APPROVED STM RESUB 1-Storm_Drainage_Report+4.23.2021_3.27.28_PM+2161959LITCHFIELD ENGINEERING Civil Engineering & Development Services STORMWATER DRAINAGE REPORT for DALEY EAST SFR Prepared for: Daley Street Builders, LLC 323 Daley Street Edmonds, WA 98020 COMPLIES WITH APPLICABLE CITY STORMWATER CODE Prepared By: Keith A. Litchfield, P.E. Date Issued: January 25, 2021 Date Revised: April 20, 2021 LIT WA l �� W "P 2947CD �GI STERN y� �gsI ONAL 12840 81ST AVENUE NE ♦ KIRKLAND, WA 98034 PH 425-821-5038 FAX 425-821-5739 RESUB 4/23/2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT TABLE OF CONTENTS A. Project Overview.................................................................................................1 B. Minimum Requirements....................................................................................4 FIGURES Figure 1: Vicinity Map Figure 2: Soils Map Figure 3: Flow Chart for Determining Requirements for New Development APPENDICES Appendix A: Geotechnical Investigation A. Project Overview Existing Conditions The site is located at 323 Daley Street (Lot 30, 31, & 32 of the plat of City of Edmonds Snohomish County, Washington Volume 2, page 39, block 119) and is 7,080 SF (0.16 AC). The existing development adjacent to the subject site includes the following: Public alley to the north; 4th Avenue North to the east; Daley Street to the south; and Single-family residences to the west. The site generally slopes down from the southeast to the northwest at an average grade of 3%. The site is currently undeveloped with lawn areas and shrubs. Historic access has been from the alley adjacent to the site. The site soils are mapped as Everett very gravelly sandy loam, 0 to 8 percent slopes. Runoff from the site sheet flows over land to the northwest across neighboring properties towards 3rd Ave North. The runoff is tributary to the existing public conveyance system within 3rd Ave North. Proposed Conditions The project incorporates the construction of on and off -site infrastructure to support the construction a new single-family residence. The new residence will be accessed from the 15' wide alley to the north. The alley will be paved to the extents of the project site. The alley is proposed to be permeable pavement per BMP T5.15 in order to mitigate the generated stormwater. The Riley Group, Inc. performed an infiltration test adjacent to the existing alley. The soils were classified as brown, silty sand with gravel, medium dense. The measured infiltration rate was 0.90 inches/hour and a hydraulic restrictive layer (lodgment till) was observed at a depth of 3.5 feet (no groundwater observed). Per City of Edmonds detail SD-622, a minimum of 1' separation between the seasonal high groundwater table or hydraulically restrictive layer is required. The permeable pavement is proposed to be 12" thick, therefore there is 2.5' separation from the observed hydraulic restrictive layer. Details for the proposed permeable pavement section are included in the site improvement plans. The site impervious area as a result of the new home construction is provided below. Summary of Proposed Site Improvements: Surface Type Area (SF) Onsite Roof 2,711 Onsite Driveway/Parking 230 Onsite Walkways 445 Offsite Alley Paving 1,003 Offsite Alley Approach/Sidewalk 385 Total Onsite Impervious: 3,386 Total Onsite Area: 7,080 Total Offsite Impervious: 1,388 Total Offsite Area: 1,388 Total Site Impervious: 4,774 Total Site Area: 8,468 1 Site Maps Figure 1: Vicinity Map rig' 5� Jr firi I r{f rr d t s Nk I I r. 2 i J4LQHA WAY GLEN ST Sl ' f r if 33i 230 . 