Loading...
Building PermitType: RE ROOF Subtype: COMMERCIAL RR I Status: ISSUED Parcel No: 01022607130300 Site Address: 71 PINE ST 303 EDMONDS,WA 98020 Subdivision: 010226, 005362, BLA AFN 200202145001, SP S-98-018 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $1,538.70 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PENHOLLOW-RE ROOF DECK SURFACE Applied: 7/17/2023 Issued:7/18/2023 Final: Expiration Date: 1/14/2024 Issued by: BAC I WA State Contractor L & I #: MCLEOCL951DD I ad CONTACTS m NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ALEJANDRO DINGLER 6515 202ND ST SW, LYNNWOOD (206)510-3664 ALE@MCLEODCONSTRUCTION.COM WA 98036 CONTACT MCLEOD CONSTRUCTION 6515 202ND ST SW 202ND ST (206)510-3664 ale@mcleodconstruction.com SW, LYNNWOOD WA 98036 CONTRACTOR MCLEOD CONSTRUCTION LLC 1115 N 140TH ST, SEATTLE WA (206)510-9664 ALE@MCLEODCONSTRUCTION.COM 98133 JAMES D & LYNNE R 71 PINE ST 303, EDMONDS WA OWNER PENHOLLOW-POINT 98020 EDWARDS CONDOMINIUMS FEE •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 7/18/23 R30044 PERMIT RE -ROOF - COM VALUATION - FEE 001.000.345.83.000.00 $175.60 $175.60 7/18/23 R30044 STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 7/18/23 R30044 - COM TOTALS: $245.60 $245.60 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, July 18, 2023 2:45:57 PM 1 of 2 RE ROOF Permit City of • • • - 89 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Structural repair is not included in the scope for this permit. If it is found that structural STRUCTURAL REPAIR NOT FOR repairs are needed a separate permit must be submitted to the city for approval, and INCLUDED INFORMATION plans must be stamped and signed by the engineer of record. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-5 TEAR OFF OR SHEATHING X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Tuesday, July 18, 2023 2:45:57 PM 2 of 2