Building PermitI Type: MISCELLANEOUS Subtype: NON STANDARD PERMIT I Status: FINAL I
Parcel No: 00434210000000
Subdivision: 004342
Fire Sprinklers:
Valuation: $1,458,320.00
Code Edition: 0
Site Address: 310 6TH AVE N EDMONDS,WA 98020-3089
Lot: 0
Lot Area: 7.92 acres
Occupancy Type:
No. Stories: 0
Scope of Work: CIVIC CENTER PLAYFIELDS
Zoning: P
Construction Type:
# of Dwelling Units: 0
Applied: 12/17/2019
Issued:5/31/2021
Final: 6/8/2023 CLM
Expiration Date: 6/15/2023
Issued by: JOK
I WA State Contractor L & I #: AlLANC1056DP I
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE EMAIL
APPLICANT
CITY OF EDMONDS
700 MAIN ST, EDMONDS WA
(425)771-0230
SHANNON.BURLEY@EDMONDSWA.G
98020
OV
CONTRACTOR
A-1 LANDSCAPING AND
20607 SR 9 SE, SNOHOMISH WA
(425)402-9900
NAEEM@AILAND.COM
CONSTRUCTION INC
98296
LAN DSC ARCH
WALKER MACY
1218 3RD AVE STE 1310,
(206)582-3874
AKUNS@WALKERMACY.COM
SEATTLE WA 98104
OWNER
CITY OF EDMONDS
700 MAIN ST, EDMONDS WA
(425)771-0230
SHANNON.BURLEY@EDMONDSWA.G
98020
OV
•' •
lip
DESCRIPTION
14/15712021:
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
Existing ESU Credit of422.000.379.00.000.00
($27,086.12.)
($27,086.12)
5/26/21
R12561
BUILDING - ADDITIONAL REVIEW
001.000.345.83.000.00
$4,400.00
$4,400.00
5/26/21
R12561
HOURS
BUILDING INSPECTION FEE - PER
001.000.322.10.000.00
$1,870.00
$1,870.00
5/26/21
R12561
INSPECTION
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$35.00
$35.00
5/26/21
R12561
PER PERMIT
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
5/26/21
R12561
ENGINEERING REVIEW FEE
001.000.341.82.000.00
$1,870.00
$1,870.00
5/26/21
R12561
ENGINEERING REVIEW FEE
001.000.341.82.000.00
$110.00
$110.00
5/26/21
R12561
FIRE - INSPECTION FEE
001.000.342.40.000.00
$110.00
$110.00
5/26/21
R12561
FIRE - PLAN REVIEW HOURS
001.000.345.83.100.00
$550.00
$550.00
5/26/21
R12561
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$2,813.25
$2,813.25
6/8/22
R20772
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$9,383.20
$9,383.20
5/26/21
R12561
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$7,975.72
$7,975.72
2/11/20
R3204
PLANNING FEE NOT CATEGORIZED
001.000.345.81.000.00
$110.00
$110.00
5/26/21
R12561
PLANNING FEE NOT CATEGORIZED
001.000.345.81.000.00
$770.00
$770.00
5/26/21
R12561
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$1,040.00
$1,040.00
5/26/21
R12561
FEE
Printed: Thursday, June 08, 2023 3:15:05 PM 1 of 4
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE
RECEIPT #
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$520.00
$520.00
5/26/21
R12561
FEE
STORMWATER GENERAL FACILITY
422 000.379.00.000.00
$37,501.62
$37,501.62
5/26/21
R12561
CHARGE MF COMM
TRANSPORTATION ENGINEER
001.000.341.82.000.00
$780.00
$780.00
5/26/21
R12561
REVIEW FEE
UTILITY ENGINEER REVIEW FEE
001.000.341.82.000.00
$3,900.00
$3,900.00
5/26/21
R12561
TOTALS: $46,872.67 $46,872.67
CONDITIONS
CONDITION TYPE
STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
The following item is required to be submitted as a Deferred Submittal prior to sidewalk
construction to this permit:
o Tree Grate Specs
FOR
OTHER CONDITION
INFORMATION
FOR
ECDC 17.60.030.E - Sports field lighting must be turned off by an automatically timed
PLANNING CONDITION
INFORMATION
mechanism no later than 10:15 p.m.
