G2 Daley St SFRs Frontage Improvement Plan 3-18-22lll,.11lwl'
UTILITY CONTACTS
STORM SEWER:
EDMONDS PUBLIC WORKS
•
SET REBAR & CAP EMW LS #44651
(425) 771- 0235
O
FOUND REBAR & CAP (AS SHOWN)
®
FOUND CASED MONUMENT (AS SHOWN)
SANITARY SEWER:
EDMONDS PUBLIC WORKS
®
FOUND BRASS DISK (AS SHOWN)
(425) 771-0235
�PMr'
POWER METER
WATER:
EDMONDS PUBLIC WORKS
JrP
.
POWER POLE
(425) 771-0235
j POWER POLE W/LIGHT, TRANSFORMER & DROP
ELECTRIC:
SNOHOMISH COUNTY PUD
SIGN
PHONE. (425) 783-1000
STORM DRAIN MANHOLE
GAS:
SNOHOMISH COUNTY PUD
SEWER MANHOLE
PHONE. (425) 783-1000
SEWER CLEANOUT
TELEPHONE:
CENTURY LINK
EP
WATER METER
PHONE. 1-800-345-2712
WATER VALVE
FRUIT TREE
FIRE DEPARTMENT-
SOUTH COUNTY FIRE
(425) 551-1200
(R)
DISTANCE PER REFERENCE
(M)
DISTANCE AS MEASURED
(C)
DISTANCE AS CALCULATED
LS
LICENSED LAND SURVEYOR
F.F.
FINISHED FLOOR
>�E >�E >>>>�
HOGWIRE FENCE
WOOD FENCE
OH OH OH OH
OVERHEAD UTILITY LINE
--D----D----D----D---
STORM DRAIN LINE
--S----S----S----S---
SEWER LINE
-W----W----W----W---
APPROXIMATE WATER LINE
HORIZONTAL DATUM
NAD 1983(2011); PER RTK GPS TIES AND THE WASHINGTON
STATE REFERENCE NETWORK (WSRN). UNITS OF MEASUREMENT
ARE U.S. SURVEY FEET.
VERTICAL DATUM
NAVD 1988 PER RTK GPS TIES AND THE WASHINGTON STATE
REFERENCE NETWORK (WSRN). UNITS OF MEASUREMENT ARE U.S.
SURVEY FEET.
LEGAL DESCRIPTION
PARCEL A
LOTS 31, 32 AND ALL THAT PORTION OF LOT 30 LYING ON THE
WEST SIDE OF FOURTH STREET AS EXTENDED, ALL IN BLOCK 119,
THE CITY OF EDMONDS, SNOHOMISH COUNTY, WA, ACCORDING TO
PLAY THEREOF RECORDED IN VOLUME 2 OF PLATS, PAGE 39,
RECORDS OF SAID COUNTY, SITUATE IN THE COUNT OF SNOHOMISH,
STATE OF WASHINGTON.
CONTAINING 7208 SQ. FEET
PARCEL B
LOTS 33 AND 34, ALL IN BLOCK 119, THE CITY OF EDMONDS,
SNOHMOMISH COUNTY, WA, ACCORDING TO PLAT THEREOF
RECORDED IN VOLUME 2 OF PLATS, PAGE 39, RECORDS OF SAID
COUNTY, SITUATE IN THE COUNT OF SNOHOMISH, STATE OF
WASHINGTON.
CONTAINING 6600 SQ. FEET
NOTES
1. A SEPARATE DEMOLITION PERMIT IS REQUIRED FOR REMOVAL OF ANY EXISTING BUILDING.
2. THIS PERMIT DOES NOT AUTHORIZE GRADING ACTIVITY TO CROSS PROPERTY LINES OR
AFFECT ADJACENT PROPERTIES UNLESS EXPLICITLY AUTHORIZED BY THE OWNER(S) OF THE
PROPERT(IES) AFFECTED.
