Special Inspections_memo_Permeable Pavement_6_9_2022June 7, 2022 Mr. Dennis Parker 323 &327 Daley Street Edmonds, Washington RE: Geotechnical Special Inspections: Alley/Driveway Permeable Paving 327 Daley Street: Permit # BLD2021-0172/ENG2021-0233 323 Daley Street: Permit # BLD2021-0170/ENG2021-0230 Edmonds, Washington RGI Project No. 2020-654-3 References: Litchfield Engineering, Plan sheet Site Improvement Plan Parker Edmonds Daley West — SFR Site Improvement Plans, dated October 18, 2021. Litchfield Engineering, Plan sheet Site Improvement Plan Parker Edmonds Daley East — SFR Site Improvement Plans, dated October 18, 2021. Dear Dennis, As requested., The Riley Group, Inc. (RGI) is providing this letter documenting our Special Inspection of the permeable pavement in the alley north of 323 and 327 Daley Street sites and the driveways for each site. The Riley Group, Inc. (RGI) has performed field inspection of the permeable pavement on May 25, 2022. Based on our observation, the pervious pavement was constructed per city approved plan and specifications. RGI conducted a site visit on May 25, 2002 and observed the 4 inch thick layer of permeable asphalt in the alley. RGI conducted a test of the permeable asphalt following the ASTM 1781 standard. Two tests were completed on the permeable pavement in the alley. Both tests indicated infiltration rates above 1,000 inches/hour, acceptable for the permeable pavement under the ASTM 1781 standard. If you have any questions or require additional information, please contact us. Respectfully submitted, THE RILEY GROUP, INC. N David J Baumgarten, LHG Associate Hydrogeologist I. -