Loading...
APPROVED ENG RESUB 1+ENG2023-0213+Site_Plan+5.3.2023_4.29.31_PM+3523495a S. L� Wff drw §3 M. l NO EQUIPMENT OR MATERIALS SHALL BE STORED IN THE RIGHT-OF-WAY Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or ' occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED h Jell tV4AtHjgt 05/08/2023 VV RESUB May 04 2023 CITY OF E DEVELOPMENTT SERVICES DEPARTMENT