3. UNDERGROUND ALL NEW AND EXISTING ON -SITE TRANSMISSION LINES FROM THE BUILDING TO
THE POINT OF ORIGIN AT THE PRIMARY/DISTRIBUTION LINES FOR THE UTILITIES
4. ADJUST ANY EXISTING UTILITY WHICH MAY CONFLICT WITH STREET OR UTILITY IMPROVEMENTS
REFERENCE SURVEYS
Rl) THE PLAT OF THE CITY OF EDMONDS, SNOHOMISH COUNTY, WA, RECORDED IN VOLUME 2 OF
PLATS, PAGE 39
R2) RECORD OF SURVEY, RECORDING NO. 201112215004
R3) RECORD OF SURVEY, RECORDING NO. 9104255001
R4) RECORD OF SURVEY, RECORDING NO. 200708JO5220
R5) STATUTORY WARRANTY DEED, RECORDING NO. 200211200190
R6) SUPERIOR COURT DECREE NO. 10928
RECORDS OF SNOHOMISH COUNTY AUDITOR'S OFFICE
FOUND CASED
TACK IN 3/4'
IRON PIPE
SURVEYOR'S NOTES
235.65'(C) 235.69'(R2)
-
--D- - --
----W- --
NW 1/4 OF SW 1/4 SEC 24, TWP. 27N., RGE 03E.,
FRONTAGE IMPROVEMENTS
PARKER EDMONDS DALEY SFR
W.M.
25' GRAPHIC SCALE
20 0 10 20
SCALE: 1" = 20'
PROJECT DATA
VICINITY MAP
NOT TO SCALE
I I PROPERTY ADDRESS: 323 DALEY ST, EDMONDS, WA
�h TAX LOT NUMBER: 00434211903000
SI TE AREA: 6,600 SF (0.15 AC.)
v
ZONING DESI GNA TION: R- 6
I i
° i/ \ tee?\
PROJECT TEAM
i
6" SSCO WITH 12" a a ; V OWNER/ DALEY STREET BUILDERS, LLC
LAMPHOLE COVER WITH APPLICANT- 323 DALEY STREET
0.5" HEXBOLTS PER mW EDMONDS, WA 98020
5' PRIVATE DRAINAGE I COE STD SS-200. < e �= PHONE: (425) 359-9789
EASEMENTTOBENEFIT LOT A F ^ RIM=62.00t MATCH FG /
CONNECT TO EX. �-- - --�---------I � 6" SSCO WITH 12" Cl I IE-55.00t
"� CONTACT. DENNIS PARKER
SIDEWALK AT NEAREST _ LAMPHOLE COVER WITH �/ i ?5 �Q
EXPANSION JOINT ;� 10' SNO PUD INSTALL 7' WIDE COE STOBOST� PER �� Q ° e5 / ARCHITECT. CLOWARD SUSTAINABLE DESIGN
SIDEWALK PER CQE _ / . / l 630 NW 81 ST ST
EASEMENT-S-T&-PLAN TT-531 5B - R/M=59.00t MATCH FG /
_ _ / SEA TTLE, WA. 98117
60.00• IE=54.00t 0 - / PHONE: (206) 755-0759
N88'45'21 "W 60�00' � °°
120.00' � /
CONTACT.- BRIAN CLOWARD
_
EXISTING LANDSCAP� = = _ = _ �- _ =
- D -
AN RAMP FO u BE �0 '-
STRIP TO BE REMOVED / i
INSTALL�PONCRETE
_ _ _ _-_ __ __ _ __ _ _ _
- -
i 1" WATER EXISTING WATER METERi
i D- REPLACED. CITY TO
R=15' PROVIDE SPECIFICS
-W� - - - i
- ME ,PER COE TO BE UPSIZED TO 1"
i
CURB & GUTTER i
`� PER PLAN i
-W
i WA-130 PER COE W4-130
FOR CONSTRUCTION
- 6 --Vj� - - -W - -
i
COE STD
o ti� i
,�`
��,�' TR-520 (TYP) i
�-PAVEMENT REPAIR PER �� ir",
29'-6" PVC 0
-S - - - -S
S! -COE GLI-410 (T1P) aa4521 f/45o �)
.0!o MIN.
CB-1 TYPE 1 PER COE STD SD-303 / S88 45'21 "E 356.30'(R3)(R4) - - --\ - - ' /_
W VANED GRATE a I /OSBa•45.21'E 329.35'(C) 329.32'(R1)(R2)
RIM=57.53t MATCH FG DALEY ST IE=51.77t /
IE 6" PVC (N)=55.31 E=50.64t NEW SIDE SEWER o /
IE 12" CONC. (E,W)=54.82 NEW SIDE SEWER CONNECTION PER \ I O
NOTE: COORDINATE INSTALLATION CONNECTION PER M COE SS-202
AND RESTORATION WITH CITY P COE SS-202
INSPECTOR TO MAXIMIZE CAPTURE �
OF STORM FLOWS AT THIS LOCATION. \\ -D
^y 6ry/
/F(.MJNDSED TACK
IN 3/4- IRON PIPE
1. THE PURPOSE OF THIS SURVEY IS TO DETERMINE THE
LOCATION OF THE BOUNDARIES AND PROVIDE TOPOGRAPHIC
INFORMATION OF THE PARCEL AS DESCRIBED HEREON.
