BLD2023-0343_Other_6.13.2023_12.38.52_PM_3606273Washington State Department of
Labor & Industries
Your jobsite for permit number 4075711E was inspected 5/9/2023 by Electrical Inspector Casey Massin.
The results of inspection are listed below:
Inspections:
Inspection Date
Inspection
Result
Inspection Comment
5/9/2023
Miscellaneous,Other
Approved Complete
VEI - NOTE: LINE SIDE
OF FEEDER AND
CIRCUITS ARE NOT
TERMINATED AT THIS
TIME.
5/9/2023
Cover,Feeder,Walls & Ceiling
Approved Complete
VEI - COVER 1/0 SER
FROM EXISTING
PANEL TO NEW SUB -
PANEL.
5/9/2023
Cover,Circuit,Walls & Ceiling
Approved Complete
VEI - COVER
KITCHEN/LAUNDRY
REMODEL. 6
CIRCUITS INLUDING 2
KITCHEN, 1 LAUNDRY,
1 DRYER, AND 1
LIGHTING CIRCUIT. 5
TOTAL RECEPTACLES
INCLUDING DRYER
AND DOUBLE
DUPLEX.
The following corrections were written on this inspection today.
The following corrections were marked completed on this inspection today.
You can view all inspection information on this permit online at Labor and Industries, electronic permit
and inspection system. Additional fees may be assessed and will not appear until they are processed by
our support team.
If you do not have any correction(s), no further action is needed at this time.
You may have one or more correction items needing attention:
The results of your inspection request are attached. Your installation did not meet minimum safe -wiring
standards required by Washington state law. [National Electrical Code, RCW 19.28, and/or WAC 296-
46B]
Please note that per RCW 19.28.101(3); all corrections must be made within 15 days of the date issued.
Washington State Department of
Labor & Industries
For correction items notated "Reinspect on Final"; you must complete the corrections within 15 days of
the date issued and request a progress inspection or final inspection within 45 days of the date of this
letter.