APPROVED BLD2022-0518+Material List 1+4.22.2022RECEIVED
Apr 26 2022
DEVELQPMENT SERVICES
Plans:
columns will be bolted to the deck using brackets South East column attached to house
24 foot beam connecting the 2 West beams connected with braces and brackets
12 foot beams connecting the columns that run East to West, connected with braces and brackets
12 foot beam running East to West down the center connecting to the house
14 foot joist/supporting beams frame the roof. Set 16 inches apart and attached to the 12 foot beams
Plywood roof on top of joists and support beams
Plywood covered with roofing fabric and shingles
Flashing on south, west, and north side of the overhang and added to the existing roof
------------------------------------- - - - - -- --
Approval based on provided documentation.
Structure completed prior to permit and has not
had progress inspections by the City. Approval is
for life safety only.
-------------------------------------
City Of Edmonds
Building Department
Work ROOF COVER OVER DECL
Address 1157 8TH AVE S
Owner HANSEN
Approved Date 04/27/2022
Building Official Eri4, Ca+*,r
Permit Number BLD2022-0518