Loading...
SI Testing Report 12.1.22WOOD FRAME OBSERVATIONS REPORT MAYES I lferracan Report Number: M7221745.0002 Service Date: 11/07/22 Report Date: 11/08/22 Client Providence Health and Services Attn: Micah Dolen 600 Broadway Ste 304 Seattle, WA 98122 Permit No.: BLD2022-1201 GENERAL INFORMATION On site for observation of lateral wood frame inspection. 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project Swedish Edmonds Rad Onc Building Repairs 21605 76th Ave W Edmonds, WA Project Number: M7221745 The construction documents referenced for this inspection include detail 1/SK-1. SUMMARY OF SERVICES Inspected splice plates added to Level 2 framing at grid lines 5.2 and 4.9. Splice plates and SD#10 screws are added per plans at both locations; also sill replacement was performed, per SK-5. A-35 clips added top and bottom of connection, per plans. The results of observation(s) for today were reported to GLY Construction. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Mark Vassallo Reported To: GLY Construction Contractor: GLY Construction Report Distribution: (1) Providence Health and Services, (1) City of Edmonds WA, Pat Lawler Micah Dolen (1) GLY Construction Co. Inc., Brent (1) Mayes Testing Engineers, Inc, Sieqfried Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz Reviewed By: 4� Barry Tuttle Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1