SI Final LetterFINAL LETTER REPORT
Report Number: M7221745.0008
Service Date: 05/09/23
Report Date: 05/09/23
Client
Swedish Health Services
Attn: Accounts Payable
500 17th Ave
Seattle, WA 98122-5711
City of Edmonds
Attention: Building Division
121 5th Ave. N.
Edmonds, WA 98020
MAYES I lrerracon
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Swedish Edmonds Rad Onc Building Repairs
21605 76th Ave W
Edmonds, WA
Project No.: M7221745
Final Letter
Permit No: BLD2022-1201
This is to advise you that registered special inspections have been completed for the project referenced above per
our reports, copies of which have been sent to you.
Special inspection was provided for:
Structural Wood Observations
To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform
to, the city -approved drawings or engineer -approved changes.
We trust this provides you with the information you require. Should you have any questions, please contact us at
(425) 742-9360.
V-.v aa'*
Todd Wirtz
Senior Project Manager
Services: Project Management
Mayes/Terracon Rep.: Todd Wirtz
Reported to: GLY Construction
Contractor: GLY Construction
Report Distribution:
lvev�01v�
Kevin Graham
(1) City of Edmonds WA, Eric Carter
(1) GLY Construction Co. Inc., Arlond
Diteman
(1) GLY Construction Co. Inc., Brent
(1) Mayes Testing Engineers, Inc,
Sieqfried
Donna Pollard
(1) Mayes Testing Engineers, Inc,
(1) Providence Health and Services,
Todd Wirtz
Micah Dolen
Department Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001, 10-16-13, Rev.10 Page 1 of 1