Loading...
APPROVED BLD2022-0518+Material List 1+4.22.2022RECEIVED Apr 26 2022 DEVELQPMENT SERVICES Plans: columns will be bolted to the deck using brackets South East column attached to house 24 foot beam connecting the 2 West beams connected with braces and brackets 12 foot beams connecting the columns that run East to West, connected with braces and brackets 12 foot beam running East to West down the center connecting to the house 14 foot joist/supporting beams frame the roof. Set 16 inches apart and attached to the 12 foot beams Plywood roof on top of joists and support beams Plywood covered with roofing fabric and shingles Flashing on south, west, and north side of the overhang and added to the existing roof ------------------------------------- - - - - -- -- Approval based on provided documentation. Structure completed prior to permit and has not had progress inspections by the City. Approval is for life safety only. ------------------------------------- City Of Edmonds Building Department Work ROOF COVER OVER DECL Address 1157 8TH AVE S Owner HANSEN Approved Date 04/27/2022 Building Official Eri4, Ca+*,r Permit Number BLD2022-0518