2. THIS SURVEY WAS MADE BY FIELD TRAVERSE USING A LEICA
1203 3" ROBOTIC TOTAL STATION AND GS 14RTK GPS WITH
RESULTING CLOSURES EXCEEDING THE MINIMUM ACCURACY
STANDARDS AS SET FORTH BY WAC 332-130.
J. THE BOUNDARY CORNERS AND LINES DEPICTED ON THIS
MAP REPRESENT DEED LINES ONLY. THEY DO NOT PURPORT
TO SHOW OWNERSHIP LINES THAT MAY OTHERWISE BE
DETERMINED BY A COURT OF LAW.
4. THE LEGAL DESCRIPTION IS PER RECORDS OF SNOHOMISH
COUNTY AUDITOR'S OFFICE, RECORDING NO. 200802290945,
DATED FEBRUARY 29, 2008.
5. FIELD WORK FOR THIS PROJECT WAS PERFORMED IN
OCTOBER, 2020 AND IS THEREFORE A REFLECTION OF THE
CONDITIONS AT THAT TIME. ALL MONUMENTS WERE VISITED
OR SET IN OCTOBER, 2020. THIS SITE CONTAINS
IMPROVEMENTS NOT LOCATED OR SHOWN AS A PART OF
THIS SURVEY.
6. THIS SURVEY DOES NOT PURPORT TO SHOW EASEMENTS OF
RECORD, IF ANY.
7. OVERHEAD UTILITY LINES SHOWN ON THIS MAP ARE
INTENDED TO SHOW THE DIRECTION OF THE OVERHEAD
UTILITY LINES ONLY AND DO NOT REPRESENT THE ACTUAL
WIDTH, NUMBER OR LOCATION OF LINES(S) ON THE UTILITY
POLES.
WA D.O.E. SOIL AMENDMENT NOTES
SOIL RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND
NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN ANY AREAS
REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON
SITE IN A DESIGNATED, CONTROLLED AREA, NOT ADJACENT TO PUBLIC RESOURCES
AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE
FEASIBLE.
SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT
BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A DRAINAGE
FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT
COMPLETION, DEMONSTRATE THE FOLLOWING:
1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS,
AND 5% ORGANIC MATTER CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE
PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF EIGHT INCHES
EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET
THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH
SOME INCORPORATION OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE.
2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL
3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS:
A. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO 659, AND A CARBON
TO NITROGEN RATIO BELOW 25: 1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35: 1 FOR
PLANTINGS COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION.
B. CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED MATERIALS MEETING
(A.) ABOVE; OR OTHER ORGANIC MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO
REQUIREMENTS, AND MEETING THE CONTAMINANT STANDARDS OF GRADE A COMPOST
STREET TREE NOTES
FOUND 3'
BRASS DISK
ON SURFACE
1. CITY SPRITE ZELKOVA (ZELKOVA SERRATA 'JFS-KW1) SHALL BE PLANTED ALONG
DALEY STREET
2. LITTLE GEM MAGNOLIA (MAGNOLIA GRANDIFLORA) SHALL BE PLANTED ALONG 47H
AVENUE NORTH.
J. THE FOLLOWING MINIMUM CLEARANCES SHALL BE MAINTAINED:
-5' FROM UNDERGROUND UTILITIES UNLES ADEQUATE PROTECTION IS
PROVIDED FOR THE TREE AND THE UTILITY LINE AS APPROVED BY THE
CITY. CALL 1-800-424-5555 TO REQUEST LOCATION OF UNDERGROUND
UTIL TIES
-10' FROM POWER POLES
-7.5' FROM DRIVEWAYS
-20' FROM STREET LIGHTS
-20' FROM OTHER EXISTING TREES
-JO' FROM STREET INTERSECTIONS EXCEPT AT INTERSECTIONS WITH
SPECIAL DESIGN TREATMENT AND/OR AS APPROVED BY THE CITY
Cl VIL ENGINEER
SURVEYOR
GEO TECHNI CAL
ENGINEER:
G2 Cl VIL
1375 NW MALL ST, SUITE 3
ISSAQUAH, WA 98027
PHONE. (425) 821-5038
CONTACT. EDWARD MECUM, PE
INFORMED LAND SURVEY
PO BOX 5137
TACOMA, WA 98415
PHONE. (253) 627-0137
CONTACT. • EVAN WAHLSTROM
THE RILEY GROUP
17522 BO THELL WAY NE
BOTHELL, WA 98011
PHONE. (425) 415-0551
CONTACT. • DAVID BAUMGARTEN, LHG
SITE IMPROVEMENT NOTES
1. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO THE
PRE -CONSTRUCTION MEETING.