31° �UWHPUE Figure 2: Soils Map *' x T-)14 do Snohomish County Area, Washington (WAb61) Map Acres percent Unit Map Unit Name in of AGI symbol AGI 17 Everett very 2.5 100.0% gravelly sandy loam, 0 to 8 percent slopes Totals for Area of 2.5 100.00/0 Interest 3 B. Minimum Requirements The existing impervious surface coverage is less than 35%, therefore the project is classified as new development. The Department of Ecology's Figure 1-2.4.1: Flow Chart for Determining Requirements for New Development (Figure 3, page 7) was utilized to determine the project requirements relative to stormwater management. The project adds less than 5,000 sq. ft. of new impervious surface but more than 2,000 sq. ft. of new plus replaced impervious surface, therefore minimum requirements 1 through 5 apply to the project. Implementing Minimum Requirements #1- #5 Minimum Requirement No. 1— Preparation of Stormwater Site Plan A stormwater site plan is included in the permit submittal. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention Plan All new development and redevelopment projects in which new, replaced, or new plus replaced impervious surfaces total 2,000 square feet or more, shall comply with Construction SWPP Elements #1 through #13. A CSWPPP has been incorporated into the Stormwater Site Plans. Element 1— Mark Clearing Limits — Clearing limits at the property lines will be delineated with silt fence and orange construction fencing (if necessary). Element 2 — Establish Construction Access - A quarry spall construction entrance shall be provided, if necessary. Element 3 — Control Flow Rates — Given the existing topography and small scope of work, a silt fence shall be adequate to control the minimal flows generated during construction. Element 4— Install Sediment Controls —Silt fencing will be constructed and is expected to provide construction stormwater sediment control during construction. Element 5 — Stabilize Soils — Stockpiled or unworked soils will be protected during construction by covering with plastic or temporary or permanent seeding. All exposed soils will be landscaped or seeded at the conclusion of the project. Element 6 — Protect Slopes — Cut/fill slopes are not anticipated but if necessary will be protected as required. Element 7 — Protect Drain Inlets —The existing and newly constructed conveyance system inlets will be protected during construction. Element 8 — Stabilize Channels and Outlets — There are no existing or proposed surface channels or outfalls. 4 Element 9 — Control Pollutants — The small size of this project will limit the opportunity for discharge of pollutants. Waste/demolition debris will not be stockpiled, fueling will be done off - site and concrete trucks will be washed out off -site. Element 10—Control De -watering— De -watering is not anticipated, as construction will take place during the dry season. Element 11 — Maintain BMPs — BMPs will be maintained as necessary to assure continued functioning. Element 12 — Manage the Project —An inspector (sites less than 1 acre) will be present or on call to ensure BMPs are maintained and assess effectiveness of ESC measures. Rainy season requirements will be implemented if necessary. Element 13 — Protect Low Impact Development BMPs —The locations of the proposed infiltration trench and permeable pavement shall be protected from compaction to the maximum extent feasible during construction. Orange construction fencing shall be provided around the location for the proposed infiltration trench. Minimum Requirement No. 3 — Source Control of Pollution Permanent source control BMPs are not proposed. Construction source control BMPs are shown on the CSWPPP. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls The natural drainage pattern for the site will be maintained. The roof runoff will be collected and conveyed to the proposed infiltration trench. The trench will have an overflow to the existing public conveyance system within Daley Street. The existing conveyance system within Daley Street is tributary to the conveyance system within 3rd Avenue North. The remainder of hard surfaces will be permeable pavement surfaces that will infiltrate into the native soils. Minimum Requirement No. 5 — On -Site Stormwater Management The project triggers Minimum Requirements #1-5 therefore, On -Site Stormwater Management BMPs from List #1 will be implemented to the maximum extent feasible. Please see below for the feasibility evaluation of the BMPs from List #1 by surface type. Lawn and Landscaped Areas: 1. Post Construction Soil Quality and Depth — This BMP is feasible and will be implemented per City of Edmonds Standard Detail SD-642 for all disturbed and converted vegetated areas. Roofs: 1. Full Dispersion and Downspout Full Infiltration Systems — Infiltration is feasible and will be implemented for the proposed roof area per City of Edmonds Standard Detail SD-636 and Department of Ecology BMP T5.10A. 5 2. Raingarden or Bioretention — N/A, roof area will be mitigated with and infiltration trench. 3. Downspout Dispersion Systems — N/A, roof area will be mitigated with and infiltration trench. 4. Perforated Stub -out Connection — N/A, roof area will be mitigated with and infiltration trench. Other Hard Surfaces: 1. Full Dispersion — Infeasible. The minimum flow path length of 100 LF cannot be met. 2. Permeable Pavement, Rain Garden, or Bioretention — Permeable pavement is feasible and will be implemented for the proposed walkways and driveway. 3. Sheet Flow Dispersion — N/A, hard surfaces will be mitigated with permeable pavement. Summary — Post construction soil quality and depth will be implemented for all proposed pervious areas. Downspout full infiltration will be implemented for the proposed roof area and permeable pavement will be used for the proposed walkways and driveway. Infiltration Trench Sizing: A review of the site soil conditions was conducted by The Riley Group, Inc. Per the Soils Evaluation Report, the soils onsite are classified as "medium sand". Refer to Appendix A for the Soils Evaluation Report prepared by The Riley Group, Inc. Per Volume III, Section 3.1.1 — Downspout Full Infiltration Systems (BMP T5.10A) of the DOE Manual, for sites with medium sand, 30 LF of trench is required per 1,000 SF of roof area. This is equivalent to 60 SF of bottom surface area for a 1.5' deep trench per 1,000 SF of roof area (30' long x 2' wide = 60 SF). Although it can be argued that there is some infiltration capacity realized from the side walls of a trench, infiltration trenches are similar to a septic system. For a septic system the only surface that is counted as part of the infiltration/absorption surface is the bottom surface area. Therefore, we have increased the trench length and reduced the depth to provide an equivalent bottom surface area to the manual. Therefore; Roof Area = 2,711 SF Required Infiltration Trench = 60 SF x (2,711 SF / 1,000 SF) = 162 SF Proposed Infiltration Trench = 33' Long x 5' Wide x 1.5' Deep (165 SF) 0 Figure 3 — New Development Flow Chart Start Here Does the site ha35% Yes See FZedevelopment Minimum -or more of existing 10 Requirements and Flow Chart inn pervious coverage? (Figure 1.2.4_2)_ Does the project convert %s acres or more of vegetation to Does the project result in lawn or landscaped areas, or 5,000 square feet. or No convert 2.5 acres or more of greater, of new plus native vegetation to pasture? replaced hard surface area? No Yes Yes Yet Does the project result in 2,0M square feel, or greater, of new plus replaced hard surface area? All Minimum Requirements apply to the new and replaced Bard surfaces and converted vaptation fees. (2a No Does the project have land Minimum Requirements #1 disturbing activities of 7,000 through 95 apply to the new square feet or greater' and replaced hard surfaces and the land disturbed. No !Minimum Requirement 92 applies. Figure 1- .4.1 Flow Chart for Determining Requirements for New D v loprn nt DEPARTMENT CF RevitAdJune&2O15 E LOGY PIEMSE� MM h17pYAvww_6ty.w-8.gOWtdpyrighi.hi'rW for cbpyrkgll nikb-& induding permiMS OOS, State of Washinglon limilaiion of liability. and di8claim.9r_ 7 T1,�ffoltmvk, SOILS EVALUATION REPORT & INFILTRATION ASSESSMENT mom I LU RILEYGROUP December 23, 2020 