REVIEWED BLD2022-0939+Structural_Analysis_or_Calculations+7.14.2022_3.45.03_PM+29907231 of 25
BLD2022-0939
REVIEWED
BY
CITY OF EDMONDS
LONGITUDE
ONE TWENTYO
ENGINEERING & DESIGN
Calculation Package for
Foundation Stabilization/Lift
STRUCTURAL ENGINEER
L120 ENGINEERING & DESIGN
13150915fPLNE
KIRKLAND, WA 98034-5901
22507 93RD K W,
EDMONDS, WA 98020
Project no: 5220513-1XR
July I2t , 2022
Prepared for:
R&R Foundation Specialist
3409 McDougall Ave, suite 204
Everett, WA 98201
P: 425.760.5077
CONTACT: MANS THURFJELL, PE
EMAIL: MTHURFJELL@L120ENGINEERING.COM
PHONE: (425) 636-3313
RECEIVED
Jul 15 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
(425) 636-3313
L120Engineering.com
L740 ENGINEERING& DESIGN. LLO
NOTES:
a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE
MANUFACTURER. THE MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TD ACHIEVE THE REQUIRED BEARING
CAPACITY LOADING, INCLUDING SAFETY FACTOR NO LESS THAN 2. THE MM MUM INSTALLATION TORQUE SHALL NOT
EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PABTOF THE PILE ASSEMBLY. MAXIMUM
INSTALLATION TORQUE RATING OF 0,300MLBS FORA 2-7IO INCH DIAMETER HELICAL PILE WITH 0.203INCH SHAFT WALL
THICKNESS PER ESRa75L
b. HELICAL ASSEMBLIES AS MANUFACTURED BY IDEAL MANUFACTURING, INC.. IN ACCORDANCE WITH ESR-3750.
c. PILE OR ANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITY AS DETERMINED BY THE MANUFACTURER FOR MY PART
OF THE ASSEMBLY.
E. MAXIMUM ONDENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PLAN.
00544300004400
LEGAL DESCRIPTION
Section 25 Township 27 Range 3
'
Quarter SE PINECREST BLK 000
D-00-ALL TRACT 44
OWNER NAME & ADDRESS
MORRISON DAVID 8 AMY M
22507 93RD PL W,
EDMONDS, WA 98020
NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS.
NOTE: L120'S SCOPE IS LIMITED TO THE PERIMETER SUPPORT SYSTEMICONTINUOUS FOOTINGS. THE INTERIOR CRAWL SPACE SUPPORTED SYSTEM FOR THE FIRST FLOOR SHALL BE INSTALLED PER R&R.
IL
72
OMi
FOUNDATION NOTES
1, VERIFY ALL DIMENSIONS ON SITE.
2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER PAR
3. REFER TO THE FOLLOWING DETAILS FOR ADDITIONAL INFONMNTION:
HELICAL PILES SSK-01
HELICAL PILES SSK4o
ANGLE IRON _................... SSK-03
4. REFER TO STRUCTURAL CALCULATIONS PACKAGE DATED JULY 12,2022, FOR ADDITIONAL
INFORMATION, SPECIFICATIONS, ANGREQUIREMENTS.
5. LEVEL SURVEY PER RBR REPAIR PLAN DATED APRIL 19, M. REFER TO STRUCTURAL.
CALCULATIONS PACKAGE FOR MODIFICATIONS AND ADDITIONAL REQUIREMENTS FOR REPAIR PLAN
8, MINIMUM PILE DIAMETER SHALL BE 2-7)8°.
7, IT IS ACCEPTABLE TO INSTALL PILES AT THE SPACING SHOWN WITH a 9-8" TOLERANCE TO ALLOW
FOR UNEXPECTED OBSTRUCTIONS ENCOUNTERED DURING PILE INSTALLATION PROVIDED THAT NO
TWO ADJACENT SPANS EXCEED THE SPACING LIMITATION AS INDICATED ON LEVEL SURVEY.
0. IF REQUIRED, ALL SUPPLEMENTAL CHANNELS TO SPAN FROM PILE TO PILE AND —No IN A' PAE
SUPPORTING PILE EA END.
9, FIR QUIRED, A1I SUPPLEMENTAL CHANNELS TO BE ANCHORED TO THE FOUNDATION WITH
SIT DIAM. X F SIMPSON TITEN HD SCREW ANCHORS (OR APPROVED EQUIVALENT) AT A MAXIMUM
SPACING IMC. ANCHORS TO BE CENTERED ON OR INSTALLED ABOVE THE CENTER LINE OF THE
CHANNEL,
10. FIELD VERIFY ALL EXISTING STEM WALLS AT AND BETWEEN PILE AT TACHMENT LOCATIONS ARE 0°
THICK MINIMUM WITH T-2' HEIGHT (MEASURED FROM SIFTS TO TICONC) MINIMUM.
11. PARCEL DIMENSIONS PROVIDED BY SNOHOMISH COUNTY. NOT TO SCALE. PROPERTY LINE AND
RESIDENCE LOCATING DIMENSIONS (WITH ASTERISK,') APPROXIMATED PER GIS MAPPING TOOLS.
NOT TO BE USED FOR LEGAL PURPOSES.
12. SITE FEATURES AND EXISTING STRUCTURES ON ADJACENT PARCRLS NOT SHOWN FOR CLARITY
13. PILES SHALL BE INSTALLED TO MINIMUM EMBEDMENT OF —OR UNTIL REFUSAL, WHICHEVER IS
SHALLOWER.
HELICAL PILE REFUSAL CRITERM:
TORQUING OF THE PILE SHALL CONTINUE UNTIL A HYDRAULIC PRESSURE IS ACHIEVED TO PROVIDE
THE SPECIFIED MINIMUM VERTICAL CAPACITY WITH ASAFETY FACTOR OF NO LESS THAN TWO.