2. RETAINING WALLS GREATER THAN FOUR (4) FEET IN HEIGHT REQUIRE A SEPARATE
BUILDING PERMIT.
3. FILL MATERIAL PLACED UNDER BUILDING FOUNDATIONS OR PAVEMENT SHALL BE
CRUSHED BASE ROCK OR COMPACTED STRUCTURAL FILL IN ACCORDANCE WITH CITY
AND WSDOT STANDARD SPECIFICATIONS.
4. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES, NOT LOCATED
WITHIN A TRAVELED ROADWAY OR SIDEWALK, SHALL HAVE SOLID LOCKING LIDS.
5. THIS PLAN DOES NOT SHOW THE LOCATION OF ALL EXISTING UTILITIES, IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES PRIOR TO
EXCAVATION.
6. THE CONTRACTOR SHALL EXPOSE ALL EXISTING PIPING THAT WILL BE CONNECTED TO
WITH NEW PIPING. DEPTH, LOCATION, AND CONDITION SHALL BE RELAYED TO THE
ENGINEER IF CONDITIONS VARY SIGNIFICANTLY FROM WHAT IS DETAILED OR
ANTICIPATED.
7. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE TO DETAILS AND
SPECIFICATIONS OF CITY STANDARDS. ALL CONSTRUCTION DEBRIS GENERATED DURING
CONSTRUCTION TO BE REMOVED & DISPOSED OF AT AN APPROVED LOCATION OFF
SI TE.
8. ALL CUT MATERIAL GENERATED DURING THE PROJECT THAT IS NOT ACCEPTABLE FOR
USE AS COMPACTED FILL MATERIAL AT ANOTHER LOCATION ON -SITE MUST BE
HAULED TO AN APPROVED LOCATION OFF -SITE.
SHEET INDEX
1. FRONTAGE IMPROVEMENT PLAN
2. CONSTRUCTION DETAILS
PERMIT NUMBER: BLD2021-0170/0172
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
I BY.•
I CITY ENGINEERING DIVISION
Date
JOB No.
5-1/2"
1" BATTER
R=1"
iv 0.05 FT/FT
i0
4
2' MIN SAWCUT
SEE NOTE 10
" / J
4 -5 8" 18" STANDARD 6"-5/8"
MINUS CSTC I SEE NOTE 11 I MINUS CSTC
STANDARD TYPE "A" CURBZGUTTER
(NOT TO SCALE)
HMA 4" OR MATCH
EXISTING, WHICHEVER IS
GREATER
SEE NOTE 12
NOTES:
1. CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR.
2. FORMS SHALL BE TRUE TO LINE AND GRADE AND SECURELY STAKED.
3. EXPANSION JOINTS SHALL BE PLACED ADJACENT TO ANY STRUCTURE.
4. EXPANSION JOINTS SHALL BE EVERY 10 FEET.
5. EXPANSION JOINTS SHALL HAVE 1/2" TO 5/8" WIDE PREMOLDED JOINT FILLER.
6. CONCRETE SHALL BE CLASS 3000.
7. FINISH SHALL BE LIGHT BROOM.
8. CURB SHALL BE SPRAYED WITH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS.
9. REMOVAL/REPLACEMENT OF CONCRETE CURB SHALL BE FROM EXPANSION TO EXPANSION JOINT, UNLESS OTHERWISE
DIRECTED BY CITY ENGINEER.
