SIGNED ENG bld20181098 Special Inspection AgrmtCITY OF EDMONDS — ENGINEERING DIVISION
SPECIAL INSPECTION AND TESTING AGREEMENT
;RIVTTT # 8I,D20181098 DATE: 11/27/2019
:O.IECT SITE ADDRESS: 721 Edmonds Wav, Fdmonds, WA 98020
,OJEC'T NAME: ChunEr Lot 1
c
ECIAL INSPECTION AGENCY `��`AA < OUi'�� C>>av�CCVh CC�1/1�L1' � t V1
Inc form must be completed by each Special In pection Agency or lnspec o .
SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project, as applicable.
accordance with Title 18 Edmonds Community Development Code (ECDC). When required, the project
ist be installed/constructcd per approved plans and specifications. 'The owner or the registered design
)fessional in charge shall employ an independent testing inspection agency/special inspector to perform
111ired special inspections. The special inspector shall be a qualified person xvith competence for
pectins the specific type of construction or operation requiring special inspection. The owner, registered
)fessional. contractor and special inspector/agency shall provide a special inspection report detailing
npliance with approved plazas and specifications directly to the Engineering Division,
DRK REQURING SPECIAL INSPECTION: Special inspections will be required for the following
egories of work: 1-'OR SPECIFIC INFORMATION REGARDING RL'QUIKED SPECIAL
SPECTIONS SE;E THE STATEWNT OF SPECiAi. INSPECTION NOTEi) AS A CONDITION ON
IF, RUILDIN6 PERMIT AND/OR ON THE APPROVED PLANS.
] Road subgrade placement and compaction
] Pervious Pavement and Perk ions Concrete Installation
] Erosion and Sediment Control and Slope Protection
Inftltration/bioretention subgrade preparation (prior to placing rock) RECEIVED
] Detention Vault DEC 2 '; Zbi-i
] Final }:SC:
BUILDING
YORE A PERMIT CAN BE ISSUED: Tiie Denier and contractor and special inspector shall. complete
s agreement and return to a Permit Coordinator prior to permit issuance.
'PROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Engineering
vision prior to pertornling any duties or inspections. The credentials of the specific person performing
• inspection shall he submitted. When applicable, the company performing inspections must be
;redited by the American Association of State I-Iighw•ay and Transportation Officials (AAST-ITO) R 19.
Nap,r t or 3
1. OBSERVE WORK
The special inspector shalt observe the site work. for conformance with the approved (stamped) plans
and specifications. Special inspections are to be performed as needed. to confirm that the work
being completed meets specifications and approved plans.
2. REPORT NONCONFORMiNC ITEMS
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and engineer of record. The special inspector shall provide a report to the Engineering Division
notifying of any items not resolved and/or not installed per the approved plans and specifications.
Items not constructed per the approved plans and specifications will result in a review of the plans
to determine what requirements will he needed for the project to meet the necessary stormwatet
requirements: such as removal and reconstruction. re -design of the stormwater manag.emenl
system(s), etc.
l-inal approval for the project will not occur until installation ol'all required improvements is
complete and accepted by the Special inspector and the City.
3. FINAL CONSTRUCTION REPORT
The special inspector or inspection agency shall submit a final signed report or Certificate of
Compliance to the City stating that all items requiring special inspection and testing were fulfilled
and reported. The report shall also include a statement from the inspector stating to tine best of
his/her knowledge the project is in conformance with the approved plans. specifications, and
approved plan revisions, if any. Items not in conformance. unresolved items or any discrepancies
in inspection coverage (i.e., missed inspections. periodic inspection when continuous inspections
were required, etc.) shall be specifically addressed in tlus report.
Contractor Responsibilities
I. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS
it is the duty of the contractor to notify the special inspector when work is ready [or special
inspection. Note, the items listed under the statement of special inspection on the building pernd
and as noted on the approved plans and specifications are required to have special inspections.
Adequate notice shall be provided by the contractor so that the special inspector has time to become
familiar �N ith the project. All work requiring special inspection must be approved prior to concealing
or covering said work.
2. PROVIDE ACCESS TO APPROVED PLANS
The contractor is responsible for providing the Special inspector access to approved plans at the
jobsite.
3. RETAIN SPECIAL INSPECTION R1ECORDS
The contractor is responsible to retaili at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City Fngineering inspector upon request
and upon completion of work.
City of Edmonds Engincerine Division Responsibilities
1. APPROVE SPECIAL INSPECTION
The Engineering Division shall approve all Special Inspectors and special inspection requirements.
2. MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS
Page 2 or 3
,i'he Engineering Division shall approve all Special Inspectors and special inspection requirements
2. MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS
Work requiring special inspection, and performance of special inspectors shall be monitored by the
l ngineering Division Inspector. Engint=ing Inspector approval must be obtained prior to
placement of concrete or oilier similar activities in addition to that of the special inspector.
3. FINAL APPROVAL
The Fmgineering Division may provide final inspection approval after the special inspectior
report(s) have been submitted and accepted by the City.
►. Owner Responsibilities
1. JChe project owner or the en,( or architect of record acting as the owner's agent shall Fund
special inspection services.
Engineer or Architect of Record Responsibilities
1. Prepare Statement of Special Inspections,
2. Review the special inspection reports and provide corrective action for work that may not conlorni
to the approved plans.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
wner name
V (plenreiAt ot"type)
Signature Date (7- z
merat Contractor C:ompanylOwner name n
(please print r
type)
Signature Date
iecial Inspector/Agenc) name youth Sound Geotechnicat Consultine
(pitaxe print or type)
Signature ' ������ Date 12-20-19
igincer of Record name
Consulting, LLC, Mark Keller. PE
(plum print or type)
Signature �-
turn the original signed agreement to:
ty of Edmonds Development Services Department
l nth Avenue 'Forth, C'it, Hall Second Floor
.monds, WA 98020
`CEPTED BY CITY OF EDMONDS ENGMERING DIVISION:
1�n �\— ,
Date 12/23/19
Page 3 of 4