ADVANCEMENT SHALL BE HALTED IMMEDIATELY IF THE STRUCTURE BEGINS TO EXPERIENCE UPLIFT
FLEXURE.
EXISTING RESIDENCE STRUCTURE
j
EXISTING ADJACENT STRUCTURE
AREA OF PROPOSED WORK
---
PROPERTY LINE
APPROXIMATE DIMENSION
1
HELICAL PILE
®
4' SEGEMENT L6x6x3/8 ANGLE IRON
s
3$i
wo
A,m
g
BLTL -
I4
9l
R&R LEVEL SURVEY
SEE STRUCTURAL CALCULATION PACKAGE FOR ADDITIONAL
REQUIREMENTS
SITE PLAN
3of25
LONGITUDE
ONE TWENTY
ENGINEERING & DESIGN
Scone/Obiective
PROJECT NO. NO.
CITY OF EDMONDS
DEVELOPMENT NO
S220513-1 XR DEPARTMENT
PROJECT 22507 93rd PI W, Edmonds, WA
SUBJECT Foundation Stabilization/Jackin
BY PAM DATE 07/12/22
To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These
findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the
existing structure above (based on as -built assessments).
The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations
based upon the findings of L120 Engineering & Design.
Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic
damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in
the structural scope presented here.
It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space
support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support
posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas
shall be monitored and further adjustments shall be made if necessary.
Structural Summary:
- The foundation of the residence consists of continuous CMU stem wall and concrete strip footings. Below the footings, piles are to be
spaced at a distance no larger than 5'-0" on -center at the locations indicated on the attached Level Survey. Piles and supplemental
L6x6x3/8 angle iron to be installed in accordance with SSK-01, SSK-02, & SSK-03.
- End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of 1'-0".
- A maximum allowable loading of 1,500 plf was utilized in this analysis. This was determined through inspection of building geometry
and conservative span/tributary loading assumptions based on standard construction practices
- The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment
assemblies with capacities equal to or greater than the indicated load values.
Allowable Load Capacity Requirement:
Piles 1-4 ..................... 5 kip minimum vertical capacity (allowable load)
Piles 5-7, 10-11 ............ 7 kip minimum vertical capacity (allowable load)
Piles 8-9 ..................... 3 kip minimum vertical capacity (allowable load)
Note: Refer to the attached General Notes for additional requirements.
- As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and
recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or
expected additional structural analysis will be required.
- Structural recommendations contained in this package are based on site photographs dated April 19, 2022, provided by R&R. To the
knowledge of L120, a geotechnical investigation was not performed on this site. Consequently, all structural recommendations assume
adequate soil conditions to obtain the required pile capacities.
Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the
recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage,
or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need
to be revisited to consider and address the new findings
Refer to the following pages for pile and connection specifications.
L120 ENGINEERING & DESIGN
4 of 25
RECEIVED
GENERAL NOTES Jul 2022
CITY E
DEVELOPMENT
EERV
HELICAL PILES E
DEPARTMENT
MENTIDES
MENT
1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018
INTERNATIONAL BUILDING CODE (IBC).
2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND
SHALL BE IN ACCORDANCE WITH ESR-3750.
3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH
ESR-3750.
4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES
ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING
POLYMER (EAA) COATINGS (AC228).
5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE
REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING
COMPONENTS PER AC358 SECTION 3.9.
6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS.
7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED.
8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE
OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750.
9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE
AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE
INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS.
10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE
THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF
SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE
ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY.
11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY
TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO
LESS THAN TWO (2).
12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE
FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION.
13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE
TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES.
14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED
WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION.
15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.9
MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION
BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST
INCLUDE THE FOLLOWING:
A. PRODUCT MANUFACTURER
B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS
C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,
EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS
SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS
D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT
USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS
E. ANTICIPATED AND ACTUAL PILING DEPTH
F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION
G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH
BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS
ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER.
16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO
MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON
REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED.
HELICAL PILE PROOF TESTING
THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE
(3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE
PROCEDURE OUTLINED IN ASTM D1143.
MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD.
5of25
RECEIVED
GENERAL NOTES Jul 2022
CITY E
DEVELOPMENT
EERV
STRUCTURAL STEEL E
DEPARTMENT
MENTIDES
MENT
1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE
WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS
AND BRIDGES".
2. MATERIALS:
BOLTS - ASTM A307, UNLESS OTHERWISE NOTED
ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI)
3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES
D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY
E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN
ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED.
CONCRETE
1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC.
2. MINIMUM CONCRETE STRENGTH (28 DAYS):
FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX
BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX
SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX
SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI
AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE
3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE
APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A
DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE
SURFACE WATER.
4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE
EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS.
5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP.
GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING
APPROVED ADMIXTURES.
6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM.
7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS
SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER.
8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR
COLD WEATHER.
9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL.
10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT.
SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH
MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER.
6 of 25
PROJECT NO.
NO.
CITY OF EDMONDS
DEVELOPMENT SERVICES
S220513-1 XR
DEPARTMENT
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT Foundation Stabilization/Jacki
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
DATE 07/12/22
ideal Foundation Systems2-718"O Helical Pile ]0.203-inch wall thickness) - Soil Capacity per ESR-3750
DIGGA6KDrive Head
Pressure
Torque CorrelQtionFactor, Kt
Ultimate Axial Compressive
Allowable Axial Compressive
L120 ENGINEERING &DESIGN
7 of 25
PROJECT NO.
NO.
