Building PermitType: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 00580700002500 Site Address: 21601 76TH AVE W E104 EDMONDS,WA 98026-
7507
Subdivision: 005012, 005013, 005807, BLA AFN 199909155005 Lot: 0
Fire Sprinklers: Lot Area: Zoning: MU
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MECHANICAL FOR TI
WA State Contractor L & I #: MACDOFS8080S
Applied: 10/18/2022
Issued:11/4/2022
Final:
Expiration Date: 5/3/2023
Issued by: JOK
CONTACTS
AN
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
SPENSER PETHERICK
920 FIFTH AVENUE 2300,
(206)267-6920
SPENSER.PETHERICK@P2SINC.COM
SEATTLE WA 98104
920 FIFTH AVENUE 2300,
CONTACT
P2S
(206)267-6920
spenser.petherick@p2sinc.com
SEATTLE WA 98104
CONTRACTOR
MACDONALD MILLER FAC
PO BOX 47983, SEATTLE WA
(206)768-4062
Jake.Burstein@macmiller.com
SOLNSLLC
98146
PUBLIC HOSPITAL DISTRICT 2
4710 196TH ST SW, LYNNWOOD
OWNER
SNOHOMISH CO
WA 98036-5517
FEE •' •
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
11/4/22
R24197
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/4/22
R24197
PER PERMIT
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
11/4/22
R24197
MECHANICAL PLAN REVIEW FEE
001.000.345.83.000.00
$110.00
$110.00
11/4/22
R24197
MISC MECHANICAL EQUIPMENT
001.000.322.10.000.00
$30.00
$30.00
11/4/22
R24197
FOR WHICH NO FEE IS INDICATED
TOTALS: $245.00
$245.00
CONDITION TYPE
STATUS
NOTES
Printed: Friday, November 04, 2022 10:57:58 AM 1 of 2
PermitMECHANICAL
City of • • • PERMIT NUM
Edmonds 1 1 I
• • • • 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONS - Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED
RESULT
NOTES
B-3 MECH ROUGH IN
X-0 MECH FINAL"
B-7 BUILDING OTHER INSP
Printed: Friday, November 04, 2022 10:57:58 AM 2 of 2