Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED Parcel No: 00596000000800 Subdivision: 005960, 004346 Fire Sprinklers: Valuation: $7,406.00 Code Edition: 0 Site Address: 18303 84TH PL W EDMONDS,WA 98026-5335 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MAJERUS-POOL, DECKS, RET WALL, FENCE, PERGOLA, PATIO, PLANTS Applied: 1/20/2023 Issued:6/29/2023 Final: Expiration Date: 6/23/2024 Issued by: BAC I WA State Contractor L & I #: TRUESSL887PD I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DA ZHANG 6410 PHINNEY AVE N, SEATTLE (206)319-5066 DA@TRUESCAPEDESIGN.COM WA 98103 CONTACT TRUE SCAPE DESIGN 6410 PHINNEY AVE N, SEATTLE (206)319-5066 da@truescapedesign.com WA 98103 6410 Phinney Ave N., SEATTLE CONTRACTOR TRUE SCAPES LLC (206)701-7714 joe@truescapedesign.com WA 98103 MATTHEW E & MORGAN S 18303 84TH PL W, EDMONDS OWNER MAJERUS WA 98026 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/31/23 R26008 PER PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $252.00 $252.00 6/29/23 R29638 FENCE - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $35.00 $35.00 6/29/23 R29638 FENCE - SUB RES ENG INSP FEE 001.000.345.83.400.00 $35.00 $35.00 6/29/23 R29638 FENCE - SUB RES ENG REVIEW FEE 001.000.345.83.400.00 $30.00 $30.00 6/29/23 R29638 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $259.00 $259.00 6/29/23 R29638 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $220.15 $220.15 1/31/23 R26008 POOL ABOVE GROUND - SUB BLDG 001.000.345.83.000.00 $30.00 $30.00 6/29/23 R29638 INSP FEE POOL ABOVE GROUND - SUB BLDG 001.000.345.83.000.00 $30.00 $30.00 6/29/23 R29638 PLAN REVIEW FEE POOL ABOVE GROUND - SUB ENG 001.000.345.83.400.00 $30.00 $30.00 6/29/23 R29638 INSP FEE POOL ABOVE GROUND - SUB ENG 001.000.345.83.400.00 $30.00 $30.00 6/29/23 R29638 REVIEW FEE RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 6/29/23 R29638 RETAINING WALL - SUB RES BLDG 001.000.322.10.000.00 $100.00 $100.00 6/29/23 R29638 PERMIT FEE RETAINING WALL - SUB RES BLDG 001.000.345.83.000.00 $50.00 $50.00 6/29/23 R29638 PLAN REVIEW FEE Printed: Thursday, June 29, 2023 2:50:38 PM 1 of 3 i!6 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # RETAINING WALL - SUB RES ENG 001.000.345.83.400.00 $100.00 $100.00 6/29/23 R29638 INSP FEE RETAINING WALL - SUB RES ENG 001.000.345.83.400.00 $50.00 $50.00 6/29/23 R29638 REVIEW FEE TOTALS: $1,297.65 $1,297.65 CONDITIONS CONDITION TYPE STATUS NOTES 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Printed: Thursday, June 29, 2023 2:50:38 PM 2 of 3 BLDG Permit PERMIT NUM City of Edmonds LwRESIDENTIAL www.edmondswa.gov - INSPECTIONS• •. INSPECTOR COMPLETED RESULT NOTES AdINSPECTIONTYPE A-1 BUILDING PRECON B-1 SETBACKS B-2 RETAINING WALL B-3 GAS PIPING TEST X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL NOTE TO INSPECTOR: VERIFY THAT SEWER CLEANOUT IS ACCESSIBLE AND THERE IS AN AVB/HOSE WITHIN 30 FEET OF THE POOL. Printed: Thursday, June 29, 2023 2:50:38 PM 3 of 3