CITY OF EDMONDS
DEVELOPMENT SERVICES
S220513-1XR
DEPARTMENT
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
Foundation Stabilization/Jacking
DATE 07/12/22
Ideal Foundation Systems 2-7/8"0
*
Helical Pile (0.203-inch wall thickness) -Soil Capacity
per ESR-3750
DIGGA lOK Drive
Head Pressure
(Psi)
Torque,
T
(ft*Ibs)
Torque Correlation Factor,
Kt [Compression]
(ft i)
Ultimate Axial Compressive Capacity,
PI, = K,*T
(kips)
Allowable Axial Compressive Capacity,
Pa = 0.5*P„
(kips)
500
1,740
9
15.7
7.8
600
2,088
9
18.8
9.4
700
2,436
9
21.9
11.0
800
2,784
9
25.1
12.5
900
3,132
9
28.2
14.1
1000
3,480
9
31.3
15.7
1100
3,828
9
34.5
17.2
1200
4,176
9
37.6
18.8
1300
4,524
9
40.7
20.4
1400
4,872
9
43.8
21.9
1500
5,220
9
47.0
23.5
1600
5,568
9
50.1
25.1
1700
5,916
9
53.2
26.6
1800
6,264
9
56.4
28.2
1900
6,612
9
59.5
29.8
L120 ENGINEERING &DESIGN
9of25
Tuesday, April 19, 2022
jvLi PHOTOS
- -u-1- . � V. I - - -I —Y. - III
remove and replace concrete in this area. Customer
will remove stair stringer prior to install.
RECEIVED
Jul 15 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PaUN1 T10N SPEC=UUJ T
will remove 3 ft of deck boards prior to install in this
area.
remove deck boards at location 10 prior to install.
Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as
building geometry, tributary areas, and loading were determined through examination of these
photographs and industry knowledge of standard construction practices. - L120
10 of 25
mc• \• \•
ClT OF EDMONDS
DEVELOPMENT SERVICES
7 S220513-1 XR DEPISISI<-01
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT Foundation Stabilization/Jacki
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
(E) WOOD FRAMED
FLOOR SYSTEM,
FIELD VERIFY
DATE 07/12/22
(E) CONIC STEM WALL
T/STEM WALL =
FIELD VERIFY
8" MIN THICKNESS, T/FIN GRADE _
CONTRACTOR TO VERIFY = VARIES
' " •-IIII_IIII-1li
I—i�i�=IIII—il (E) FTG TO BE CUT FLUSH
� � •- IIII=IIII-IIII=
LU'
1=IIII =IIII =III WITH FACE OF STEM WALL
z < w a ,IIII _IIII _III WITH A 12" MAX WIDTH FOR
-IIII - IIII IIII INSTALLATION POCKET
N o o YIE�=IIIIIIII
II = T/GONG FTG =
—"'�=IIII=IIII=IIII=IIII �- � � -IIII=IIII
FIELD VERIFY
-IIII=IIII-1 d IIII=IIII=
IIII-IIII a � IIII-III'
(E) CONTINUOUS
CONIC FOOTING
NOTES:
1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION
DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE
NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET.
2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A
CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT
ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING
SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION
PER ASTM 153/A123.
3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL
REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT
CORROSION.
IDEAL HELICAL PILE & REPAIR
BRACKET ASSEMBLY PER
R&R FOUNDATION SPECIALIST
TO CONFORM TO ESR-3750
2-718" SHAFT W/ 10" DIAM
DOUBLE HELIX W/ 3" PITCH
L120 ENGINEERING & DESIGN
11 of 25
PROJECT NO. NO.
CITY E
DEVELOPMENT
SERVICES
S220513-1 XR DEPISISI<-02
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT Foundation Stabilization/Jacki
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
(E) WOOD FRAMED
FLOOR SYSTEM,
FIELD VERIFY
DATE 07/12/22
(E) CMU STEM WALL
8" (NOMINAL) MIN THICKNESS,
CONTRACTOR TO VERIFY
III=IIII=IIII=,
-,III—IIII—IIII-
Ill�llli—lill—
_ � =IIII-IIII=III,
o III=IIII=IIII=�
Q w E IIII=1111EE =
z > III=IIII-IIII II
z o IIII-IIII IIII=
�' S ~ III=IIII= II-11
NI IIII-11 .=IIII=
"�=IIII=IIII=IIII-IIII=III � - °
=IIII=IIII= � ' d
III=IIII ,4"'MIN d
=1 �-IIII-II�
-11 =IIII=IIII-11
(E) CONTINUOUS
CONC FOOTING
NOTES:
1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION
DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE
NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET.
2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A
CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT
ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING
SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION
PER ASTM 153/A123.
3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL
REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT
CORROSION.
