BLD2023-0601_Applicant_Response_6.29.2023_8.02.09_AM_3638921NORTHWEST ENGINEERING GROUP Mr. Steve Abdo June 28, 2023 22022 92nd Ave W Edmonds. WA Re: Foundation Inspection Permit Number: CRA2023-0092 22022 921d Ave W Edmonds, WA Dear Mr. Abdo. A final pile inspection was performed by Northwest Engineering Group. The purpose of the pile inspection was to verify the foundation underpinning work recommended in the Foundation & Elevation Assessment Plan on May 16, 2023 had been performed. The underpinning work was completed by Ram Jack West on June 16, 2022. Northwest Engineering Group reviewed the drive log and project information provided by Ram Jack West. A total of eight (8) 2 7/8" helical piles were installed. Due To obstructions encountered in the field, Pile 03 was shifted from its location shown on the Foundation and Elevation Assessment Plan. Refer to the attached As -Built Plan (SK-1 R) for pile location. This change was approved by engineering. Based on the pile installation log provided, the pile embedment depths ranged from 7 to 10 feet. The reported minimum installation torque was 7,245 ft-lb. Based on this torque and a factor of safety of 2.5, the allowable capacity is 26.0 kips, which exceeds the 12.0 kips required. The underpinning piles appear to have been properly installed in accordance with a method typical of the industry. In addition, the piles are laterally braced in accordance with section 1810.2.2 of the 2018 IBC and compliant with section 1810.2.1. This concludes this report. Observations made in this report pertain to the condition of the residence on the date of the inspection which is subject to change. No foundation warranty is expressed or implied by this report other than the warranty provided by the foundation repair contractor. If we can be of further assistance or should you have any questions about this report, please do not hesitate to contact us. Sincerely, r d' Y01r,, Atv Andrew Van Meter, E.I.T. Engineering Technician OPT OF WA o�J` 0 5748V3 ERE \� FSS NA\_ Darin Willis, P.E. Managing Principal P.O. Box 10393/ Eugene, OR, 97440 / 541.393.7363 / WWW.NWENGGROUP.COM ADDITION (PIER & BEAM) WINDOW (TYP) — CHIPPED FOUNDATION --------- I /s" GRADE I BEAM CRACK LIVING AREA I W / 2ND STORY 8 I (SLAB -ON -GRADE) WOODEN FENCE I o -/4" LIVING AREA & BEAM) I (PIER 7 /" GRADE 001, �/„ I BEAM CRACK 0" 06 2-CAR GARAGE W / 2ND STORY I (SLAB -ON -GRADE) „ ®5 � =3 y6" GRADE ENTRY ® o BEAM CRACK 2-CAR GARAGE PONDING EXTENT OF (SLAB -ON -GRADE) 4 WATER (TYP) 2ND STORY -3" 2 y4„ -6 y2" � 03 -' BRICK FACADE (TYP) ®01 ®02 `- 10'-0" �N L. Wl, WASy7No% n F y 57483 T GISE \� FSS A', 1'-0 OBSTRUCTION (E) TREE STUMP AS -BUILT PLAN LEGEND NORTH SLAB ELEVATIONS TAKEN BY NW ENG GROUP ON 05/03/2023 ® - - - - HELICAL STEEL PILE (12.0 KIP CAPACITY) a - - - - HELICAL STEEL PILE THROUGH ASPHALT / CONCRETE (12.0 KIP CAPACITY) - - - - L6x6x3/8" x 3'-0" STEEL ANGLE - - - - L6x6x3/4" x 4'-0" STEEL ANGLE ."""""""""" - - - - C7x11.5 x 10'-0" STEEL CHANNEL (INSTALLED ON EXTERIOR)