Loading...
ENG2023-0273 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds - N, Edmonds WA 98020 ENG2023-0273 www.edmondswa.govi Description: COMCAST - PULL THROUGH EX CONDUIT ON 236TH ISSUED: 06/29/2023 Address: 23632 HIGHWAY 99 EDMONDS WA 98026-9211 EXPIRES: 12/29/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00451900100401 NAME TYPE NAME ADDRESS PHONE APPLICANT JESSAMIN SANTOS 410 VALLEY AVE NW, PUYALLUP WA 98371 (206)401-2188 CONTACT COMCAST CABLE COMMUNICATIONS 410 VALLEY AVE NW, PUYALLUP WA 98371 (206)401-2188 MANAGEMENT, LLC CONTRACTOR CABLECOM LLC 19910 NORTHCREEK PARKWAY N, BOTHHELL WA 98011 (363)608-6700 OWNER FW WA -AURORA MARKETPLACE LLC j PO BOX 2539, SAN ANTONIO TX 78299 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $126.00 $126.00 RIGHT-OF-WAY PERMIT - MINOR $126.00 $126.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 06/29/2023 Printed: Thursday, June 29, 2023 10:47:13 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** Printed: Thursday, June 29, 2023 10:47:13 AM 2 of 2 RECEIVED of EpM04O� SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right-of-Wgy permit Handout E6�. Jun 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General • Project Name JB-1345716 Site Address or if no site address use Property Address at NW corner of project area: 23632 HIGHWAY 99, EDMONDS ,WA 98026 Associated Permits: BLD PLN ENG Owner and Entity Holding Name of Company Comcast Cable Communications Management, LLC. Franchise Ordinance No: Point of Contact Jessamin Santos Title Permit Coordinator Address 410 Valley Ave NW City Puyallup State WA Zip 98371 Phone (2o6) 401-2188 Email jessamin_santos@cable.comcast.com Contractor and Authorized Agent of Owner Name of Company Cablecomm, LLC (see note below) Contractor Contacts During Construction Primary Name CHRIS ATKINSON Agent Name Leah Ihlenfeldt Title Construction Supervior Title Permit Coordinator Mobile 36o-926-3437 Address 1316 BONNEVILLE AVE ,BLDG A, Email CHRIS.ATKINSON@CABLECOMLLC.NET City Snohomish State wA Zip 98�90 Secondary Name Phone (36o) 668-1300 Title Email leah.ihlenfeldt@cablecomllc.net Mobile City of Edmonds Business License No: NR-o21818 Email State License No: CABLE-971DP ® Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) X Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Comcast JB 1345716 The proposed work in the ROW is to lash new 12ct fiber from existing aerial fiber splice case for to riser pole (along south side of 236th St SW); proof existing Comcast buried conduit and pull new 12ct fiber 497' to existing doghouse and continuing in ROW to address 23632 HIGHWAY 99 EDMONDS WA 98026. No disturbance of surface. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF NA Alley 72 hours + LF x LF SF NA Parking 72 hours + LF x LF SF NA SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications X cable (fiber) ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes X No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility stem? If es: X Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? X Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the X project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 1-2 1How many are to be added? 1 City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? 2 What is the height of the existing Poles? 45-50 How many poles are to be removed? o Are additional poles to be laced? no How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsibleforall permit fees. APPLICANT SIGNATURE: Je SaW(n , Saht0S APPLICANT PRINTED NAME: Jessamin Santos APPLICANT TITLE: Permit Coordinator NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 6/6/2023 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 RECEIVED Jun 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Job JB0001345716(Aurora Marketplace Biz Zone - 23632 HIGHWAY 99, STE A, EDMONDS WA 98026) NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS / FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. SHOW ENTIRE ROUTE FROM TIE IN TO CUSTOMER LOCATION Legend Provide Clear Construction Details 1- POINT AT I E- IN SP0009.WALY: Overl ash new fiber to existing Comcast strand Existing Doghouse ❑ 2- Proof and pull new fiber through existing Comcast Underground conduits. 3- Build new conduit on exterior wall of building and pull through new fiber. New Vault ❑V 4- Pull through new fiber to customer's server room. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE ENGINEERING DIVISION Existing U/G Applicant shall repair/replace all " """"' 'r" "" "'7TED damage to utilities orfro-of -w OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING improvements in City right ay p(I�j2 16/27/202� Existing Aerial per city standards that is caused or ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY occurs during the permitted project. UTILITIES MAY REQUIRE A SEPERATE PERMIT. New U/G New Aerial _____ _ 236 } `h `-C } ' ` SW -- Interior Path _---- - 241' ; 4- Pull through new fiber 256' ���,^� • to customer's server room. Exterior Building Path A Footage Break 000, - Fiber Splice Point V,. - _ { 40' Storage Loop 1- POINTATIE-IN '� 2- Proof and pull new fiber /Y1 SP0009.WALY through existing Comcast �- WUnderground conduits. Riser' O