Loading...
REVIEWED BLD BLD2021-1319+RAILING-MANUF SPECS+9.27.2021_12.24.04_PM+2430309M/7F� Cable Railing Installation Instructions VI E W R A I L Overview In this installation, you're going to: • run cable through posts, • crimp a fitting onto one end, • measure and cut the cable, • then crimp a fitting onto the other end of the cable and tension it. Table of Contents Read over the provided material prior to the start of your installation CableRailing Hardware........................................................................................... 2 Post to Post - Order of Installation........................................................................... 3 Level Tension Kit to Level Tension Kit ...................... I ......... I ......... I ......... I.............. 5 Inside Post Mount Kit to Level Tension Kit ......................................................... 9 Angle Tension Kit to Angle Tension Kit ......... . ......... . ......... ......... I ......... I ......... I .......... 13 Inside Post Mount Kit to Angle Tension Kit.............................................................. 17 Cable Post Hardware Identification & Quantities Chart . ......... . ......... . ......... . ........ . 21 Tools Needed for this Installation 5 Gal Bucket Neoprene Sleeve Multi -Function Hand Tool Pliers 5/32" Allen Wrench Driver Block v Painter's Tape & Marker Dead Blow Hammer © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail Cable Railing Installation Instructions VI Modified: 0911412021 M/7F� Cable Railing Hardware VI E W R A I L light To view our interactive post page go to https://www.viewrai1.com/resource-center/interactive-post-page or scan this code with your smartphone. Post/Component Reference Each type of Viewrail Post is listed below in blue along with the cable components that go with it. A Post B-Up/B-Down Post Level Tension Kit Angle Tension Kit A-2 Post C Post Steel Insert Sleeve Level Tension Kit Inside Post Mount Kit A-5 Post No Fittings D Post Angle Tension Kit B-5 Post Level Tension Kit Adhesive Sleeve F Post Inside Post Mount Kit Here's a quick rundown of the posts and components you'll be using, though you probably won't use all of them. Tension Receiver Paired with the Threaded Crimp Fitting, this part is tightened with an Allen wrench to create cable tension. Threaded Crimp Fitting Double -crimped to cable, this part is threaded into a Tension Receiver to create cable tension. Inside Post Mount Fitting The cable is inserted through the oval washer & crimped in the cable stop. It locks into the inside of the post through a 5/16" hole. Adhesive Sleeve .! Threaded onto cable, this part '0. adheres to the post face to cover 'j angled or Inside Post Mount holes. Admry Steel Insert Sleeve Threaded onto cable, this part is inserted into level half -inch post tt holes to create a finished look. Angle Washer This part is used to modify the Tension Receiver for use on an angle. Available in job -specific angles. To view a quantified list of which components go with each post, view pages 21 and 22 G Post Adhesive Sleeve (All Cables Pass Through Post) H Post Inside Post Mount Kit Adhesive Sleeve (Bottom 10 cables pass through Post) I Post Angle Tension Kit Level Tension Kit Inside Post Mount Kit J-Up/J-Down Post Inside Post Mount Kit R Post Inside Post Mount Kit S Post No Fittings © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 2 Cable Railing Installation Instructions V17 Modified: 0911412021 MA7-,-: VI E W R A I L Post to Post - Order of Installation Through hundreds of on site installations, we have come up with the best order to install posts into your system depending on what posts are being used. Please review the table below and compare it against your order contents to find the best way for you to have an easy installation. Configuration A to C' Configuration Description Level Tension To Level Tension Order of Installation Start with C A to C' Level Tension to Inside Post Mount Start with C A to F Level Tension to Inside Post Mount Start with F A to A V Level Tension To Level Tension A to H Level Tension to pass through cables and Inside Post Mount Start with H A to G A to I Level Tension to pass through cables Level Tension to Level Tension Start with G Start with I A to D Level Tension to Level Tension Start with D A to P Level Tension to Inside Post Mount Start with R Configuration