Loading...
DNS BLD2023-0305+CRA INFO+3.9.2023_1.58.11_PM+34120173/9/2023 Wall does not meet the height requirement to require a permit other than its location on the other side of an interrupted buffer as identified within CRA2023-0025. Excerpt from Biologist report. Critical Area Buffer Interruption Per ECDC 23.40.220(C)(4), areas physically separated from a stream or wetland due to existing paved areas may be exempt front prescribed buffer widths if they are proven to be functionally isolated from the stream or wetland_ The City of Edmonds requires documentation demonstrating that the interrupted buffer area is functionally isolated, considering the hydrologic, geologic, and/or biological habitat connection potential and the extent and permanence of the physical separation. The existing paved driveway on the subject property functionally disconnects the entire project area from Stream A and Wetlands A and B_ The Following sections demonstrate that the driveway prevents the project area from performing stream and wetland hydrologic and habitat buffer functions. In an effort to resolve this without further issue. An application for permit is being filed.