T/STEM WALL =
FIELD VERIFY
T/FIN GRADE _
VARIES
(E) FTG TO BE CUT FLUSH
WITH FACE OF STEM WALL
WITH A 12" MAX WIDTH FOR
INSTALLATION POCKET
T/CONC FTG =
III=IIII=: FIELD VERIFY
IIII=IIII:
III=IIII=IANGLE IRON AND
ANCHORAGE WHERE
:IIII IIIIlillll- REQUIRED PER PLAN
IDEAL HELICAL PILE & REPAIR
BRACKET ASSEMBLY PER
R&R FOUNDATION SPECIALIST
TO CONFORM TO ESR-3750
2-718" SHAFT W/ 10" DIAM
DOUBLE HELIX W/ 3" PITCH
L120 ENGINEERING & DESIGN
12 of 25
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
7 S220513-1XR SSK-03
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
Foundation Stabilization/Jacking
STEEL ANGLE INSTALLATION AT (E) CMU STEM WALL:
DATE 07/12/22
Jul ANf HOR PETOTE 2, TIP LE Ll I <
CONC FTG . . 0 ,__—__: a v
a
:IIII-IIII I; II=� III= 111�111=1�1�1111=IIII=IIII-IIII=IIII IIII 11;�1=�1 11-IIII=IIII=
1=IIII=III,yl�ll IIII Ilif=1111��1=IIII=IIII=IIII-11 � II ,�1-,lll IIII=IIII=III
L -
:IIII_IIII��-:Iln :IIII-11 =IIII=I-I�1111=IIII=IIII=IIII -- II I -IIII=IIII=IIII=
1-IIII-IIII= III.-IIII- II-1111�81-IIII-IIII-IIII- 1 —II�_ I hII-_IIII_1111=III
:IIII=IIII=IIII IIII=IIII IIII=IIII-IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII IIII=IIII=IIII=
1=IIII=IIII= IIII=1111_III —1�414 ME�TI�1�1111_IIII-IIII=1111_IIII= I II_IIII_IIII=III
=IIII=IIII=_IIII IIII=IIII=1PI 14�''II=IIII=IIII=IIII=IIII=IIII=IIII IIII=IIII=IIII=_
IDIII-IIII= 11=IIII-IIII=1 f = 1'1=IIII=IIII=IIII=IIII=IIII=IIII= 111=IIII=IIII=III
:IIII=R 1=IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII=11 =_„' =IIII=IIII=IIII=
1=IIII-IIII= IqIIII-�� -II I��IIdN�������w��l�ll IIII=IIII=IIII_IIII— li_iill=IIII=III
:IIII—IIII-1111T1�11—-A—fdUKAIIIFN§P Cl/1EIST1 ; 1111—IIII—IIII-1� I IIII—IIII—IIII-
NOTES:
ABBREWA770W
CMU = CONCRETE MASONRY UNIT
1) ALL STEEL MEMBERS AND COMPONENTS SHALL BE GALVANIZED FOR EXTERIOR USE.
CONC = CONCRETE
2) ALL ANCHORS SHALL BE 5/8"0 SIMPSON TITEN HD SCREW ANCHORS W/ 4" MINIMUM EMBEDMENT INTO
EAR EACHNTERED
CONCRETE. ANY SUBSTITUTION SHALL BE SUBMITTED TO L120 FOR APPROVAL PRIOR TO INSTALLATION.
FT MAX=MNc
FOOT
MINIMAX MINIMUM/MAXIMUM
3) ANCHORS SHALL BE INSTALLED WITHIN 6" OR LESS FROM EACH END OF STEEL MEMBER.
OC=ON-CENTER
4) ADDITIONAL REQUIREMENTS PER ANCHOR MANUFACTURER.
No= UNLESS NOTED OTHERWISE
L120 ENGINEERING & DESIGN
1 1/2 X 1
SLOT(TYP)
3 X 3/4
SLOT(TYP)
2 7/8" TRUFORCE BRKT BRACED BASE GALV.
TOP
2 7/8" TRUFORCE BRKT BRACED BASE GALV.
FRONT
TRUFORCE UNDERPINNING BRACKET FOR 2 7/8'' PILE SHAFT
�7%2�
+ +
1 1/2 X ]
2 7/8" TRUFORCE BRKT T-BRKT GALV. SLOT (TYI
TOP
2 7/8" TRUFORCE BRKT T-BRKT GALV.
FRONT
NOTES:
1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI.
2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.1 STRUCTURAL
WELDING CODE - STEEL.
3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE.
4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS.
5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7).
6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194.
7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF
EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY.
8. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE
CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES.
�K
4 22 2020SmIDEAL
�ED
4 23 2020
kL MANUFACTURING,
INC.
PICTURE PARKWAY
STER, NY 14580
Group
789-4810 1 WWW.IDL-GRP.COM
NOT TO SCALE
SIZE
DWG NO R
ALL UNITS IN INCHES U.N.O.
B
I 278TFBPG
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
IDEAL MANUFACTURING, INC. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT WRITTEf,6
PERMISSION OF IDEAL c—
MANUFACTURING, INC.I§HIETE .
SHEET I cf N ~Ng
N m
v
cri
0
N
MAXIMUM TORQUE NOT TO EXCEED 8,300 FT-LBS.
ULTIMATE CAPACITY IS 74.7 KIPS BASED ON A CAPACITY TO
TORQUE RATIO OF kc = 9 FT-1
[L]
EXTENSION
(EX: 278203EXT[L]G)
ILI
Dv
I
I
`
L COUPLING
_
BOLTS & NUTS
FLIGHTED EXTENSION
FLIGHTED EXTENSION
SINGLE HELIX (SH)
DOUBLE HELIX (DH)
(EX: 278203FESH[L][D']X[T]G)
(EX: 278203FEDH[Q[DaD�]X[T]G)
NOTES:
1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI.
2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50.
3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE
TAPERED TO IMPROVE INSTALLATION CAPABILITIES.
4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX.
E SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES
THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT.
5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX
THICKNESS IS 3/8".
6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE
WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL.
7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO
AVAILABLE.
8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325
AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 211).
9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES
AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL
FOUNDATION SYSTEMS AND DEVICES.