Description Inside Post Mount to Level Tension Kit • . F to D Start with F F to I Inside Post Mount to Level Tension Kit Start with F F to C2 Configuration C to D' Inside Post Mount to Level Tension Kit Start with F Configuration Description Level Tension to Level Tension Order of Installation% Start with C C' to D Inside Post Mount to Level Tension Start with C C' to I Level Tension to Level Tension Start with C C' to I Inside Post Mount to Level Tension Start with C C to H2 Level Tension to pass through cables and Inside Post Mount Start with H C' to G Level Tension to pass through cables Start with G C to R2 Level Tension to Inside Post Mount Start with R ' Depending on C post orientation 2 Can't have inside post mount to inside post mount MW Continued on next pa� © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 3 Cable Railing Installation Instructions VI Modified: 0911412021 Post to Post - Order of Installation (Continued) Monfiguratio R to D Configuration Description Inside Post Mount to Level Tension •rder of Installatiom Start with R R to I Inside Post Mount to Level Tension Start with R Configuration Description Angle Tension to Angle Tension v . Start with B Up B Up to B Down B Up to D Angle Tension to Angle Tension Start with B Up B Up to I Angle Tension to Angle Tension Start with B Up B Up to J Down Angle Tension to Inside Post Mount Start with J Down B Up through G to A Angle Tension, through G, to Level Tension Start with B Up B Up through G to C Angle Tension, through G, to Level Tension Start with B Up B Up through H to A Angle Tension, through H, to Level Tension Start with B Up 3 Up through H to C Angle Tension, through H, to Level Tension Start with B Up Configuration J Up to B Down Configuration Description _mwrder Inside Post Mount to Angle Tension of Installatiom Start with J Up J Up to I Inside Post Mount to Angle Tension Start with J Up J Up to D Inside Post Mount to Angle Tension Start with J Up J Up through G to A Inside Post Mount, through G, to Level Tension Start with J Up J Up through G to C Inside Post Mount, through G, to Level Tension Start with J Up J Up through H to A Inside Post Mount, through H, to Level Tension Start with J Up J Up through H to C Inside Post Mount, through H, to Level Tension Start with J Up To view our interactive post page go to https://www.viewrai1.com/resource-center/interactive-post-page or scan this code with your smartphone. light Youbbe Visit our YouTube channel to watch helpful installation videos youtube.com/viewrail © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 4 Cable Railing Installation Instructions VI Modified: 0911412021 MA7—,-: Cable Railing Installation Guide V I E W R A I L Level Tension Kit to Level Tension Kit Steel Tension Insert Receiver Threaded Sleeve V Crimp V Fitting 1 � ���)���)�►-�t —w Threaded wo Crimp Steel Fitting Tension Receiver Insert Sleeve Level Tension Receiver https://www.youtube.com/watch?v=4JukKiLef2M © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewraiLcom • For Helpful Tutorials go to www.youtube.com/viewrail 5 Cable Railing Installation Instructions V17 Modified: 0911412021 Cable Railing Installation Steps - Level Tension Kit to Level Tension Kit • Take the loose end of your cable spool and slide the cable through the posts on the run you are working on • Since both ends of the cable will use the same type of post holes, it does not matter which end you start from • As you are running the cable through the posts, place the metal sleeves on the cable facing the each post hole • Steel Insert Sleeves will get tapped into the 1/2" holes on level runs • "A-5" intermediate posts will not receive sleeves • Thread a Tension Receiver onto the Threaded Crimp fitting four full turns • Pull the cable back against the post so the Tension Receiver is pulled into the post n I_ • • Y %" (Comp Here) • Once the cable passes through the final post on the run, crimp a Threaded Crimp Fitting onto the end of the cable • Crimp the Threaded Crimp Fitting then turn it 90' and crimp it again M • Return to the other end of the run where the Level Tension Kit will be installed nearest the spool, and pull the cable tight for the full run • Place painter's tape on the cable where the cable meets the inside edge of the post © 2021 VIEWRAIL All Rights Reserved - (866) 261-8013 • viewrail.com - For Helpful Tutorials go to