/ (2) A34 CLIPS AS SHOWN ABU POST BASE REINF PER PLAN TYP STU MULTI -STUD PER PLAN, NAILING PER GEN NOTES Header Support, Typ. 3/4" = V-0" 0.131"0 @ 6"oc TO ALIGNED RAFTER (2) 0.131"0 @ EACH BLK EXISTING RAFTERS TVD nnl IRI G NAIL SHEATHING TO 2x BLK'G (@ 48"oc) w/ (4) 0.131" 0 RAFTERS & SHEATHING PER PLAN A35 CLIPS PER SW SCHEDULE FRAME WALL PER SW6 ON SHEAR WALL SCHEDULE 0.131"0 @ 6"oc FROM PLATE TO RIM LAP SHEATHING ON RIM AND APPLY PANEL EDGE NAILING PER SW SCHEDULE Dormer Roof Framina Adiacent to Existina Roof 3/4" = V-0" NAIL BTM. PLATE TO (E) BLK'G w/ PLATE NAILING PER SW SCHEDULE EXTEND SHEATHING OVER (E) BLK'G AND APPLY PANEL EDGE NAILING PER SW SCHEDULE SHEATH EXISTING WALL PER SW SCHEDULE A /- I I r--- --- ' -- - - - - - -- r- -' -L' -- -- r% - - r 3/4" = V-0" :R SW6 ON ;HEDULE SES SING ANNEEENGINEERING, STRUCTURAL L C 1801 18th Avenue South Seattle, WA 98144 phone: 206.658.5169 mike@anneestructural.com C i i 0 E LU N > Q a-J Lli 00 ,--1 N Revision Issue Date Drawing Set 7/17/2019 Permit Set Al 8/26/2020 Revisions to Permit REVISION Oct 07 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Structural Details SIO