10. A 2-FT MINIMUM ASPHALT SAWCUT MAY BE REQUIRED AS DETERMINED BY CITY ENGINEER.
11. CURB/GUTTER SHALL BE 18" OR AS DIRECTED BY CITY ENGINEER.
12. ALL VERTICAL EDGES SHALL BE TACKED.
REVISION DATE
CITY OF EDMONDS CONCRETE CURB JANUARY 2018
AND GUTTER
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH T R- 5 2 0
TRq PR pFR/y All TFR
�° DVS/T/0 W/�T qS qP Z 0
8 y of OR/VFwq Y pROV FC eYl Vc re
P IY . �
ROpFR
al, FULL DEPTH
EXPANSION
,.
8 JOINT
EXPANSION
JOINT
SEE DRIVEWAY
CURB 3o,Mgk FNT/q`..
TRANSITIONAL 4f4* �2_% 'y//V/MU
DETAIL BELOW 6C0 Gq M
M,yFRCi q) E� �
DRIVEWAY APPROACH
CONCRETE CURB
AND GUTTER, SEE
/ O ` COE STD DTL
TR-520
6' TYP ` EXISTING PAVEMENT
FULL DEPTH MAX 15'
1/2" EXPANSION 2' MIN
JOINT SAWC UT
8.39; MAX SLOPEI O 7 2�MAXMAX
6" CURB 7
a .
3 2
SECTION A -A
DRIVEWAY CURB TRANSITIONAL DETAIL
FOR CURB AND GUTTER OR VERTICAL CURBS
NOTES:
OCURB AND GUTTER SHALL BE POURED SEPARATELY FROM THE SIDEWALK. CITY INSPECTION REQUIRED ON FORM WORK
PRIOR TO POUR.
2O DRIVEWAY APRON INCLUDING WING RAMPS SHALL BE A MINIMUM OF 6" THICK AND SHALL BE PLACED ON 2" OF 5/8"
CSTC COMPACTED TO 95% MAXIMUM DENSITY.
3O SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DENSITY.
4O 2' ASPHALT SAWCUT REQUIRED WITH CURB/GUTTER INSTALLATION. REFER TO COE STD DTL TR-520.
5O CONCRETE SHALL BE CLASS 3000.
O6 CURB TRANSITION SHOULD MAINTAIN A SLOPE NO GREATER THAN 8.3%. IF THE SLOPE REQUIREMENT CANNOT BE
ACHIEVED, MAXIMUM CURB TRANSITION LENGTH SHALL BE 15-FEET.
7O MAINTAIN 1/2" LIP AT GUTTER.
8O IF DRIVEWAY WIDTH EXCEEDS 15', INSTALL A FULL DEPTH EXPANSION JOINT AT CENTER OF DRIVEWAY.
O9 INSTALL MINIMUM 5-FT TRANSITION PANEL BETWEEN DRIVEWAYS AND WHEN CONNECTING TO EXISTING SIDEWALK.
10 FINISH SHALL BE LIGHT BROOM.
REVISION DATE
CITY OF EDMONDS DRIVEWAY APPROACH APRIL 2021
PUBLIC WORKS TYPE I STANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH T R - 5 41
10'
rvnnucinni ni luau
PLAN VIEW
(NOT TO SCALE)
5' MIN
FULL DEPTH 1/2" EXPANSION
CURB/GUTTER JOINT MATERIAL
SEE COE STD
DTL TR-520 _ 2% MAX
a
a 1/2„ R a Q a. Q d 1/2" R
a .Q d
aa as as a as as as a
47
'2" MIN 5/8" MINUS CSTC
ON NATIVE BEARING SOIL
SECTION VIEW SEE NOTE 9
NOTES: (NOT TO SCALE)
1. CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR.
2. CONCRETE SHALL BE CLASS 3000.
3. FINISH SHALL BE LIGHT BROOM.
4. SIDEWALK THICKNESS SHALL BE 4".
5. SIDEWALK THICKNESS AT DRIVEWAYS SHALL BE 6" THICK.
6. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK.
7. LIDS FOR JUNCTION BOXES AND UTILITY VAULTS SHALL BE NON-SKID AS SPECIFIED BY ENGINEER.
8. SEE COE STD DTL TR-550 FOR POSSIBLE ROOT BARRIER INSTALLATION.
9. SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DENSITY.
10. ALL EDGES WITH EXPANSION JOINTS SHALL HAVE RADIUS
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
`St. 18y"
NOTES:
1. TREE GRATE SHALL BE URBAN
ACCESSORIES MODEL KIVA 3'x3' OR
EQUIVALENT. TREE GRATE FRAME
SHALL BE URBAN ACCESSORIES
MODEL TYPE "S" OR EQUIVALENT.