2 7/8" O.D. X 0.203" W.T. HELICAL LEADS & EXTENSIONS
ICC-ES AC358 - REPORT #ESR-3750
1D4
D3
� W
57/8 (TYP)
SINGLE HELIX (SH) DOUBLE HELIX (DH) TRIPLE HELIX (TH) QUAD HELIX (QH)
LEAD LEAD LEAD LEAD
(EX: 278203SH[L][D3]X[T]G) (EX: 278203DH[L][D3D2]X[T]G) (EX: 278203TH[L][DaD2D3]X[T]G) (EX: 278203QH[L][WD2D3D4]X[T]G)
2%O.D. X� �2
0 203 1N T
:NSION
SINGLE
HELIX
(TENSION
IPLE
=LIX
-AD
CUT
45°
278 = HART # AbKtVIA " —"" --- -
278 =SHAFT DIAMETER �] 3 PITCH TYPICAL PILE
ASSEMBLY
203 = SHAFT WALL THICKNESS
EXT = EXTENSION (TYP)
FIE= FLIGHTED EXTENSION 015/16
SH, DH, TH, QH = SINGLE, DOUBLE,
B
TRIPLE, OR QUAD. HELIX
[L] = SHAFT LENGTH IN FEET BOLT HOLE HELIX FORMED BY
(EXAMPLE: 7' = 7) DETAIL PRESS DIE
[D] — HELIX DIAMETER(S) IN INCHES
DRAWN
AP
4 3 2020
110mDEAL
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
IDEAL MANUFACTURING, INC. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT WRITTEGroup PERMISSION OF IDEAL c
(EXAMPLE:10" = 10)
X — X (SEPARATES HELIX DIAMETER(S)
AND HELIX THICKNESS
[T] — HELIX THICKNESS
(EXAMPLE: 3/8" = 38)
G = GALVANIZED
CHECKED
LRS
4 7 2020
IDEAL MANUFACTURING, INC.
999 PICTURE PARKWAY
W NY 1WW
0-789-,
800-789-0810 WWW.IDL-GRP.COM
MANUFACTURING, INC.I �HSTE
'06
NOT TO SCALE
ALL UNITS IN INCHES U.N.O.
SIZE
B
I DWG NO
278203
REV
0
SHEET 1 Ol U'
n�� N
y N m
v
15 of 25
PROJECT NO.
NO.
CITY OF EDMONDS
DEVELOPMENT SERVICES
S220513-1 XR
DEPARTMENT
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT Foundation Stabilization/Jacki
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
LOAD ANALYSIS: IBC 2018 - 1-Story Building
Piles 1-4:
Roof LL(snow ground): 25psf
Floor LL: 40psf
Deck LL: 60psf
Roof/Floor DL: 15psf
Wall DL: 12psf
Roof Trib = 0.5*(20'*6') = 30ft2
Floor Trib = 0.5*(20'*6') = 30ft2
Deck Trib = 0.5*00'*6') = 15ft2
15' Wall Trib = 15'*(0.5*10') = 75ft2
PDT = 15psf*(30ft2+30ft2+15ft2) + 12psf*75ft2 = 2.1 k
PILL = 25psf*30ft2 + 40psf*30ft2 + 60psf*15ft2 = 2.9 k
PTL.AIlm = D+L = 2.1 k + 2.9k = 5.0 kips
Piles 1-4: Point Load
Pt Load = 5 kips
Refer to attached helical pile soil
capacity charts.
LOAD ANALYSIS: IBC 2018 - 1-Story Building
Piles 8-9:
Roof LL(snow ground): 25psf
Floor LL: 40psf
Roof/Floor DL: 15psf
Wall DL: 12psf
Roof Trib = 0.5*(10'*8') = 20ft2
Floor Trib = 0.5*(9'*7') = 16ft2
10' Wall Trib = 10'*(0.5*16') = 80ft2
PDL = 15psf*(20ft2+16ft2) + 12psf*80ft2 = 1.5 k
P,, = 25psf*20ft2 + 40psf*16ft2 = 1.2 k
PTLIII.. = D+L = 1.5k + 1.2k = 2.7 kips
Piles 8-9: Point Load
Pt Load = 3 kips
Refer to attached helical pile soil
capacity charts.
■
DATE 07/12/22
(E) WALL
(E) FOOTING
T/SOIL =
FIELD VERIFY
NOTES:
1. Both uniform and point loads analyzed in the following calculations. Uniform loads are
assumed to be standard due to load distribution from bearing walls, however, the additional
point load is conservatively considered here for any major beam supports from above.
2. Maximum loading on the grade beam was determined by inspection of the building
geometry and through conservative assumptions regarding span lengths and support
wall/foundation. All concrete walls assumed full tributary span of floor and roof members.
Conclusion:
Based on the loading and geometry of the structure we conclude that the foundation
may be stabilized through the use of piles and connections per R&R. These are to be
attached to the existing concrete footings (connections per R&R).
L120 ENGINEERING & DESIGN
16 of 25
PROJECT NO.
NO.
CITY OF EDMO NDS
DEVELOPMENT SERVICES
S220513-1 XR
DEPARTMENT
PROJECT 22507 93rd PI W, Edmonds, WA
LONGITUDE SUBJECT Foundation Stabilization/Jacki
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
LOAD ANALYSIS: IBC 2018 - 1-Story Buildin
5' SPAN Piles 5-7, 10-11
Roof LL (snow ground): 25 psf
Floor LL: 40psf
Floor/Roof DL: 15psf
Wall DL: 12psf
Roof Trib = 0.5'20' max span = 10'
Floor Trib = 0.5'20' max span = 10'
Typical Fir Ht = 10' x 1 stories = 10'
wDL = 15psf'(10'+10')+12psf"10' = 0.42 klf
wLL= 25psf'10'+40psf'10' = 0.65 klf
wSTEM = 0.25klf
wTL.A„- = D+L+Stem = 0.42kif + 0.65kif + 0.25kif = 1.32k1f
5' Span PDL = 0.42kif • 5' = 2.1 k
5' Span PLL = 0.65klf * 5' = 3.25k
5' Span PSTEM = 0.25klf " 5' = 1.25 k
5' Span PTL.AI„„.. = 2.1 k + 3.25k + 1.25k = 6.6 k
ICase 1: Point Load
5'-0" Span: (Conc Only)
Pt Load = 7k
Refer to attached calculations for
analysis.
Case 2: Uniform Load
6'-0" Span: (Conc Only)
Uniform Load
DL = 670 plf
LL = 400 plf
LL, (snow) = 250 plf
Refer to attached calculations for
analysis.
