Loading...
BLD2022-1221+SIGNED_SPECIAL_INSP_AGREE+11.10.2022_4.46.00_PM+3215047SPECIAL INSPECTION AND TESTING AGREEMENT Permit #: Project: _BLD2022-1221 21601 76th AVE W. MRI SUITE Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): X Reinforced Concrete X High Strength Bolting X Welding _Shotcrete Structural Masonry High Strength Bolting Spray applied Fireproofing _Smoke Control Systems Lateral Wood _Structural Observation by design professional X Soils All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. \\edmsvr-userfs\userprof$\ecarter\Desktop\Special Inspections\2022-1221 Swedish MRI Suite (unsigned).doc11/2/2022