REQUIRED SPECIAL
FOR
SPECIAL INSPECTIONS ARE REQUIRED FOR: Soils and Grading; Concrete, Structural Steel,
INSPECTIONS
INFORMATION
Welding, High Strength Bolting. See Structural plans.
FOR
Separate Permit Required For:
INFORMATION
SEPARATE PERMIT REQUIRED
FOR
Restroom Building; Plumbing, Electrical (L&I); Signage
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
Printed: Thursday, June 08, 2023 3:15:05 PM 2 of 4
PermitMISCELLANEOUS
PERMIT NUM
City of Edmonds
Ave •:� i 1 ' 1
LM.
www.edmondswa.gov
A&
INSPECTIONS•
•.
INSPECTIONTYPE
INSPECTOR COMPLETED RESULT NOTES
X-3 BUILDING FINAL"
B-5 CROSS CONNECTION
X-2 ENGINEERING FINAL
A-1 TESC AND MOBILIZE
8/20/2021
APPROVED
Discussed TESC with Capital inspector. He is CESCL
12:00:00 AM
certified and will handle request scheduled under the
Engineering Pre -con for 8/20/2021.
A-1 ENGINEERING PRECON
8/20/2021
APPROVED
Note to Inspector: No ROW permit required.
12:00:00 AM
Handled through City Project Contract/Specs.
A-1 ENGINEERING PRECON
8/20/2021
APPROVED
PARTIAL TESC INSPECTION REQUESTED DUE TO
12:00:00 AM
BOYS&GIRLS CLUB USE OF PARTIAL FIELD THROUGH
LABORDAY
A-1 ENGINEERING PRECON
8/20/2021
APPROVED
Inspection not needed - Capital Project Manager will
12:00:00 AM
handle all inspections.
A-1 BUILDING PRECON
11/29/2021
APPROVED
PARTIAL TESC INSPECTION REQUESTED DUE TO
12:00:00 AM
BOYS&GIRLS CLUB USE OF PARTIAL FIELD THROUGH
LABORDAY
A-1 BUILDING PRECON
11/29/2021
APPROVED
AM inspection for PM pour. Contact Wayne or Casey
12:00:00 AM
A-1 BUILDING PRECON
11/29/2021
APPROVED
Met with Wayne and Casey. We discussed project
12:00:00 AM
scope and preliminary phasing of construction.
B-2 FOOTINGS
11/29/2021
PARTIAL
AM inspection for PM pour. Contact Wayne or Casey.
12:00:00 AM
APPROVAL
lb
B-2 FOOTINGS
11/29/2021
PARTIAL
Footings for new tennis court at NW corner of
12:00:00 AM
APPROVAL
property only.
B-2 FOUNDATION WALL
12/20/2021
PARTIAL
Foundation wall for new tennis courts
12:00:00 AM
APPROVAL
B-2 FOUNDATION WALL
12/20/2021
PARTIAL
Foundation wall for tennis courts ok pending si
12:00:00 AM
APPROVAL
reports
B-2 FOOTINGS
6/30/2022
PARTIAL
Approved pending removal of water and satisfactory
12:00:00 AM
APPROVAL
SI reports
B-2 RETAINING WALL
5/2/2023
APPROVED
12:00:00 AM
B-2 FOOTINGS
5/2/2023
APPROVED
12:00:00 AM
B-4 FRAMING
5/2/2023
APPROVED
12:00:00 AM
B-5 BLDG SPECIAL
5/2/2023
PARTIAL
Partial:
INSPECTION
12:00:00 AM
APPROVAL
Progress reports up to 5/2/23 have been received and
reviewed. Final letter outstanding
B-5 BLDG SPECIAL
INSPECTION
B-2 FOUNDATION WALL
5/2/2023
APPROVED
12:00:00 AM
Printed: Thursday, June 08, 2023 3:15:05 PM 3 of 4
PermitMISCELLANEOUS
City of
• • •
Edmonds WA
98020 1 ' 1
ww .
•.
B-7 BUILDING OTHER INSP
6/7/2023
NOT REQUIRED
12:00:00 AM
X-1 PLANNING FINAL"
6/8/2023
APPROVED
Landscaping, timer
12:00:00 AM
X-1 PLANNING FINAL"
6/8/2023
APPROVED
Installed landscaping matched approved plans. Timer
12:00:00 AM
installed.
Printed: Thursday, June 08, 2023 3:15:05 PM 4 of 4