Dennis Parker 323 Daley Street Edmonds, Washington Subject: Soils Evaluation Report 323 Daley Street Edmonds, Washington RGI Project No. 2020-654-1 As requested, The Riley Group, Inc. (RGI) is pleased to provide the results of our recent soils evaluation at the above -referenced Site (Figure 1). Our subsurface investigation was completed to assess soil and groundwater conditions in regard to the Snohomish County Drainage Manual (SCDM) Chapter 3 in regards to infiltration of downspouts via infiltration trenches. Subsurface Conditions RGI observed soil conditions in three test pit locations (TP-1 through TP-3) as shown on Figure 2. The test pit were excavated to depths ranging from approximately 5 to 7 feet below grade. Review of the Geologic Map of Edmonds East and part of the Edmonds West quadrangles, Washington, by James Minard (1983) indicates that the soil in the project vicinity is mapped as Whidbey Formation (Pre -Fraser Glaciation) deposits (Qw), which is described medium to coarse grained sand. Soil conditions observed in the test pits consisted of medium dense sand with varying amounts of gravel and cobbles. The soils became very dense at four feet below grade in test pits TP-1 and TP-2. Groundwater was not encountered in any of the subsurface explorations. Snohomish County Drainage Manual Volume III Chapter 3: Downspout Infiltration Infiltration feasibility was evaluated under Volume III/Chapter 3 of the SCDM. Site soil types were logged in the field per ASTM D-2487 soil description protocol and grain size analyses were performed on one soil sample from each of the three test pits. The Site soils are "medium sand" with more than 50% of the sand fraction remaining on the #40 sieve. This soil classification dictates infiltration trench length of 30 feet for each 1,000 square feet of roof area based on Table 3.3 Minimum Downspout Infiltration Trench Lengths based on soil type in Volume III/Chapter 3 of the SCDM. Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone 425.415.0551 # Fax 425.415.0311 www.riley-group.com Soils Evaluation Parker Edmonds Page 2 December 23, 2020 323 Daley Street, Edmonds, Washington RGI Project No. 2020-654-1 Please call us at (425) 415-0551 if you have any questions or need additional information. Respectfully submitted, THE RILEY GROUP, INC. ®� sh 0 ` C David J. Clou igarten� David J. Baumgarten, LHG Hydrogeologist Attachments: Figure 1, Site Vicinity Map Figure 2, Geotechnical Exploration Plan Test Pit logs (TP-1, TP-2, and TP-3 ) Grain Size Analysis I I M I LW RILEYGROUP' . J, oo _ Q 'L r Sunset Beach DALEY ST R 11 LC ST �- ❑AYTON ST AYTON ST - --� 104} MAPLE ST 1 ALDER ST 4 — WALNUT ST i -eI G��'- r �. �' _® CEDAR,ST --_ cur _ cIS '. �. INE S PINE ST o '19 a; ` do Fll4 ST USGS, 2020, Edmonds West, Washington Approximate Scale: 1"=1000' USGS, 2017, Edmonds East, Washington 7.5-Minute Quadrangle 0 500 1000 2000 N Corporate Office Parker Edmonds Figure 1 RGI Project Number: 2020-654-1 Site Vicinity Map Date Drawn: 12�2020 17522 Bothell Way Northeast -Bothell, Washington 98011 Phone: 425.415.0551 RILEYGROUP Fax: 425.415.0311 Address: 323 Daley Street, Edmonds, Washington 98020 1 1 —_____________________________________________________________________________� \ 1 1 1 1 ' — ALLEY 1 1 EDGE Of G-VEI - 1 --_-- w •isa zzaea — ' ye xaresz+w I ON c n ue , .. .z xBW4s—z1•W 1 — — -- .21 -171I 1 I I 1 I I I I 1 I I In.1 I I zs' 1 I j �•+1y�� j � e9 I I 1 LOT as wrs4 i tors LOTBP i.• Loral I torso I / O.314tptREa—NO I / 01ou s°i wEO11u01'rrB•s I I SH I wa I I j j I I I I I I I I I I I a 1/a' suss wls acB WA I I I o ♦ I I I I I I I I I I I I ra \\ I TP-1 �1 All � I I Wzs9zxcz I i i i I j vOxCH 12.1 / S. �In� �WxB x�eax m' TP x Wa xWa, .9NOWFEN<w 111 TP-2 ; / O' ,'----sa—t—� PORIP�imNOT I <oxc slOBwau< ' I '. \ xm•4a zlw... IOB.�4 — I --------------------- =1 I ryl FOUND exa I s msx �s..5- z35.e9'(Ra) �® �_s__ '4s•zw.oO•xz s-,t 4s_-_- sae —�-- -- - � — ——sea4—•a,•z — ON wm.ce DALEYSTcWs71W47 — — �9.x•ccl u9.