2. SLOTS IN GRATE SHALL BE NO
GREATER THAN 1/2" IN ONE
DIRECTION.
3. HOLES (SQUARE OR ROUND), SHALL
BE NO GREATER THAN 1/2" IN
DIAMETER.
4. WITH ELONGATED OPENINGS, LONG
DIMENSIONS SHOULD BE
PERPENDICULAR TO THE DOMINANT
DIRECTION OF TRAVEL.
5. ROOT BARRIER SHALL BE 24" DEEP
AND SHALL BE MADE OF
BIO-BARRIER TRIFLURALIN, AS ROOT
CONTROL CHEMICAL OR APPROVED
EQUAL.
6. BACKFILL SOIL FINAL GRADE SHALL
NOT BE HIGHER THAN THE TREE
ROOT FLARE. ROOT FLARE SHALL BE
SET 3" BELOW THE TOP OF GRATE.
DECIDUOUS TREE PLANTING
TREE GUARD (OPTIONAL)
FINISH GRADE
CONCRETE PAVEMENT
CONCRETE SIDEWALK
APPROVED BY: R. ENGLISH
REVISION DATE
JUNE 2019
STANDARD
DETAIL
TR-531
t3.-5/8'-
t3'-1/8"
1 00
o_000_ o000
�000
0o O ORo 00
��ODD 0 D�DDD�00000
I I
+I -H
�gn 00 0
OOoo OO0000 0000OD o000
_44-
ADA STANDARD
TREE GRATE
(SEE NOTES 1-4)
FINISH GRADE CONCRETE
PAVEMENT
Ir-24" DEPTH APPROVED ROOT BARRIER
MATERIAL WRAPPED ENTIRELY AROUND
SIDES OF PLANT PIT.
SEE NOTE 5.
Ir3" SEE NOTE 6
N T
ZI
COMPACT SUBGRADE
/ TO 95%
.//\ BACKFILL SOIL
IF HARDPAN, NATIVE SOIL ��� /��� 12" DEPTH LIGHTLY COMPACTED
MUST BE SCARIFIED 3-WAY PLANTING SOIL
REMOVE ROOT BALL WRAP
OR WIRE BASKET
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
TREE GRATE
APPROVED BY: R. ENGLISH
REVISION DATE
APRIL 2019
STANDARD
DETAIL
TR-551
O
xr �
PARALLEL A PARALLEL CURB RAMP PARALLEL B
WSDOT STANDARD PLAN F-40.12-03
http://www.wsdot.wa.gov/pu blications/fulltext/Standards/eng I ish/PDF/f40.12-03-e.pdf
COMBINATION CURB RAMP
WSDOT STANDARD PLAN F-40.14-03
http://www.wsdot.wa.gov/pu blications/fulltext/Standards/eng I ish/PDF/f40.14-03-e.pdf
PERPENDICULAR A PERPENDICULAR B
PERPENDICULAR CURB RAMP
WSDOT STANDARD PLAN F-40.15-03
http://www.wsdot.wa.gov/pu blications/fulltext/Standards/eng I ish/PDF/f40.15-03-e.pdf
3
SINGLE DIRECTION A SINGLE DIRECTION A (MOD)
SINGLE DIRECTION CURB RAMP
WSDOT STANDARD PLAN F-40.16-03
http://www.wsdot.wa.gov/pu blications/fulltext/Standards/eng I ish/PDF/f40.16-03-e.pdf
NOTES:
1O USE WSDOT DETAILS FOR HORIZONTAL LAYOUT, SLOPE, DETECTABLE
WARNING SURFACE PLACEMENT. USE COE STD DTL TR-531 FOR ALL
OTHER SPECIFICATIONS.
OSEE WSDOT DETECTABLE WARNING SURFACE STANDARD PLAN F-45.10-02
FOR DETECTABLE WARNING SURFACE INSTALLATION ON ALL RAMP TYPES
OMUST INCLUDE A MIN. 4'X4' STREET LEVEL LANDING (MAX 2% SLOPE
ALL DIRECTIONS).
