ENG2023-0159 ROW PERMITRIGHT OF WAY EUC PERMIT
sCity •• • • •••
• • / / •'•
11tr
• • ••
Description: COMCAST-BORE SERVICE TO PRIVATE PROPERTY ISSUED: 06/16/2023
Address: 9719 CHERRY ST EDMONDS WA 98020-2337
EXPIRES: 12/16/2023
Permit Type: RIGHT OF WAY LUC Permit Subtype: STANDARD Parcel Number: 27031300408500
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT VINICIUS FREITAS 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
CONTACT INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
CONTRACTOR INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
OWNER DARREN K JACOBSEN 9719 CHERRY ST, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00
ENG - INSPECTIONS $252.00 $252.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 06/16/2023
Printed: Friday, June 16, 2023 1:21:13 PM 1 of 2
01 1 I),,r�
v J.
CONDITIONS
CONDITION TYPE
NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE RESULT NOTES
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 RESTOR LIMITS
Printed: Friday, June 16, 2023 1:21:13 PM 2 of 2
RECEIVED
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E6�.
May 09 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General•
Project Name 982862 - 9719 CHERRY ST
Site Address or if no site address use Property Address at NW corner of project area: 9719 CHERRY ST
Associated Permits: BLD PLN ENG
Owner and Entity Holdingapplicable)
Name of Company COMCAST Franchise Ordinance No:
Point of Contact JESSAMIN SANTOS
Title COORDINATOR 2
Address 410 VALLEY AVE
City PUYALLUP State WA Zip 98371
Phone 206-401-2188
Email JESSAMIN_SANTOS@CABLE.COMCAST
Contractor and Authorized Agent of • •te below)
Name of Company INFRAWEST INC
Contractor ContactsDuring Construction
Primary Name VINICIUS FREITAS
Agent Name VINICIUS FREITAS
'Title
Title
Mobile (425) 949-9293
Address 11335 NE 122ND WAY ste 105
Email VINNY.FREITAS@INFRAWEST.NET
City KIRKLAND State WA Zip 98034
Secondary Name
Phone (425) 949-9293
'Title
Email VINNY.FREITAS@INFRAWEST.NET
Mobile
City of Edmonds Business License No:
Email
State License No: INFRAI*793NP
® Contractor verifies it is currently bonded
® Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
N Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE COMCAST
PEDESTAL, BORE 5' OF SOFT SURFACE FROM THE COMCAST PEDESTAL TO THE ROAD. BORE 25'
UNDER THE ROAD CHERRY ST, BORE 12' UNDER THE DRIVEWAY OF PROPERTY 9723, BORE Y OF
SOFT SURFACE FROM THE DRIVEWAY TO THE HOUSE 9723 TO WHERE THE NEW COMCAST
HANDHOLE WILL BE INSTALLED. HAND HOLE MEASURING 11 INCHES IN DIAMETER AND 12
INCHES DEEP. FROM THE COMCAST HANDHOLE WILL CONTINUE TO BORE IN PRIVATE
PROPERTY TO THE POWER METER OF HOUSE 9719 CHERRY ST. WILL BORE WITH A DIRECTIONAL
DRILL AT A MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN A MINIMUM OF 5 FEET HORIZONTAL
AND 12 INCHES VERTICAL SEPARATION BETWEEN ALL UTILITIES. ALL DISTURBED AREAS WILL
BE RESTORED TO ORIGINAL OR BETTER CONDITIONS.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
1. The work in the right of way is on or for the following type of facilities:
m telecommunications x cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
D- • be Completed
i. ,I Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
X
2. 1 Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
X
Details
of • to be CompletedNo
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 1 1 1 How many are to be added? 1
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME
APPLICANT TITLE:
VINICIUS FREITAS
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
03/24/2023
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SITE PLAN 982862 - 9719 CHERRY ST, EDMONDS
RECEIVED
May 09 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE COMCAST
PEDESTAL, BORE 5' OF SOFT SURFACE FROM THE COMCAST PEDESTAL TO THE ROAD. BORE
25' UNDER THE ROAD CHERRY ST, BORE 12' UNDER THE DRIVEWAY OF PROPERTY 9723, BORE
3' OF SOFT SURFACE FROM THE DRIVEWAY TO THE HOUSE 9723 TO WHERE THE NEW
COMCAST HANDHOLE WILL BE INSTALLED. HAND HOLE MEASURING 11 INCHES IN DIAMETER
AND 12 INCHES DEEP. FROM THE COMCAST HANDHOLE WILL CONTINUE TO BORE IN PRIVATE
PROPERTY TO THE POWER METER OF HOUSE 9719 CHERRY ST. WILL BORE WITH A
DIRECTIONAL DRILL ATA MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN A MINIMUM OF 5 FEET
HORIZONTAL AND 12 INCHES VERTICAL SEPARATION BETWEEN ALL UTILITIES. ALL DISTURBED
AREAS WILL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
PAGE1 OF 2 per city standards that is caused or
occurs during the permitted project.
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
SPECTRA
Boa _ iiYti>
982862 9719 cherry st
CREW NAME
FRErtAS
LS va
1155 No
STH 1CA01
anon
now
ow DM
Meow
Z10 DFUv
sw Dow
POW
mom
Edmonds
LOCALE 1 / CLEAR DATE
=,11 I REPAS tBe71
nTAfW
166'
45' D 1
3T
31'SS
25' -
v0s
Legend
■ Comcast pedestal
QComcast HandHole
® Electric Meter of House
® Utility Pole
Proposed Path
SS = Soft Surface
DW = Driveway Bore
SW = Sidewalk Bore
RD = Road Bore
15 DW '
4
ILI
i 85,SS it 1. it'll
- -dilwr
� tom►
It'srob
.
• f
k
ft
COMCAST
Water Main Gas Main
PM
.,.Pothole
EXISTING UTILITIES PLAN
PAGE 2OF2
Ak Sewer Main
Storm Water
RECEIVED
May 09 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
r
.Ziply Fiber Vault Ziply Fiber
RECEIVED
May 09 2023
Figure 6H-11. Lane Closure on Two -Lane Road CITY OFEDMONDS
SERwith Low Traffic Volumes DEVELOPMENDEPARTMMENTENT CES
OV3HV�T �END
MOM t
� � ROAD WORK
OV08
C (optional)
1 T
B
OV3HV — —
OVOa
3NVl 3NO 10 30 m (100 ft) MAX.
BE PREPARED Buffer Space (optional)
TO STOP +
FLAGGER AHEAD
1
FLAGGER AHEAD
o �
Buffer Space (optionalk
30 m (100 ft) MAX.
i =4.6m(15ft)
TO
ONC G
F A � T FI
(optional) v BE PREPARED
(See Section 36.16) � TO STOP
B
j ONE LANE
1 ROAD
AHEAD
(optional) C
MOM NOV08
ON]
T & ENGINEERING DIVISION
....,OTED
�(I (j�2',�i 16/13/2022
OWNER/CONTRACTOR IS RESPONSIBLE FOR
Applicant shall repair/replace all EROSION CONTROL AND DRAINAGE ROAD
damage to utilities or frontage
improvements in City right-of-way WORK
per city standards that is caused or OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
occurs during the permitted project. ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY AHEAD
UTILITIES MAY REQUIRE A SEPERATE PERMIT.