�•cW,7c�7 = Test pit by RGI, 12/15/20 = Site boundary Approximate Scale: 1"=30' 0 15 30 60 N Project Name: Parker Edmonds Test Pit: TP-1 Project Number: 2020-654-1 Client: Dennis Parker RILEYGROUP Sheet 1 of 1 Date(s) Excavated: 12/15/2020 Logged By CM Surface Conditions: Grass Excavation Method: Track hoe Bucket Size: 18" Total Depth of Excavation: 5 feet Excavator Type: Track hoe Excavating Contractor: Client Approximate Not surveyed Surface Elevation Groundwater Level: Not encountered Sampling Grab Method(s) Compaction Method Bucket tamp Test Pit Backfill: Cuttings Location 323 Daley Street Edmonds Washington 98020 i ne mey croup, mu. 17522 Bothell Way NE, Bothell, WA 98011 Project Name: Parker Edmonds Test Pit: TP-2 Project Number: 2020-654-1 Client: Dennis Parker RILEYGROUP Sheet 1 of 1 Date(s) Excavated: 12/15/2020 Logged By CM Surface Conditions: Grass Excavation Method: Track hoe Bucket Size: 18" Total Depth of Excavation: 6 feet Excavator Type: Track hoe Excavating Contractor: Client Approximate Not surveyed Surface Elevation Groundwater Level: Not encountered Sampling Grab Method(s) Compaction Method Bucket tamp Test Pit Backfill: Cuttings Location 323 Daley Street Edmonds Washington 98020 i ne mey croup, mu. 17522 Bothell Way NE, Bothell, WA 98011 Project Name: Parker Edmonds Test Pit: TP-3 Project Number: 2020-654-1 Client: Dennis Parker RILEYGROUP Sheet 1 of 1 Date(s) Excavated: 12/15/2020 Logged By CM Surface Conditions: Grass Excavation Method: Track hoe Bucket Size: 18" Total Depth of Excavation: 7 feet Excavator Type: Track hoe Excavating Contractor: Client Approximate Not surveyed Surface Elevation Groundwater Level: Not encountered Sampling Method(s) Compaction Method Bucket tamp Test Pit Backfill: Cuttings Location 323 Daley Street Edmonds Washington 98020 i ne mey croup, mu. 17522 Bothell Way NE, Bothell, WA 98011 Project Name: Parker Edmonds Key to Logs Project Number: 2020-654-1 lk- Client: Dennis Parker RILEYGROUP Sheet 1 of 1 E a° c w H Z >, _J O O N U) U (6 L fl a C L > E E U m co co W W 0 (n W Z) C7 MATERIAL DESCRIPTION COLUMN DESCRIPTIONS 1 Elevation (feet): Elevation (MSL, feet). 2 Depth (feet): Depth in feet below the ground surface. LIJ Sample Type: Type of soil sample collected at the depth interval shown. ® Sample Number: Sample identification number. FIELD AND LABORATORY TEST ABBREVIATIONS CHEM: Chemical tests to assess corrosivity COMP: Compaction test CONS: One-dimensional consolidation test LL: Liquid Limit, percent MATERIAL GRAPHIC SYMBOLS RE Silty SAND (SM) TYPICAL SAMPLER GRAPHIC SYMBOLS Auger sampler E Bulk Sample Grab Sample 3-inch-OD California w/ 2.5-inch-OD Modified brass rings California w/ brass liners CME Sampler Pitcher Sample GENERAL NOTES REMARKS AND OTHER 55 USCS Symbol: USCS symbol of the subsurface material. 6 Graphic Log: Graphic depiction of the subsurface material encountered. �7 MATERIAL DESCRIPTION: Description of material encountered. May include consistency, moisture, color, and other descriptive text. ® REMARKS AND OTHER TESTS: Comments and observations regarding drilling or sampling made by driller or field personnel. PI: Plasticity Index, percent SA: Sieve analysis (percent passing No. 200 Sieve) UC: Unconfined compressive strength test, Qu, in ksf WA: Wash sieve (percent passing No. 200 Sieve) •�� • Poorly graded SAND (SP) • Poorly graded SAND with Silt (SP-SM) 2-inch-OD unlined split spoon (SPT) Shelby Tube (Thin -walled, fixed head) OTHER GRAPHIC SYMBOLS Water level (at time of drilling, ATD) Water level (after waiting) Minor change in material properties within a stratum Inferred/gradational contact between strata — ? — Queried contact between strata 1: Soil classifications are based on the Unified Soil Classification System. Descriptions and stratum lines are interpretive, and actual lithologic changes may be gradual. Field descriptions may have been modified to reflect results of lab tests. 