APPROVED BLD PLN RESUB 2-BLD2023-0469-Site Plan 5.3.23NORTH
, - _ . x �� �
30ft to propertyline
_ . „>s ,
} y }`
- iy � ■x
. }. i -T•
'�
� % � .X � '�
s
1
'� I 1.
�. —
APPROVED BY PLANNING
May 03 2023
_�L: y�
Noise generated by mechanical
equipment must meet the
standards in ECC 5.30
RM-1.5 `' g'
Zone -- Corner N�'�Fla IIY��'�
Setbacks: Required Actual
Front :.... �..._ __ __�,
Sides �� '�..ea�.:
Rear �__ - __-�__�
Other i..... �.._. ....�.. �'
Height ��� ��ex.'
Nothing in the permit approval process shall be
interpreted as allowing or permitting the maintenance
of any currently existing illegal, nonconforming or
unpermitted building, structure or site condition which
outside [he scope of [he permit application, regardless
of whether such building, structure or condition is
shown an the site plan or drawing. Such building,
structure or condition may be the subject of a separate
enforcement action.
City Of Edmonds
Building Department
--
Work, HEATPUMP �,
Address 656 DALEY ST #102
Owner r HURT
Approved Dale 05/04/2023 _
Building OFfcial EYw Carter
Permit Number BLD2023-0469
If mounted on the ground and located within a required setback area, the
height of any heat pump and supporting pad must be less than 36 inches tall
(original grade to top of heal pump). If mounted on an exterior wall and located
within a required setback area, a heat pump cannot project more than 30
inches into the required setback area.
ALL WORK SUBJECT APPROVED
TO FIELD PLANS MUST BE
INSPECTION FOR
CODE COMPLIANCE ON JOB SITE
OBTAIN ELECTRICAL
PERMIT FROM
STATE LABOR &
INDUSTRIES RESUB
May 03 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT