Building PermitType: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 00835864102500 Site Address: 21109 77TH PL W 25 EDMONDS,WA 98026-7155
Subdivision: 006143, 005958, 008358, 006712, 007206 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MECHANICAL -HEAT PUMP AND AIR HANDLER
Applied: 7/3/2023
Issued:7/11/2023
Final:
Expiration Date:1/7/2024
Issued by: BAC
I WA State Contractor L & I #: SEATOEH821DG I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BEKAH SWANSON
4200 78TH ST SW, MUKILTEO
(425)270-1623
PERMITS@SEATOWNSERVICES.COM
WA 98275
CONTACT
SEATOWN ELECTRIC
4200 78TH ST SW, MUKILTEO
(425)270-1623
PERMITS@seatownservices.com
PLUMBING HEATING
AND AIR
WA 98275
CONTRACTOR
SEATOWN ELECTRIC CORP.
4200 78TH ST SW, MUKILTEO
(206)905-4946
PERMITS@SEATOWNSERVICES.COM
WA 98275
STACEE L ROBINSON-ARBOR
21109 77TH PL W 25, EDMONDS
OWNER
LANE TOWNHOMES
WA 98026
•' ' •
DESCRIPTION
7ACR
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
HEAT PU MP - 1.75 BTU OR
001.000.345.83.000.00 00.00$57.00
$57.00
7/5/23
R29736
LESS
AIR HANDLERS - 10000 CFM OR
001.000.345.83.000.00
$34.00
$34.00
7/5/23
R29736
LESS
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
7/5/23
R29736
PERMIT
COMMERCIAL MECHANICAL PLAN
001.000.345.83.000.00
$126.00
$126.00
7/11/23
R29869
REVIEW
MECHANICAL BASE PERMIT FEE
001.000.322.10.000.00
$57.00
$57.00
7/5/23
R29736
TOTALS: $319.00
$319.00
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, July 11, 2023 10:33:09 AM 1 of 2
MECHANICAL
City of • • • PERMIT NUM -
�...Edmonds'
: 1 1 i i •
www.edmondswa.gov1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
INSPECTIONS - Schedule Online at https:Hinspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
B-3 MECH ROUGH IN
X-0 MECH FINAL"
Printed: Tuesday, July 11, 2023 10:33:09 AM 2 of 2