DATE 07/12/22
---------------------- I -----------------------
L/2 L L/2 - /L
NOTES:
1. Both uniform and point loads analyzed in the following calculations. Uniform loads are
assumed to be standard due to load distribution from bearing walls, however, the additional
point load is conservatively considered here for any major beam supports from above.
2. Maximum loading on the grade beam was determined by inspection of the building
geometry and through conservative assumptions regarding span lengths and support
wall/foundation. All concrete walls assumed full tributary span of floor and roof members.
Conclusion:
Based on the loading and geometry of the structure we conclude that the foundation
may be stabilized through the use of piles and connections per R&R. These are to be
attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than
6'-0".
L120 ENGINEERING & DESIGN
17of25
Project Title:
Engineer:
Project ID:
Project Descr:
RECEIVED
Jul 15 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Steel Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
Lic. #: KW-06011993 L120 Engineering and Design
DESCRIPTIO L6x6x3/8 - 4ft Segment (Max Load)
CODE REFERENCES
Calculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10
Load Combination Set: IBC 2018
Material Properties
Analysis MethorAllowable Strength Design Fy : Steel Yield 36.0 ksi
Beam Bracing Completely Unbraced E: Modulus: 29,000.0 ksi
Bending Axis : Major Axis Bending
Vertical Leg Up D(1) L(1
I Span = 1.60 ft I Span = 0.8330 ft I Span = 1.60 ft I
S(0.4)
)plied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 1.30, L = 0.850, S = 0.50 k/ft, Tributary Width = 1.0 ft, (Typical Uniform)
Point Load : D = 1.0, L = 1.30, S = 0.40 k @ 0.0 ft, (Point Load)
NOTE: Loading
Load for Span Number 2 shown here is
Uniform Load : D = 1.30, L = 0.850, S = 0.50 k/ft, Tributary Width = 1.0 ft, (Typical Uniform) conservative
Load for Span Number 3
Uniform Load : D = 1.30, L = 0.850, S = 0.50 k/ft, Tributary Width = 1.0 ft, (Typical Uniform)
Point Load : D = 1.0, L = 1.30, S = 0.40 k @ 1.60 ft, (Point Load)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
0.993: 1 Maximum Shear Stress Ratio =
0.206 : 1
Section used for this span
L6x6x3/8
Section used for this span
L6x6x3/8
Ma: Applied
6.619 k-ft
Va : Applied
5.999 k
Mn / Omega: Allowable
6.668 k-ft
Vn/Omega : Allowable
29.102 k
Load Combination
+D+0.750L+0.750S
Load Combination
+D+0.750L+0.750S
Location of maximum on span
0.000ft
Location of maximum on span
1.600 ft
Span # where maximum occurs
Span # 3
Span # where maximum occurs
Span # 1
Maximum Deflection
Max Downward Transient Deflection
0.018 in Ratio =
2,175>=360
Max Upward Transient Deflection
-0.001 in Ratio =
9,461 >=360
Max Downward Total Deflection
0.036 in Ratio =
1061 >=180
Max Upward Total Deflection
-0.002 in Ratio =
4556 >=180
Maximum Forces & Stresses for Load Combinations
Load Combination
Max Stress Ratios
Summary of Moment Values
Summary of Shear Values
Segment
Length
Span #
M
V Mmax +
Mmax -
Ma Max
Mnx Mnx/Omega
Cb Rm
Va Max
VnxVnx/Omega
D Only
Dsgn. L =
1.60 ft
1
0.492
0.107
-3.28
3.28
11.14
6.67 1.00 1.00
3.10
48.60
29.10
Dsgn. L =
0.83 ft
2
0.489
0.107 -0.00
-3.28
3.28
11.21
6.71 1.02 1.00
3.10
48.60
29.10
Dsgn. L =
1.60 ft
3
0.492
0.107
-3.28
3.28
11.14
6.67 1.00 1.00
3.10
48.60
29.10
+D+L
Dsgn. L =
1.60 ft
1
0.967
0.198
-6.45
6.45
11.14
6.67 1.00 1.00
5.76
48.60
29.10
Dsgn. L =
0.83 ft
2
0.962
0.198 -0.00
-6.45
6.45
11.20
6.71 1.02 1.00
5.76
48.60
29.10
Dsgn. L =
1.60 ft
3
0.967
0.198
-6.45
6.45
11.14
6.67 1.00 1.00
5.76
48.60
29.10
+D+S
18of25
Project Title: RECEIVED
Engineer: Jul 15 2022
Project ID: CITY OF EDMONDS
DEVELOPMENT SERVICES
Project eScr. DEPARTMENT
Steel Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
DESCRIPTIO L6x6x3/8 - 4ft Segment (Max Load)
Load Combination
Max Stress Ratios
Summary of Moment Values
Summary of Shear Values
Segment Length
Span # M
V Mmax
+ Mmax - Ma Max
Mnx Mnx/Omega
Cb Rm
Va Max
VnxVnx/Omega
Dsgn. L = 1.60 ft
1 0.684
0.148
-4.56 4.56
11.14
6.67 1.00 1.00
4.30
48.60 29.10
Dsgn. L = 0.83 ft
2 0.680
0.148
-0.00 -4.56 4.56
11.21
6.71 1.02 1.00
4.30
48.60 29.10
Dsgn. L = 1.60 ft
3 0.684
0.148
-4.56 4.56
11.14
6.67 1.00 1.00
4.30
48.60 29.10
+D+0.750L
Dsgn. L = 1.60 ft
1 0.849
0.175
-5.66 5.66
11.14
6.67 1.00 1.00
5.10
48.60 29.10
Dsgn. L = 0.83 ft
2 0.844
0.175
-0.00 -5.66 5.66
11.20
6.71 1.02 1.00
5.10
48.60 29.10
Dsgn. L = 1.60 ft
3 0.849
0.175
-5.66 5.66
11.14
6.67 1.00 1.00
5.10
48.60 29.10
+D+0.750L+0.750S
Dsgn. L = 1.60 ft
1 0.993
0.206
-6.62 6.62
11.14
6.67 1.00 1.00
6.00
48.60 29.10
Dsgn. L = 0.83 ft
2 0.987
0.206
-0.00 -6.62 6.62
11.20
6.71 1.02 1.00
6.00
48.60 29.10
Dsgn. L = 1.60 ft
3 0.993
0.206
-6.62 6.62
11.14
6.67 1.00 1.00
6.00
48.60 29.10
+0.60D
Dsgn. L = 1.60 ft
1 0.295
0.064
-1.97 1.97
11.14
6.67 1.00 1.00
1.86
48.60 29.10
Dsgn. L = 0.83 ft
2 0.293
0.064
-0.00 -1.97 1.97
11.21
6.71 1.02 1.00
1.86
48.60 29.10
Dsgn. L = 1.60 ft
3 0.295
0.064
-1.97 1.97
11.14
6.67 1.00 1.00
1.86
48.60 29.10
Overall Maximum Deflections
Load Combination
Span Max. "-" Defl
Location in Span Load Combination
Max.
