Loading...
APPROVED Scope of workLDLRGROUPI SALUS a division of DLR Group inc. a Washington corporation 51 University Street, Suite 600 Seattle, WA 981oi January 30th, 2023 Re: Swedish Edmonds MRI Suite Permit No. BLD2022-1221 DoH No. 61371595 DLR Group Project No.: 73-21017-00 Dear Christina BarsonlEric Carter: REVISION Jan 30 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2022-1221 REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION Eric, C44^ter Feb 08 2023 APPROVED DATE This Letter is to inform the City of Edmonds reviewer team, of the modifications that was required to be made to the project. Though it is not a major design impact, we are sharing the attached drawings per your request. We hope this is a quick review as we are experiencing project delay. The challenge was the existing concrete structural wall to the right of the Door entering the X-Ray Suite (adjacent to the MRI suite we are designing). We had to maintain this structural wall in place, therefore the lead door also had to remain in place — causing the control booth to be massaged to accommodate the staffing needs. Instead of the Control Booth east wall being angled, we straightened the design. And in order to avoid any changes to the X-Ray Room Unistrut's & existing structure, the Control Booth wall, will be a partial height wall. Therefore, the major design change is the sharing wall between MRI Suite and the X- Ray Suite. Please let us know if you have any questions. Sincerely, DLR Group I Salus Mahta Ahmadnia Project Manager I Associate Cc: Christina Millan Encl: PDF of Updated Design Modification ELEVATE the HUMAN EXPERIENCE THROUGH DESIGN