2: Descriptions on these logs apply only at the specific boring locations and at the time the borings were advanced. They are not warranted to be representative of subsurface conditions at other locations or times. The Riley Group, Inc. 17522 Bothell Way NE, Bothell, WA 98011 THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425)415-0311 PROJECT TITLE Parker Edmonds PROJECT NO. 2020-654 FECH/TEST DATE RT WATER CONTENT (Delivered Moisture) Wt Wet Soil & Tare (gm) Wt Dry Soil & Tare (gm) Weight of Tare (gm) Weight of Water (gm) Weight of Dry Soil (gm) Moisture Content (%) (v • COBBLES 0.0 • C GRAVEL 17.3 • F GRAVEL 23.0 % C SAND 13.3 • M SAND 25.1 % F SAND 15.1 • FINES 6.2 • TOTAL 100.0 D10 (mm) 0.18 D30 (mm) 0.7 D60 (mm) 5.1 Cu 28.3 Cc 0.5 % 100 90 80 P 70 A 60 S 50 40 S 30 1 20 N 10 0 GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 SAMPLE ID/TYPE TP-1 SAMPLE DEPTH 1 foot 12/15/2020 DATE RECEIVED 12/15/2020 (w1) (w2) (w3) 535.0 498.4 16.1 Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moi Weight Of Sample (gm) Tare Weight (gm) (W6) Total Dry Weight (gm) 498.4 16.1 482.3 i1-w2) i2-w3) 3)*100 36.6 482.3 8 SIEVE ANALYSIS Cumulative Wt Ret Wt-Tare (%Retained) % PASS +Tare {(wt ret/wW1001 (100%ret) 12.0' 3.0' 2.5' 2.0' 1.5' 1.0' 0.75' 0.50' 0.375' #4 #1C #2C #4C #6C #10C #20C PAN 16.1 0.00 0.00 100.00 16.1 0.00 0.00 100.00 16.1 0.00 0.00 100.00 99.6 83.50 17.31 82.69 160.7 144.60 29.98 70.02 210.3 194.20 40.27 59.73 274.4 258.30 53.56 46.44 395.5 379.40 78.66 21.34 460.9 444.80 92.22 7.78 468.5 452.40 93.80 6.20 498.4 482.30 100.00 0.00 12" 3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200 G 1000 100 10 1 0.1 0.01 Grain size in millimeters DESCRIPTION Gravelly SAND with some silt USCS SP-SM Prepared For: Dennis Parker Reviewed By: CM cobbles coarse gravel coarse gravel coarse gravel coarse gravel coarse gravel fine gravel fine gravel fine gravel coarse sand medium sand medium sand fine sand fine sand fine sand fines silt/clay V.uu1 L- RILEYGROUP THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425)415-0311 PROJECT TITLE Parker Edmonds PROJECT NO. 2020-654 FECH/TEST DATE RT WATER CONTENT (Delivered Moisture) Wt Wet Soil & Tare (gm) Wt Dry Soil & Tare (gm) Weight of Tare (gm) Weight of Water (gm) Weight of Dry Soil (gm) Moisture Content (%) (v GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 SAMPLE ID/TYPE TP-2 SAMPLE DEPTH 2 feet 12/15/2020 DATE RECEIVED 12/15/2020 (w1) (w2) (w3) 530.6 477.2 16.1 Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moi Weight Of Sample (gm) Tare Weight (gm) (W6) Total Dry Weight (gm) 477.2 16.1 461.1 i1-w2) i2-w3) 3)*100 53.4 461.1 12 SIEVE ANALYSIS Cumulative Wt Ret Wt-Tare (%Retained) % PASS +Tare {(wt ret/wW1001 (100%ret) • COBBLES 0.0 12.0" • C GRAVEL 6.7 3.0" • F GRAVEL 19.1 2.5" • C SAND 8.8 2.0" • M SAND 24.0 1.5" % F SAND 31.2 1.0" • FINES 10.2 0.75" % TOTAL 100.0 0.50" 0.375" D10 (mm) 0.075 #4 D30 (mm) 0.29 #10 D60 (mm) 1.6 #20 Cu 21.3 #40 Cc 0.7 #60 % 100 90 80 P 70 A 60 S 50 40 S 30 1 20 N 10 0 #100 #200 PAN 16.1 0.00 0.00 100.00 16.1 0.00 0.00 100.00 16.1 0.00 0.00 100.00 46.8 30.70 6.66 93.34 96.6 80.50 17.46 82.54 135.1 119.00 25.81 74.19 175.8 159.70 34.63 65.37 286.6 270.50 58.66 41.34 414.2 398.10 86.34 13.66 430.3 414.20 89.83 10.17 477.2 461.10 100.00 0.00 12" 3" 2" 1".75' .375" #4 #10 #20 #40 #60 #100 #200 G 1000 100 10 1 0.1 0.01 Grain size in millimeters DESCRIPTION SAND with some silt and some gravel USCS SP-SM Prepared For: Dennis Parker Reviewed By: CM cobbles coarse gravel coarse gravel coarse gravel coarse gravel coarse gravel fine gravel fine gravel fine gravel coarse sand medium sand medium sand fine sand fine sand fine sand fines silt/clay V.uu1 L- RILEYGROUP THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425)415-0311 PROJECT TITLE Parker Edmonds PROJECT NO. 2020-654 FECH/TEST DATE RT WATER CONTENT (Delivered Moisture) Wt Wet Soil & Tare (gm) Wt Dry Soil & Tare (gm) Weight