"+" Defl Location in Span
+D+0.750L+0.750S
1
0.0362
0.000
0.0000
0.000
2
0.0000
0.000 +D+0.750L+0.750S
-0.0022
0.416
+D+0.750L+0.750S
3
0.0360
1.600
0.0000
0.416
Maximum Deflections for Load Combinations
Load Combination
Span
Max. Downward Defl Location in Span
Span Max. Upward
Defl
Location in Span
D Only
1
0.0178
0.000
2
-0.0011
0.416
+D+L
1
0.0354
0.000
2
-0.0021
0.416
+D+S
1
0.0247
0.000
2
-0.0015
0.416
+D+0.750L
1
0.0310
0.000
2
-0.0019
0.416
+D+0.750L+0.750S
1
0.0362
0.000
2
-0.0022
0.416
+0.60D
1
0.0107
0.000
2
-0.0007
0.416
L Only
1
0.0176
0.000
2
-0.0011
0.416
S Only
1
0.0069
0.000
2
-0.0004
0.416
Vertical Reactions
Support notation :
Far left is #
Values in KIPS
Load Combination
Support 1
Support 2
Support 3 Support 4
Overall MAXimum
6.968
6.968
Overall MINimum
1.408
1.408
D Only
3.651
3.651
+D+L
6.666
6.666
+D+S
5.060
5.060
+D+0.750L
5.912
5.912
+D+0.750L+0.750S
6.968
6.968
+0.60D
2.191
2.191
L Only
3.014
3.014
S Only
1.408
1.408
Steel Section Properties L6x6x3/8
Depth
= 6.000 in
I xx
= 15.40 in^4
J =
0.218 in14
S xx
3.51 inA3
Cw =
0.58
inA6
Leg Width
= 6.000 in
R xx
= 1.870 in
Ro =
3.340 in
Thickness
= 0.375 in
Zx
= 6.270 inA3
Area
= 4.380 inA2
1 yy
= 15.400 inA4
Weight
= 14.900 plf
S yy
= 3.510 inA3
Kdesign
= 0.875 in
R yy
= 1.870 in
Ycg
= 1.620 in Qs =
0.912
Iz =
6.210 inA4
Sz =
2.690 inA3
Yp
= 0.365 in Rz =
1.190 in
Tar& =
1.00 deg
Eo
= 0.365 in
Project Title:
Engineer:
Project ID:
Project Descr:
19 of 25
RECEIVED
Jul 15 2022
CIN OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Steel Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
1
C
0
L
ESCRIPTIO L6x6x3/8 - 4ft Segment (Max Load)
038 0,19 1118 1159 1193 2,33 2189 3108 3,49 3,88
Distance (R)
1 DOrly 1 +d+l 1 +d+91 +6+67S611 +6+67S61+6.7i69 +DRD
fi
3
MEMBER
E-ZZ7 _7"
•3
038 0,19 118 1E9 193 233 289 308 349 3,88
Distance �fk)
1 D Only 1 +d+l 1 +d+91 +6+67S611 +6+67S61+6.7i691 +DRD
20 of 25
Project Title:
Engineer:
Project ID:
Project Descr:
RECEIVED
Jul 15 2022
CIN OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Steel Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
..-
DESCRIPTIO L6x6x3/8 - 4ft Segment (Max Load)
MM
7L
N
Distance (R)
1 DOrly 1 +d+l. 1 +d+91 +6+67S611 +6+67S61+6.7i691 +6,66a l4nly 1 gOnly
RECEIVED
Jul 15 2022
CIN OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
21 of 25
Appendix
Parcel Details
& Photographs
22 of 25
RECEIVED
CITY OF EDMONDS
DEVELOPMENT SERVICES
n o h o m i Onllna Government Information S Seruicea
T
DEPARTMENT
County
Property Account Summary
7/12/2022
Parcel Number 100544300004400 lProperty Address 122507 93RD PL W, EDMONDS, WA 98020-4515
General Information
Property Description Section 25 Township 27 Range 3 Quarter SE PINECREST BLK 000 D-00 - ALL
TRACT 44
Propertv Catel;ory Land and Improvements
Status jActive, Locally Assessed
Tax Code Area 100216
Property Characteristics
Use Code 111 Single Family Residence - Detached
Unit of Measure Acre(s)
Size (gross) 0.36
Related Properties
No Related Properties Found
Parties
Role
Percent
Name
Address
Taxpayer
100
MORRISON
22507 93RD PL W, EDMONDS, WA 98020
DAVID\AMY M
Owner
100
MORRISON DAVID &
22507 93RD PL W, EDMONDS, WA 98020-4515
AMY M
United States
Property Values
Value Type
Tax Year
2022
Tax Year
2021
Tax Year
2020
Tax Year
2019
Tax Year
2018
Taxable Value Regular
$708,000
$577,700
$553,500
$517,100
$447,600
Exemption Amount Regular
Market Total
$708,000
$577,700
$553,500
$517,100
$447,600
Assessed Value
$708,000
$577,700
$553,500
$517,100
$447,600
Market Land
$531,000
$438,000
$416,000
$382,000
$326,000
Market Improvement
$177,000
$139,700
$137,500
$135,100
$121,600
Personal Property
Active Exemptions
,No Exemptions Found
Events
Effective
Entry Date-
Type
Remarks
Date
Time
07/23/2021
07/23/2021
Excise Processed
Temporary Excise: T145487 Finalized to: E168087
08:38:16
07/13/2021
12/09/2021
Recording No.