Pole Lock Box Footage Text Box Text 3- Build new conduit on Callout Arrow exterior wall of building Ir -7-1 and pull through new 6+� fiber. New Tap Phase Identifier 0 10 Power SuppY hit — ,�•oti ' ' - <. Ps Hard Surface Cut Abandoned Cable Al A116- �� RECEIVED Jun 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Right of Way Completed By: OSCAR PALUCHA Address: 23632 HIGHWAY 99 STE A EDMONDS WA 98026 Completion Date: 1/25/2023 Right of Way Footages: C O M C A S T Job Type: Metro E Retail New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 497 New Aerial Fiber: 0 Overlash Fiber: 150 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 Are Additional Pages Needed: No Job Subtype: Fiber Survey Scope: Post -Sale Project Manager: P2 ID: JB0001345716 *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS / FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. SHOW ENTIRE ROUTE FROM TIE IN TO CUSTOMER LOCATION Legend Provide Clear Construction Details 1- POINT A TIE-IN SP0009.WALY: Overlash new fiber to existing Comcast strand Existing Doghouse ❑ 2- Proof and pull new fiber through existing Comcast Underground conduits. 3- Build new conduit on exterior wall of building and pull through new fiber. 4- Pull through new fiber to customer's server room. New Vault Existing U/G 1- POINT ATIE-IN Existing Aerial SP0009.WALY - - 2- Proof and pull new fiber '- through existing Comcast NewU/G ___ f.. Underground conduits. / New Aerial _____ i '` Interior Path Exterior Building Path Footage Break - — 4 Fiber Splice Point Storage Loop Riser Pole Lock Box ��� .•'y ,, . Footage Text Box Callout Arrow Text New Tap Phase Identifier - Power Suppy i Hard Surface Cut PS j - - c O Abandoned Cable f4 2- Proof and pull new fiber through existing Comcast Underground conduits. RECEIVED Jun 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Private Exterior Completed By: OSCAR PALUCHA Address: 23632 HIGHWAY 99 STE A EDMONDS WA 98026 Completion Date: 1/25/2023 Private Exterior Footages: C O M C A S T Job Type: Metro E Retail New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 128 New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 Are Additional Pages Needed: No Job Subtype: Fiber Survey Scope: Post -Sale Project Manager: P2 ID: JB0001345716 *IMPORTANT CONSIDERATIONS FOR PRIVATE EXTERIOR COMPLETION* NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS. ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS / FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. Legend Provide Clear Construction Details 1- POINT TIE-IN SP0009.WALY: Overlash new fiber to existing Comcast strand Existing Doghouse 2- Proof and pull new fiber through existing Comcast Underground conduits. 3- Build new conduit on exterior wall of building and pull through new fiber. 4- Pull through new fiber to customer's server room. New Vault ❑� Existing U/G Existing Aerial New U/G New Aerial Interior Path- Exterior Building Path __ I Footage Break f------ Fiber Splice Point � + _ � - �_ , � : -• .:. - Storage Loop 3- Build new conduit on 3- Build new conduit on 1 Riser �• .. exterior wall of building and pull through new 1 exterior wall of building l 1 and pull through new r ® fiber. fiber. Pole ) Lock Box • Footage Text Box 150' Callout Arrow Text— New Tap Phase Identifier f 0 Power Suppy 7 Hard Surface Cut • 3- Build Abandoned Cable new conduit on exterior wall of building —� and pull through new fiber. MAINTAIN TWO 11' TRAVEL LANES, OTHERWISE FLAGGERS REQUIRED. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. N b SEE NOTE 1 ROAD WORK AHEAD W20-1 ROAD NARROWS W5-1 SEE NOTE 1 ROLL SPACING (MIN 50' MAX 100') WORK AREA *Spotter to assist pedestrians through work zone TRUCK WITH BUFFER SPACE DOWNSTREAM TAPER FLASHING (SEE TABLE A) BEACON (SEE TABLE A) o O 0 0 O D D t %� �* t D �* D * D* C 000�� �°°o 000000000000000� OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE TAPER LENGTH (SEE TABLE A) TABLE A SPEED (MPH) TAPER LENGTH FOR SHIFT WIDTH CONE SPACING (FT) BUFFER SPACING 5' 6' TANGENT TAPER (FT) 25 26' 31' 25 20 55 30 38' 45' 30 85 35 51' 61' 35 120 40 67' 80' 40 170 45 113' 135' 45 220 WITH TAPER LENGTH (SEE TABLE A) *Contractor to post no parking signs for road side parking along 236th St SW north of address 23632 Hwy 99 / site location M PARKING AFTER I TOW -AWAY AREA OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. W1-4L SEE SEE NOTE 1 NOTE 1 ENGINEERING DIVISION ...,DTED �J (j�2v 16/27/2023 W20-1 ROAD WORK AHEAD 236th ST SW LEGEND CONE OR CHANNELIZING DEVICE SEE STANDARD DRAWING 713. NOTES 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR RESIDENTIAL STREET (25 MPH) AND 350' FOR ARTERIAL ROADWAYS. 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR NIGHT-TIME USE (OPTIONAL). 3. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. 4. SPOTTERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). 5. FOR ALTERNATE LANE SHIFT WIDTH REFER TO "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) TABLE 6C-2 PAGE 6C-10. RECEIVED 6. SIGN SIZE PER MUTCD. Jun 08 2023 7. THIS PLAN IS PROVIDED AS A GUIDE ONLY. FOR SPECIFIC CITY OFEDMONDS DEVELOPMENT SERVICES INFORMATION ON THE TRAFFIC CONTROL PLANS SEE DEPARTMENT CURRENT MUTCD.