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
4"
(MIN)
PAVEMENT
BASE COURSE,
SEE NOTE 2
6"
ATB: 2" (MIN) (MIN)
SCC: 3" (MIN)
P
OR C
OR PER
MANUFACTURER
RECOMMENDATION
6"
(MIN)
1' (MIN) ABOVE SEASONAL
HIGH
GROUNDWATER TABLE OR
HYDRAULICALLY RESTRICTIVE
LAYER
GENERAL NOTES:
CURB RAMPS
APPROVED BY: R. ENGLISH
REVISION DATE
MARCH 2O19
STANDARD
DETAIL
TR-540
POROUS HMA/WMA, SEE NOTE 1
PERMEABLE ASPHALT TREATED
BASE COURSE OR CRUSHED
SURFACING CHOKER COURSE,
SEE NOTE 3
PERMEABLE BALLAST, SEE NOTE 4
RUNOFF TREATMENT LAYER
(IF REQUIRED PER EDMONDS
STORMWATER CODE), SEE NOTE 5
SUBGRADE,
SEE NOTE 6
1. REFER TO THE 2017 CITY OF EDMONDS STORMWATER ADDENDUM FOR SETBACK (CHECKLIST 1 1) AND
INFEASIBILITY REQUIREMENTS.
2. THE MINIMUM THICKNESS SHOWN ABOVE MAY NOT BE SUFFICIENT FOR ALL APPLICATIONS. A PROJECT SPECIFIC
PAVEMENT DESIGN SHALL BE PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON
IN CIVIL ENGINEERING TO:
2.1. SUPPORT THE ANTICIPATED LOADING (E.G. PAVEMENT DESIGN LIFE, INITIAL AND TERMINAL SERVICEABILITY,
RELIABILITY, ETC.) AND
2.2. TO SATISFY THE HYDROLOGIC REQUIREMENTS OF THE CITY OF EDMONDS STORMWATER CODE (I.E., CODE MAY
WARRANT A THICKER PAVEMENT SECTION THAN THE MINIMUM STRUCTURAL SECTION REQUIRED).
3. FOR SUBGRADE SLOPES 3% OR GREATER, SUBSURFACE CHECK DAMS OR OTHER METHODS TO PROMOTE
SUBSURFACE PONDING ARE REQUIRED.
4. GEOTEXTILE SHALL NOT BE USED IN PAVEMENT SECTION UNLESS REQUIRED BY GEOTECHNICAL ENGINEER. IF
REQUIRED, GEOTEXTILE SHALL CONFORM TO WSDOT 9.33.2(1) GEOTEXTILE FOR SEPARATION, WOVEN TYPE.
5. REFER TO WSDOT LOCAL AGENCY GSPs DIVISIONS 2-9 FOR APWA GSPs.
NOTES:
1. POROUS HMA SHALL CONFORM TO REQUIREMENTS OF APWA GSP 5-04. SURFACE SLOPE SHALL BE BETWEEN
0.5% AND 5%.
2. PAVEMENT BASE SHALL BE INSTALLED PER APWA GSP 4-04.3(5) SHAPING AND COMPACTION.
3. PERMEABLE ASPHALT TREATED BASE (PATB) SHALL CONFORM TO THE REQUIREMENTS OF APWA GSP 4-SA2.
CRUSHED SURFACING CHOKER COURSE (CSCC) SHALL CONFORM TO THE REQUIREMENTS OF APWA GSP
4-04.2(9-03.9(2)).OPT2.
4. PERMEABLE BALLAST SHALL CONFORM TO THE REQUIREMENTS OF APWA GSP 4-04.2(9-03.9(2)).OPT1.
5. RUNOFF TREATMENT LAYER SHALL MEET THE REQUIREMENTS OF 2017 CITY OF EDMONDS STORMWATER
ADDENDUM.
6. PREPARE AND PROTECT SUBGRADE PER APWA GSP 2-06.3(3) SUBGRADE FOR PERMEABLE PAVEMENTS.
REVISION DATE
CITY OF EDMONDS TYPICAL POROUS APRIL 2021
ASPHALT PAVEMENT
� PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH S D - 6 21
PERMIT NUMBER: BLD2021-0170/0172
BY.
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
CITY ENGINEERING DIVISION
Date
m
0 C)
Y
m w
0
m Y
3
0
cm
w
H 00
O
Ln cV Ln
.O
cJ 0y1 (V
J 00
QLn
cV
a ..
z Lu
� <
M V) 2
r-I L d
LL
V/
J
W
J
WJ
oa
J
��N
0
w Ld 00 00
o � °' rn
O
m >_��
O
V
� J M
wUo,
� 00 N
W
0�
w
w
o
ZW
0
UQ
SHEET
2 of 2
JOB No.