www.youtube.com/viewrail 6 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Level Tension Kit to Level Tension Kit o �• • .0 • • e 311— 411 • Use the side cutting tool located below the main crimping head to cut your cable • Slide the cable through the cable cutter and cut the cable 3" - 4" extra past the outside edge of the post d of Cable o 0 • Remove the cable from the post • Add and mark 1/2" past the painter's tape • Cut the cable on this mark 8 ,/s1 %° (Crimp Here) • Before continuing, confirm that all your needed sleeves • Crimp a Threaded Crimp fitting onto the second end are in place on the cable run of the cable • This will be the last time you will be able to add sleeves • Crimp the Threaded Crimp Fitting then turn it 90' on the cable and crimp it again © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 7 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Level Tension Kit to Level Tension Kit • Insert the Threaded Crimp Fitting into the'/2" hole on the inside face of the post • Then, insert the Tension Receiver into the'/2" hole on the outside face of the post • Meet both in the middle of the post and thread the Tension Receiver onto the Crimp Fitting four full turns -11 • Use dead blow hammer and the provided Driver Block to set the Steel Insert Sleeves into each'/2" hole • A very firm hit is needed • Do this for every sleeve on the run • Slide the protective Neoprene Sleeve onto the cable near the post you are working on • Firmly grasp the sleeve with pliers and use the supplied 5/32" Allen wrench to tighten the Tension Receiver only snug enough to hold in place • After all the cable runs are done and the Insert Sleeves are placed, use the Allen wrench to tighten the remaining side of the cable run in sequence • Holding the cable with the pliers & neoprene sleeve, tighten until the cable is taut and then turn the Tension Receiver another half turn Congratulations! You're done. We'd love to see your work! Snap a few pics with your phone and send them to pictures@viewrail.com. Thanks for choosing Viewrail. Enjoy your new installation! © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 8 Cable Railing Installation Instructions VI Modified: 0911412021 VI E W R A I L Cable A Termination Washer Adhesive Sleeve Inside Post Mount https://www.youtube.com/watch?v=a8u8Nb-HLhc Cable Railing Installation Guide Inside Post Mount Kit to Level Tension Kit A Steel Insert Sleeve Threaded Crimp Fitting V A Tension Receiver Level Tension Receiver https://www.youtube.com/watch?v=4JukKiLef2M © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • vlewrail.com • For Helpful Tutorials go to www.youtube.com/viewrall 9 Cable Nailing Installatlon Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Inside Post Mount Kit to Level Tension Kit A • Take the loose end of your cable spool & slide the cable through the post that will receive the Level Tension Kit • Pass the cable all the way down the run, through any intermediate posts, until it meets the 5/,5" hole • As you are running the cable through the posts, place the metal sleeves on the cable facing the each post hole • Steel Insert Sleeves will get tapped into the'/z" holes on level runs • Adhesive Sleeves will adhere to 5/16" holes on "C", "R", or "F" end posts • "A-5" intermediate posts will not receive any sleeves • Insert the Cable Stop into the 5/16" hole • Then turn the Termination Washer (shown above) and slide it into the 5/16" hole as well • Pull the cable back and the Cable Stop and Termination Washer will lock against the inside of the post • Slide the loose end of the cable through the Adhesive Sleeve, then the Termination Washer, and into the Cable Stop • Crimp the Cable Stop on to the end of the cable, then turn it 90' and crimp it again Note: In order to free a Termination washer from the metal frame they come on, you must bend one back and forth a couple times and it will break free N • Return to the other end of the run where the Level Tension Kit will be installed nearest the spool, and pull the cable tight for the full run • Place painter's tape on the cable where the cable meets the inside edge of the post © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 10 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Inside Post Mount Kit to Level Tension Kit 5 311— 411 • Use the side cutting tool located below the main crimping head to cut your cable • Slide the cable through the cable cutter and cut the cable 3" - 4" extra past the outside edge of the post • Before continuing, confirm that all your needed sleeves are in place on the cable run • This will be the last time you will be able to add sleeves on the cable 0 0 • of • • - • Remove the cable from the post • Add and mark 1/2" past the painter's tape • Cut the cable on this mark 4 1/1fi 1 (Crimp Here) • Crimp a Threaded Crimp fitting onto the second end of the cable • Crimp the Threaded Crimp Fitting then turn it 90' and crimp it again © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com . For Helpful Tutorials go to www.youtube.com/viewrail 11 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Inside Post Mount Kit to Level Tension Kit • Insert the Threaded Crimp Fitting into the'/2" hole on the inside face of the post • Then, insert the Tension Receiver into the'/2" hole on the outside face of the post • Meet both in the middle of the post and thread the Tension Receiver onto the Crimp Fitting four full turns -11 • Use dead blow hammer and the provided Driver Block to set the Steel Insert Sleeves into each'/2" hole • A very firm hit is needed • Do this for every sleeve on the run • Slide the protective Neoprene Sleeve onto the cable near the post you are working on • Firmly grasp the sleeve with pliers and use the supplied 5/32" Allen wrench to tighten the Tension Receiver only snug enough to hold in place 12 -- 9 5 3 —� 10 • After all the cable runs are done and the Insert Sleeves are placed, use the Allen wrench to tighten the Level Tension Kit side of the cable run in sequence • Holding the cable with the pliers & neoprene sleeve, tighten until the cable is taut and then turn the Tension Receiver another half turn Congratulations! You're done. We'd love to see your work! Snap a few pics with your phone and send them to pictures@viewrail.com. Thanks for choosing Viewrail. Enjoy your new installation! © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 12 Cable Railing Installation Instructions VI Modified: 0911412021 MA7-,-: VI E W R A I L Threaded Cable Railing Installation Guide Angle Tension Kit to Angle Tension Kit Adhesive Sleeve Angle Washer Crimp Tension Fitting 04 Receiver Tension Threaded Receiver , VIP Crimp Angle Washer Adhesive Sleeve IIII ■.. III.'. I'II'II'I ■ III. ,. 1 IIII. �.�. IIII I I.I...I IIII.I.'i H. �. I'�I �� I u'1' I' '"II'II''II.I: II'' I III I I ■I..II. ���, ■II ■II'..1 loll III 'I ❑� 'I.I'.'I�I I:;:;,I�' IIII III Fitting Angle Tension Receiver https://www.youtube.com/watch?v=ydRJMAiIYAQ © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 13 Cable Railing Installation Instructions V17 Modified: 0911412021 Cable Railing Installation Steps - Angle Tension Kit to Angle Tension Kit • Take the loose end of your cable spool and slide the cable through the posts on the run you are working on • It is typically easiest to run the cable up through the bottom post towards the top post • As you are running the cable through the posts, place the metal sleeves on the cable facing the post hole to which they will attach • Adhesive sleeves will attach to each 5/,6" hole on an angled run 3 11 0, • Slide a Angle Washer over the Threaded Crimp Fitting • Thread a Tension Receiver onto the Threaded Crimp fitting four full turns '/s" 3/$n (Crimp Here) • Once the cable passes through the final post on the run, crimp a Threaded Crimp Fitting onto the end of the cable • Crimp the Threaded Crimp Fitting then turn it 90e and crimp it again • Pull the cable back against the post so the Tension Receiver is pulled into the Angle Washer • Ensure the Angle washer rests flush against the side of the post © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 14 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Angle Tension Kit to Angle Tension Kit • Return to the other end of the run where the Angle Tension Kit will be installed nearest the spool, and pull the cable tight for the full run • Place painter's tape on the cable where the cable meets the inside edge of the post 1 1/2 End of Cable 1 • Remove the cable from the post • Add and mark 1'/2" past the painter's tape • Cut the cable on this mark j 00 / • 3 � • • • Use the side cutting tool located below the main crimping head to cut your cable • Slide the cable through the cable cutter and cut the cable 3" - 4" extra past the outside