PLN2022-0015 SEPA DNS 2022 Phase 9 Sewer Replacementof EnM
CITY OF EDMONDS
121 5TH AVENUE NORTH, EDMONDS, WA 98020 - (425) 771-0220
DETERMINATION OF NONSIGNIFICANCE
Description of proposal: The Phase 10 Sewer Replacement Project will replace sewer pipes and
associated appurtenances within right-of-way and easements at various locations in Edmonds. The
replacement from 91h Ave. S to 10th Ave. S on Maple St. uses pipe greater than 12 inches in diameter (18-
inch PVC pipe), which triggers a threshold determination.
Proponent: City of Edmonds
Location of proposal, including street address if any: 9th Ave. S to 10th Ave. S on Maple St.
Lead agency: City of Edmonds
The lead agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment. An environmental impact statement (EIS) is not required under RCW
43.21C.030 (2)(c). This decision was made after review of a completed environmental checklist and
other information on file with the lead agency. This information is available to the public on request.
The City of Edmonds has determined that the requirements for environmental analysis and protection
have been adequately addressed in the development regulations and comprehensive plan adopted under
chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW
43.21C.240 and WAC 197-11-158 and/or mitigating measures have been applied that ensure no significant
adverse impacts will be created.
XX There is no comment period for this DNS.
This DNS is issued after using the optional DNS process in WAC 197-11-355. There is no
further comment period on the DNS.
This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14
days from the date below. Comments must be submitted by
Project Planner: Tristan Sewell, Planner (Tristan.Sewell@edmondswa.gov)
Responsible Official: David Levitan, Planning Manager (David.Levitan@edmondswa.gov)
Contact Information: City of Edmonds 1 121 5th Avenue North, Edmonds WA 98020 1 425-771-0220
/
Date: June 20, 2023 Signature:
XX You may appeal this determination to David Levitan, Planning Manager, at 121 5th Avenue
North, Edmonds, WA 98020, by filing a written appeal citing specific factual objections to the
determination, together with the required appeal fee, no later than February 22, 2023.
XX Posted on June 20, 2023, at the project site, City Hall, and the Edmonds Public Safety Building.
Published in the Everett Herald. Emailed to the Department of Ecology SEPA Center
(SEPAunit@ecy.wa.gov). Mailed to property owners within 300 feet of the site.
XX Distribute to "Checked" Agencies below.
The SEPA Checklist, DNS, and associated documents can be obtained online at
http://edmondswa.gov/public-notices-text/development-notices.html under the development notice for
application number PLN2022-0095, by emailing the City contact listed below, or by calling the City of
Edmonds at 425-771-0220.
Page 1 of 2
PLN2022-0015 SEPA DNS 2022 PHASE 9 SEWER REPLACEMENT
6/20/23.SEPA
Distribution List: This DNS and SEPA checklist were distributed to the following:
❑X Applicant
❑ Parties of Record
❑ US Army Corps of Engineers
❑ US Fish and Wildlife
❑X Puget Sound Energy
❑ Snohomish PUD
❑ Olympic View Water & Sewer
❑ Alderwood Water District
❑ Edmonds School District
❑ Port of Edmonds
❑X South County Fire
❑ Swedish Hospital
❑ Community Transit
pc: File No. PLN2022-0095
SEPA Notebook
❑X Dept. of Ecology
❑ Dept. of Ecology - Shorelands
❑ Dept. of Natural Resources
❑ Dept. of Commerce
❑N WSDOT
❑ WSDOT— Ferries
❑ Dept. of Fish & Wildlife
❑ Dept. of Health — Drinking Water
❑N Dept. of Arch. & Historic Pres.
❑ Dept. of Parks and Rec. Commission
❑ Puget Sound Clean Air Agency
❑ Puget Sound Regional Council
❑ Puget Sound Partnership
❑X Tulalip Tribe
❑ City of Everett
❑ City of Lynnwood
❑ City of Mountlake Terrace
❑ City of Mukilteo
❑ City of Shoreline
❑ Town of Woodway
❑ Snohomish Co. Public Works
❑ Snohomish Co. PDS
❑ Snohomish Co. Health Dist.
❑ King County -Transit
❑ King County— Environ. Planning
❑ Other
Page 2 of 2
PLN2022-0015 SEPA DNS 2022 PHASE 9 SEWER REPLACEMENT
6/20/23.SEPA