of Tare (gm) Weight of Water (gm) Weight of Dry Soil (gm) Moisture Content (%) (v GRAIN SIZE ANALYSIS ASTM D421, D422, D1140, D2487, D6913 SAMPLE ID/TYPE TP-3 SAMPLE DEPTH 2 feet 12/15/2020 DATE RECEIVED 12/15/2020 Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moi Weight Of Sample (gm) 664.8 (w1) 697.4 15.9 (w2) 664.8 Tare Weight (gm) 648.9 (w3) 15.9 (W6) Total Dry Weight (gm) i1-w2) 32.6 SIEVE ANALYSIS i2-w3) 648.9 Cumulative 3)*100 5 Wt Ret Wt-Tare (%Retained) % PASS +Tare {(wt ret/wW1001 (100%ret) • COBBLES 0.0 12.0" • C GRAVEL 20.4 3.0" • F GRAVEL 18.3 2.5" • C SAND 9.0 2.0" • M SAND 26.6 1.5" % F SAND 22.7 1.0" • FINES 3.1 0.75" % TOTAL 100.0 0.50" 0.375" D10 (mm) 0.2 #4 D30 (mm) 0.55 #10 D60 (mm) 4.6 #20 Cu 23.0 #40 Cc 0.3 #60 % 100 90 80 P 70 A 60 S 50 40 S 30 1 20 N 10 0 #100 #200 PAN 15.9 0.00 0.00 100.00 15.9 0.00 0.00 100.00 15.9 0.00 0.00 100.00 148.0 132.10 20.36 79.64 207.4 191.50 29.51 70.49 267.0 251.10 38.70 61.30 325.2 309.30 47.67 52.33 497.5 481.60 74.22 25.78 637.4 621.50 95.78 4.22 644.5 628.60 96.87 3.13 664.8 648.90 100.00 0.00 12" 3" 2" 1".75' .375" #4 #10 #20 #40 #60 #100 #200 G 1000 100 10 1 0.1 0.01 Grain size in millimeters DESCRIPTION Gravelly SAND with trace silt USCS SP Prepared For: Dennis Parker Reviewed By: CM cobbles coarse gravel coarse gravel coarse gravel coarse gravel coarse gravel fine gravel fine gravel fine gravel coarse sand medium sand medium sand fine sand fine sand fine sand fines silt/clay V.uu1 L- RILEYGROUP mom I LU RILEYGROUP January 15, 2021 Dennis Parker 323 Daley Street Edmonds, Washington Subject: Infiltration Assessment 323 Daley Street Edmonds, Washington RGI Project No. 2020-654-2 As requested, The Riley Group, Inc. (RGI) is pleased to provide the results of our recent infiltration assessment at the above -referenced Site (Figure 1). Our infiltration assessment was completed to estimate infiltration rates on the northern portion of the Site. Subsurface Conditions Soil conditions at the infiltration test location consisted of approximately 3.5 feet of brown silty sand underlain by gray lodgment till soils to the depth explored, 8 feet below existing grade. Groundwater was not encountered in any of the subsurface explorations. Infiltration Testing Small-scale Pilot Infiltration Test (PIT) IT-1 was completed on the northern portion of the site as shown on Figure 2. The test was completed at a depth of approximately two feet below grade per City of Edmonds protocol. A field rate of 0.90 inches per hour was measured in IT-1. Correction factors per the manual were applied to the field measured rate as described below: Ksatdesign = Ksatinitlai = CFv x CFT x CFM CFv = Site Variability CFT = Test Method CFM = Degree of Influent Control Ksatdesign = Ksatinitiai = 1 x 0.5 x 0.9 = 0.45 Ksatdesign = Ksatinitlai (0.90) X 0.45 = 0.40 inches/hour Ksatdesign = 0.40 inches/hour A Ksat design rate of 0.40 inches/hour was calculated with the applied correction factors. Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone 425.415.0551 # Fax 425.415.0311 www.riley-group.com Infiltration Assessment Parker Edmonds Page 2 January 15., 2021 323 Daley Street, Edmonds, Washington RGI Project No. 2020-654-2 Please call us at (425) 415-0551 if you have any questions or need additional information. Respectfully submitted, THE RILEY GROUP, INC. David J. Baumgarten,, LHG Hydrogeologist Attachments: Figure 1, Site Vicinity Map Figure 2, Site Plan IT-1 Soil Log I ME L RILEYGROUP . J, oo _ Q 'L r Sunset Beach DALEY ST R 11 LC ST �- ❑AYTON ST AYTON ST - --� 104} MAPLE ST 1 ALDER ST 4 — WALNUT ST i -eI G��'- r �. �' _® CEDAR,ST --_ cur _ cIS '. �. INE S PINE ST o '19 a; ` do Fll4 ST USGS, 2020, Edmonds West, Washington Approximate Scale: 1"=1000' USGS, 2017, Edmonds East, Washington 7.5-Minute Quadrangle 0 500 1000 2000 N Corporate Office Parker Edmonds Figure 1 RGI Project Number: 2020-654-2 Site Vicinity Map Date Drawn: 01�2021 17522 Bothell Way Northeast -Bothell, Washington 98011 Phone: 425.415.0551 RILEYGROUP Fax: 425.415.0311 Address: 323 Daley Street, Edmonds, Washington 98020 1 1 -_____________________________________________________________________________� \ 1 1 1 1 ' - ALLEY 1 1 - 1 w •isa zzasa — ' ----------- ye xswesz+w I FEN e , z xsw4s_zIw— .21 1 ON .. I I — -- -171I 1 1 ' cnaaci ® I ' IT-1 n.1 I y, I I zs' I LOT as i I I wrs4 tors LOTW i.