ENG COMPACTION REPORT DFRS" Earth Solutions NW«C 15365 NE 9011 Street, Suite 100 FIELD REPORT NWLLC Redmond, WA 98052 6t Main (425) 449-4704 1 Fax (425) 449-4711 esnw.com Project No. 9024.00 Page 1 of 2 Report ID 9024.00 E 01032023 Date Tue 1/3/2023 Weather 460F Cloudy Arrival/Departure Time(s) 12:45PM; 1:30PM Travel Time (hr) 1.25 Project Name Echelbarger 92nd Lot Location 21322 - 92nd PI W, Edmonds ESNW Rep. & Phone Christopher Halter, (206)-602-9915 Client Info/Contact Echelbarger Homes, Inc. I Todd Echelbarger General Contractor Info/Contact Reviewed By LAC IAL KRC Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide ourclientwith a source of professional advice, opinions, and recommendations based upon the field representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. At client's request, ESNW rep was onsite to test compaction of backfill placed over stormwater utility and retrieve a proctor sample. Compaction of Backfill Over Stormwater Utility: While onsite ESNW rep observed contractor working on the stormwater trench between the existing storm utility and C13-1. Contractor expressed to rep that at the bottom of the trench a 12-inch corrugated PVC pipe was bedded in 5/8ths minus crushed rock. Contractor expressed that the backfill consisted of 14 minus crushed rock placed in one -foot lifts and compacted with a hoe pack. Rep took compaction tests and observed compaction of 95 percent or more at the tested locations. See table and picture below with approximate test locations. Retrieval of Proctor Sample: While onsite ESNW rep retrieved a proctor sample of 14 minus crushed rock that is being used as backfill for the stormwater utility. Test Reference Maximum Test Test % of Number Test Location Elevation Proctor Dry Density Moisture Dry Density MDD (pcf) (%) (pcf) 1 Stormwater Backfill SG 1 128.7 5.3 122.5 95 2 Stormwater Backfill SG 1 128.7 5.6 123.2 96 3 Stormwater Backfill SG 1 128.7 6.1 124.2 97 Report ID 9024.00 E 01032023 Page 2 of 2 1 J,. i \ I 1r11O 010 0�. IOl IQ \ 1 O1;`i I 1 a , I 1 103 ,r I '� Ow WIP Q� I do, � I � I 3 1 � 's a 40 A60 1-1�r•all I -, Y' V >ow uoalo 10 1 �Irtrraoilir 1 a1.l oA'Irq 1 r--------- o al�.l a 4 1 1 jl - — 1 ;,ssrsssrssss�;;.�sss--� 1• 1 I I MIA OM1.mm " Earth Solutions NW«C 15365 NE 9011 Street, Suite 100 FIELD REPORT NWLLC Redmond, WA 98052 6t Main (425) 449-4704 1 Fax (425) 449-4711 esnw.com Project No. 9024.00 Page 1 of 2 Report ID 9024.00 E 01052023 Date Thu 1/5/2023 Weather 590F Cloudy Arrival/Departure Time(s) 12:45PM; 1:15PM Travel Time (hr) 0.25 Project Name Echelbarger 92nd Lot Location 21322 - 92nd PI W, Edmonds ESNW Rep. & Phone Christopher Halter, (206)-602-9915 Client Info/Contact Echelbarger Homes, Inc. I Todd Echelbarger General Contractor Info/Contact Reviewed By LAC Lr— KRC Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide ourclientwith a source of professional advice, opinions, and recommendations based upon the field representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. At client's request, ESNW rep was onsite to test compaction of backfill placed over stormwater utility. Compaction of Backfill Over Stormwater Utility: While onsite ESNW rep observed contractor had backfilled the trench line between the existing storm utility and C13-1. Contractor expressed to rep that at the bottom of the trench a 12-inch corrugated PVC pipe was bedded in 5/8ths minus crushed rock. Contractor expressed that the backfill consisted of 14 minus crushed rock placed in one -foot lifts and compacted with a hoe pack. Rep took compaction tests and observed compaction of 95 percent or more at the tested locations. See table and picture below with approximate test locations. ESNW rep will return to observe earthwork activities, at the request of the client. Test Reference Maximum Test Test % of Number Test Location Elevation Proctor Dry Density Moisture Dry Density MDD (pcf) (%) (pcf) 4 Stormwater Backfill SG 1 128.7 5.1 123.9 96 5 Stormwater Backfill SG 1 128.7 6.8 124.5 97 Report ID 9024.00 E 01052023 1 I reUr Al" r/ur eL.eO *~ aim d C0Ie01 iLW'relw am, � Teri nr. ris �y. 1 I`i D 0R 1/ / /1 �i rr i MI 'I �1. ■ 1r0ebe' r greJ�, w MIA 00C lot Page 2 of 2