Property Transfer Filing No.: E168087, Statutory Warranty Deed, new Recording No.:
14:35:00
Changed
202107237016 07/13/2021 by sasaml
07/13/2021
12/09/2021
Owner
Property Transfer Filing No.: E168087 07/13/2021 by sasaml
14:35:00
Terminated
23 of 25
RECEIVED
07/13/2021
12/09/2021
Owner Added
Property Transfer Filing No.: E168087 07/13/2021 by sasaml Jul 15 2022
14: 3 5 : 00
CITY OF EDMONDS
DEVELOPMENT SERVICES
07/13/2021
07/23/2021
Excise Processed
DEPARTMENT
Property Transfer Filing No.: T145487, submitted by eREET 07/13/2021 by ASCEREET
08:38:00
Tax Balance
Installments Payable
Tax Year
lInstallment
IDue Date
I Principail
Interest, Penalties and Costsl
Total Duel
Cumulative Due
2022
12
10/31/2022
1 $2,960.411
$0.001
$2,960.411
$2,960.41
Distribution of Current Taxes I
District
Rate
Amount
Voted Amount
Non -Voted Amount
CENTRAL PUGET SOUND REGIONAL TRANSIT AUT
0.18
$130.34
$0.00
$130.34
CITY OF EDMONDS
1.18
$836.11
$238.19
$597.92
EDMONDS SCHOOL DISTRICT NO 15
3.19
$2,259.90
$2,259.90
$0.00
PORT OF EDMONDS
0.08
$57.49
$0.00
$57.49
PUB HOSP #2
0.06
$40.73
$0.00
$40.73
SNO-ISLE INTERCOUNTY RURAL LIBRARY
0.39
$277.18
$0.00
$277.18
SNOHOMISH COUNTY-CNT
0.60
$423.65
$0.00
$423.65
STATE
2.67
$1,887.39
$0.00
$1,887.39
SNOHOMISH CONSERVATION DISTRICT
$8.03
$0.001
$8.03
TOTAL
8.35
$5,920.82
$2,498.091
$3,422.73
Pending Property Values
Pending Taxj Market Land
$63
Levy Rate History
Tax
I Real Property Structures
Market Market Total Current Use Lai
t Value Value Val
000.001 $836,500.001 $0.
2021
2020
2019
Current Use Current Use Total
Improvement Value
$0.001 $0.00
Total
9.33797
9.27096
Description
IType
Year Built
Imore Information
1 Story
IDwelling
11943
IView Detailed Structure Information
Receipts
Date
Receipt No.
Amount Tendered
Amount Due
04/21/2022 00:00:00
12186505
$2,960.41
$5,920.82
10/26/2021 00:00:00
11901382
$2,391.43
$2,391.43
05/05/2021 00:00:00
11707186
$2,391.42
$4,782.85
11/04/2020 00:00:00
11401489
$2,588.30
$2,588.30
04/30/2020 00:00:00
11087352
$2,588.29
$5,176.59
10/30/2019 00:00:00
10808727
$2,400.51
$2,400.51
04/30/2019 00:00:00
10545428
$2,400.51
$4,801.02
11/01/2018 00:00:00
10262991
$2,404.46
$2,404.46
04/26/2018 00:00:00
9969579
$2,404.46
$4,808.92
10/31/2017 00:00:00
9690890
$2,011.04
$2,011.04
04/26/2017 00:00:00
9401979
$2,011.04
$4,022.08
Sales History
Sale Date
Entry
Recording Recording Sale
Excise
Deed
Transfer Grantor(Seller) Grantee(Buyer) Other
Date
Date Number Amount
Number
Type
Type I I Parcels
DAWSON
MORRISON
07/13/2021
07/22/2021
07/13/2021
202107237016
$762,000.00
El68087
W
S
JAMES J &
DAVID & AMY
No
CHERYL J
M
24 of 25
RECEIVED
Jul 15 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Ci Car
9:4 :i.I.
2
Wd Gk
go-] S.A.
14
U 13
I
is 0
13Fi
103 Id.
17 I
i
IS
1]
ifl
iG
RFx
I" C*
3& s.f. E
Existing building plan provided by Snohomish County records for Parcel #:00544300004400 for
address: 22507 93RD PL W , EDMONDS, WA 98020
Note that analysis assumptions such as building geometry, tributary areas, and loading were
determined through examination of these photographs and industry knowledge of standard
construction practices.
-L120
25 of 25
RECEIVED
Jul 15 2022
F EDMONDS
ENT SERVICES
no.nn�ni.
r
i
a
i11
•
41 AA
Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading
were determined through examination of these photographs and industry knowledge of standard construction practices.
-1-120