• Loral orz9 / O.314tptREa I I I I / 01ou s°i wEO11u01'rrB's I I SH I wa I I I I I I —NO a 1/a' suss WA susacE I j j I I I o I ♦ I I I I I I I � I I I I I I \\ I TP-1 IPA ra s'.I � I I I WzsOExcE I I I // / I i i i WOO FEN E �B' —C. —. f ��$ I I I �s.esyc) zn.e9•(Wz) j ® = Infiltration test pit by RGI, 01/11/21 = Test pit by RGI, 12/15/20 = Site boundary j vOBCH 39WaWWarl I 1 TP-2 �-' • —7 I KNOT f ,xE I sz. BO I \ / I ------------ IB warEW uxE vEW air a EOuox9s as f R ------------------------- + + Y n� FOUND I DIER -s-,y--�-�=�-�-'_-�-� sm4B•z,t 4so.00'(xz _-�---- ON see DALEYST(Ws)(W4) _-- -- - — ——sm4—•z,'E azs.a•(cl sx9.Oz•eW,uwzl — — — _�/A��W Approximate Scale: 1"=30' 0 15 30 60 N Project Name: Parker Edmonds Test Pit: IT-1 Project Number: 2020-654-2 Client: Dennis Parker RILEYGROUP Sheet 1 of 1 Date(s) Excavated: 01/11/21 Logged By TR Surface Conditions: Grass Excavation Method: Excavation Bucket Size: Total Depth of Excavation: 8 feet bgs Excavator Type: Excavating Contractor: Parker Development Approximate n/a Surface Elevation Groundwater Level: Not encountered Sampling Grab Method(s) Compaction Method n/a Test Pit Backfill: Native Soil Location 323 Daley Street, Edmonds, Washington 98020 , ne mey croup, mu. 17522 Bothell Way NE, Bothell, WA 98011 Project Name: Parker Edmonds Key to Logs Project Number: 2020-654-2 Client: Dennis Parker RILEYGROUP Sheet 1 of 1 E a° c w H Z >, _J O O N U) U (6 L fl a C L > E E U m co co W W 0 07 W Z) C7 COLUMN DESCRIPTIONS MATERIAL DESCRIPTION 1 Elevation (feet): Elevation (MSL, feet). 2 Depth (feet): Depth in feet below the ground surface. LIJ Sample Type: Type of soil sample collected at the depth interval shown. ® Sample Number: Sample identification number. FIELD AND LABORATORY TEST ABBREVIATIONS CHEM: Chemical tests to assess corrosivity COMP: Compaction test CONS: One-dimensional consolidation test LL: Liquid Limit, percent MATERIAL GRAPHIC SYMBOLS RE Silty SAND (SM) TYPICAL SAMPLER GRAPHIC SYMBOLS Auger sampler Bulk Sample 3-inch-OD California w/ brass rings CME Sampler GENERAL NOTES II Grab Sample '2.5-inch-OD Modified California w/ brass liners Pitcher Sample REMARKS AND OTHER 55 USCS Symbol: USCS symbol of the subsurface material. 6 Graphic Log: Graphic depiction of the subsurface material encountered. �7 MATERIAL DESCRIPTION: Description of material encountered. May include consistency, moisture, color, and other descriptive text. ® REMARKS AND OTHER TESTS: Comments and observations regarding drilling or sampling made by driller or field personnel. PI: Plasticity Index, percent SA: Sieve analysis (percent passing No. 200 Sieve) UC: Unconfined compressive strength test, Qu, in ksf WA: Wash sieve (percent passing No. 200 Sieve) 2-inch-OD unlined split spoon (SPT) Shelby Tube (Thin -walled fixed head) OTHER GRAPHIC SYMBOLS Water level (at time of drilling, ATD) Water level (after waiting) Minor change in material properties within a w stratum Inferred/gradational contact between strata —?— Queried contact between strata 1: Soil classifications are based on the Unified Soil Classification System. Descriptions and stratum lines are interpretive, and actual lithologic changes may be gradual. Field descriptions may have been modified to reflect results of lab tests. 2: Descriptions on these logs apply only at the specific boring locations and at the time the borings were advanced. They are not warranted to be representative of subsurface conditions at other locations or times. The Riley Group, Inc. 17522 Bothell Way NE, Bothell, WA 98011