edge of the post • Before continuing, confirm that all your needed sleeves are in place on the cable run • This will be the last time you will be able to add sleeves on the cable © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 15 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Angle Tension Kit to Angle Tension Kit r9 1/s" %" (Crimp Here) • Crimp a Threaded Crimp fitting onto the second end of the cable • Crimp the Threaded Crimp Fitting then turn it 90' and crimp it again A Neoprene Sleeve • Slide the protective Neoprene Sleeve onto the cable near the post you are working on • Firmly grasp the sleeve with pliers and use the supplied 5/32" Allen wrench to tighten the Tension Receiver only snug enough to hold in place • Insert the Threaded Crimp Fitting into the 5/15" hole on the inside face of the post • Then, insert the Tension Receiver through the Angle Washer and then into the 1/2" hole on the outside face of the post • Meet both in the middle of the post and thread the Tension Receiver onto the Crimp Fitting four full turns • Remove the plastic cover on the Adhesive Sleeves and firmly press the sleeve against the 5/16" holes on the run • After all the cable runs are done and the Adhesive Sleeves are placed, use the Allen wrench to tighten the remaining side of the cable run in sequence • Holding the cable with the pliers & neoprene sleeve, tighten until the cable is taut and then turn the Tension Receiver another half turn Congratulations! You're done. We'd love to see your work! Snap a few pics with your phone and send them to pictures@viewrail.com. Thanks for choosing Viewrail. Enjoy your new installation! © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 - viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 16 Cable Railing Installation Instructions VI Modified: 0911412021 VI E W R A I L Adhesive Sleeve Cable Stop T A Termination Washer Inside Post Mount https://www.youtube.com/watch?v=a8u8Nb-HLhc Cable Railing Installation Guide Inside Post Mount Kit to Angle Tension Kit Adhesive Sleeve Threaded Crimp Fitting Tension Receiver n:c A Angle Washer Angle Tension Receiver https: www.youtube.com/watch?v=ydRJMAilYAQ © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 17 Cable Railing Installation Instructions V17 Modified: 0911412021 Cable Railing Installation Steps - Inside Post Mount Kit to Angle Tension Kit • Take the loose end of your cable spool and slide the cable through the posts on the run you are working on • It is typically easiest to run the cable up through the bottom post towards the top post • As you are running the cable through the posts, place the metal sleeves on the cable facing the post hole to which they will attach • Adhesive sleeves will attach to each 5/,6" hole on an angled run • Insert the Cable Stop into the 5/16" hole • Then turn the Termination Washer (shown above) and slide it into the 5/16" hole as well • Pull the cable back and the Cable Stop and Termination Washer will lock against the inside of the post • Slide the loose end of the cable through the Adhesive Sleeve, then the Termination Washer, and into the Cable Stop • Crimp the Cable Stop on to the end of the cable, then turn it 90' and crimp it again Note: In order to free a Termination washer from the metal frame they come on, you must bend one back and forth a couple times and it will break free • Return to the other end of the run where the Angle Tension Kit will be installed nearest the spool, and pull the cable tight for the full run • Place painter's tape on the cable where the cable meets the inside edge of the post © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 18 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Inside Post Mount Kit to Angle Tension Kit • Use the side cutting tool located below the main crimping head to cut your cable • Slide the cable through the cable cutter and cut the cable 3" - 4" extra past the outside edge of the post • Before continuing, confirm that all your needed sleeves are in place on the cable run • This will be the last time you will be able to add sleeves on the cable. • Remove the cable from the post • Add and mark 11/2" past the painter's tape • Cut the cable on this mark *._ 1/s" %° (Crimp Here) • Crimp a Threaded Crimp fitting onto the second end of the cable • Crimp the Threaded Crimp Fitting then turn it 90' and crimp it again © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 19 Cable Railing Installation Instructions VI Modified: 0911412021 Cable Railing Installation Steps - Inside Post Mount Kit to Angle Tension Kit r9 PN • Insert the Threaded Crimp Fitting into the 5/16" hole on the inside face of the post • Then, insert the Tension Receiver into the'/2" hole on the outside face of the post • Meet both in the middle of the post and thread the Tension Receiver onto the Crimp Fitting four full turns • Remove the plastic cover on the Adhesive Sleeve and firmly press the sleeve against the 5/16" holes on the run • After all the cable runs are done and the Adhesive Sleeves are placed, use the Allen wrench to tighten the remaining side of the cable run in sequence • Holding the cable with the pliers & neoprene sleeve, tighten until the cable is taut and then turn the Tension Receiver another half turn 10 Neoprene Sleeve • Slide the protective Neoprene Sleeve onto the cable near the post you are working on • Firmly grasp the sleeve with pliers and use the supplied 5/32" Allen wrench to tighten the Tension Receiver only snug enough to hold in place Congratulations! You're done. We'd love to see your work! Snap a few pics with your phone and send them to pictures@viewrail.com. Thanks for choosing Viewrail. Enjoy your new installation! © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail 20 Cable Railing Installation Instructions VI Modified: 0911412021 VI E W R A I L A Post 36" 39" 42" A-2 Post 36" 39" 42" A-5 Post All Post Heights B Down Post 36" 39" 42" B Up Post 36" 39" 42" B-5 36" 39" 42" C Post 36" 39" 42" D Post 36" 39" 42" Threaded Crimps Qty 10 Qty 11 Qty 12 Insert Sleeves Qty 20 Qty 22 Qty 24 No Hardware Needed Threaded Crimps Qty 10 Qty 11 Qty 12 Threaded Crimps Qty 10 Qty 11 Qty 12 Adhesive Sleeves Qty 20 Qty 22 Qty 24 Threaded Crimps Qty 10 Qty 11 Qty 12 Post -Side Handrail Bracket Qty 1 Qty 1 Qty 1 Cable Post Hardware Identification & Quantities Chart Tension Receivers Qty 10 Qty 11 Qty 12 Tension Receivers Qty 10 Qty 11 Qty 12 Tension Receivers Qty 10 Qty 11 Qty 12 i - Tension Receivers Qty 10 Qty 11 Qty 12 Threaded Crimps Qty 20 Qty 22 Qty 24 Insert Sleeves Qty 10 Qty 11 400 Qty 12 Threaded Crimp Tension Receiver Steel Insert Sleeve Adhesive Sleeve Fitting Angle Washers Qty 10 Qty 11 Qty 12 Angle Washers Qty 10 Qty 11 Qty 12 Insert Sleeves Qty 10 Qty 11 Qty 12 Tension Receivers Qty 20 Qty 22 Qty 24 Angle Washer Termination Washer Cable Stop Post -Side Handrail Bracket Images shown here are not to scale / Not all orders will have all hardware shown Termination Washers Qty 10 Qty 11 Qty 12 Insert Sleeves Qty 10 Qty 11 Qty 12 Adhesive Sleeves Qty 10 Qty 11 Qty 12 Adhesive Sleeves Qty 10 Qty 11 Qty 12 Cable Stops Qty 10 Qty 11 Qty 12 Angle Washers Qty 10 Qty 11 Qty 12 Images shown here are not to scale / Not all orders will have all hardware shown © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail.com • For Helpful Tutorials go to www.youtube.com/viewrail Cable Railing Installation Instructions V 17 Modified: 0911412021 21 VI E W R A I L 0 1 00 0 4/0 j Threaded Crimp Tension Receiver Steel Insert Sleeve Adhesive Sleeve Angle Washer Termination Washer Fitting Images shown here are not to scale / Not all orders will have all hardware shown G Post 36" 39" 42" H Post 39" 42" 1 Post 39" 42" J Down Post 36" 39" 42" J Up Post 36" 39" 42" R Post 36" 39" 42" S Post All Post Heights Post -Side Handrail Bracket Qty 1 Qty 1 Qty 1 Post -Side Handrail Bracket Qty 1 Qty 1 Post -Side Handrail Bracket Qty 1 Qty 1 Termination Washers Qty 10 Qty 11 Qty 12 Termination Washers Qty 10 Qty 11 Qty 12 Termination Washers Qty 10 Qty 11 Qty 12 No Hardware Needed Adhesive Sleeves Qty 20 Qty 22 Qty 24 Adhesive Sleeves Qty 21 Qty 22 Threaded Crimps Qty 21 Qty 22 Cable Stops Qty 10 Qty 11 Qty 12 Cable Stops Qty 10 Qty 11 Qty 12 Cable Stops Qty 10 Qty 11 Qty 12 Cable Stops Qty 1 Qty 2 Tension Receivers Qty 21 Qty 22 Adhesive Sleeves Qty 10 Qty 11 Qty 12 Adhesive Sleeves Qty 10 Qty 11 Qty 12 Adhesive Sleeves Qty 10 Qty 11 Qty 12 Cable Stop Post -Side Handrail Bracket Termination Washers Qty 1 Qty 2 Insert Sleeves Qty 11 Qty 12 Adhesive Sleeves Qty 10 Qty 10 Angle Washers Qty 10 Qty 10 © 2021 VIEWRAIL All Rights Reserved • (866) 261-8013 • viewrail,com • For Helpful Tutorials go to www.youtube.com/viewrail Cable Railing Installation Instructions VI Modified: 0911412021 22