ENG2023-0170 ROW PERMITOF WAY PERMIT PERMIT ER City •EdmondsRIGHT Edmonds:i20 ENG2023-0170 www.edmondswa.gov i Description: ROW -BP SITE SOIL BORINGS AND MONITORING WELL INSTALL ISSUED: 07/19/2023 Address: 202 5TH AVE S EDMONDS WA 98020-3425 EXPIRES: 01/19/2024 Permit Type: RIGHTOFWAY Permit Subtype: COMMERCIAL Parcel Number: 27032300407700 NAME TYPE NAME ADDRESS PHONE APPLICANT MARTA PENTZKE 1687 114TH AVE SE STE 100, BELLEVUE WA 98004 (425)289-7375 CONTACT STANTEC 1687 114TH AVE SE STE 100, BELLEVUE WA 98004 (425)289-7375 CONTRACTOR CONTRACTOR UNKNOWN OWNER SOUND CREDIT UNION PO BOX 1595, TACOMA WA 98401 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $504.00 $504.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: GRN DATE: 07/19/2023 Printed: Wednesday, July 19, 2023 2:02:36 PM 1 of 2 RIGHT OF WAY PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE X-2 ENGINEERING FINAL** A-1 TESC AND MOBILIZE E-7 CONCRETE SIDEWALK E-7 CURB GUTTER E-7 RESTOR LIMITS E-7 TRAFFIC CTRL Printed: Wednesday, July 19, 2023 2:02:36 PM 2 of 2 RECEIVED MAR 29 2023 RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General• Project Name BP Site 9io Soil Boring Advancement and Well Installation -2023 Site Address or if no site address use Property Address at NW corner of project area: 202 5th Avenue, Edmonds, WA 98020 Associated Permits: BLD PLN ENG X Owner and Entity Holding.• - Name of Company BP Pro ucts NortAmerica, Inc Franchise Ordinance No: S2102 Point of Contact Wade Melton Title Operations Project Manager - Remediation Management Services Company Address 4 Centerpointe Drive, Suite 200 City La Palma State CA Zip 90623 Phone 36o-594-7978 Email wade.melton@bp.com Contractor and Authorized Agent of Owner (see note below) Name of Company BP products North America, Inc Contractor Contacts During Construction Primary Name Andrea Schweiter Agent Name Wade Melton Title Project Manager Title Operations Project Manager - Remediation Management Services Company Mobile (425) 53i-8948 Address 4 Centerpointe Drive, Suite 200 Email andrea.schweiter@stantec.com City La Palma State CA Zip 90623 Secondary Name Greg McCormick Phone 360-594-7978 Title Senior Geologist Email wade.melton@bp.com Mobile (425) 922-6392 City of Edmonds Business License No: 602-529-295 Email greg.mccormick@stantec.com State License No: 602-529-295 lI Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance NU1h: 1 CDC 18.60.020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) This project will entail: -Drilling and installing one flush -mount groundwater monitoring well within the property line along Dayton Street. - Drilling two soil borings that will be backfilled immediately after collection of soil samples in the sidewalk along 5th Avenue South.The well and soil borings will be drilled to an approximate depth of 15 feet. Closure of the sidewalks will be required during installation of the well and soil borings drilling. Sidewalk closure is not expected to be more than 72 hours.The installation of the well will take approximately four hours. The proposed activities are not expected to disrupt the asphalt, however, the sidewalk will be restored to City standards. The frequency of groundwater sampling will depend on the results, but will likely be quarterly. The groundwater monitoring well is estimated to be active for approximately 5 years, but the actual duration will depend on the sample results and regulatory agency requirements. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + 120 LF JxJ is LF 2,16o SF <1 Alley 72 hours + N/A LF x N/A LF N/A SF Parking 72 hours + NA LF I x LF N/A SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: I__ DATE: .9/?81202g APPLICANT PRINTED NAME: Marta Pentzke APPLICANT TITLE: Environmental Engineer EIT NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 O, ti J, N t - COMMERCIAL MONITORING WELL ONLY PERMITTED ON PRIVATE _ PROPERTY, NOT IN ROW ill DAYTON STREET • + r RESIDENTIAL j COMMERCIAL RESIDENTIAL COMj,MERCIA/ ' T I W W W LLI RESIDENTIAL Z a COMMERCIAL a SITE LOCATION N .• W J RESIDENTIAL = COMMERCIAL _ a ' (WITH UNDERGROUND PARKING) RESIDENTIAL y t RESIDENTIAL Sta _ - - INDUSTRIAL (WAREHOUSES) 1687 114th Ave SE Bellevue, WA PHONE:(425) 289-7300 .10 LEGEND: — — PROPERTY LINE OProposed Well Location OProposed Boring for Soil Sampling Applicant shall repair/replace all damage to utilities or frontage C/G & SIDEWALK FORM INSPECTIONS REQUIRED improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY y UTILITIES MAY REQUIRE A SEPERATE PERMIT. I J 1 COMMERCIAL`P •' ENGINEERING DIVISION ...,7TED • 1 _ p� I 14/20/2023 J SIDEWALK SHALL BE RESTORED PER CITY STANDARDS SCHEDULE RESTORATION INSPECTION. RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR w N RECEIVED MAR 29 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 0 40 W APPROXIMATE SCALE (FEET) FILEPATH:E:\(V) WORKGROUP\BP 46 Site Progression\0910 Edmonds\Stantec_Site-Plan.dwgljliebermanlAug 07, 2020 at 10:561Layout: 2 TRAFFIC MANAGEMENT I N C O R P O R A T E D GENERAL NOTES -TRAFFIC CONTROL It is the responsibility of the contractor performing work to install and maintain the traffic control devices as shown herein, as well as any such additional traffic control devices as may be required to ensure the safe movement of vehicular and pedestrian traffic through or around the closure area and provide maximum protection and safety to workers. All traffic control devices shall be kept in their proper position at all times and shall be repaired, replaced, or cleaned as necessary to preserve their appearance, continuity and capability. All traffic control devices shall conform to the latest accepted edition of the Manual on Uniform Traffic Control Devices ( M.U.T.C.D.). Any revisions to these drawings shall be approved in writing by the Engineer of Record and the Agency having jurisdiction. The Agency Traffic Engineering Division reserves the right to observe the traffic control operations and to make any necessary changes. Any directed changes shall supersede these plans and shall be implemented at the sole expense of the contractor. Contractor shall provide flagmen as necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered. Contractor shall remove temporary traffic delineation, signage, and other devices when no longer required, and shall restore areas to original conditions. Contractor shall cover existing signs where they conflict with construction detours and signing. All open excavation or construction work shall be a minimum of 5' from any operating traffic lanes. Contractor shall post uneven pavement signs, and ramp vertical pavement offset of 1 inch or more with asphalt for smooth transition. The contractor shall provide for access to all adjacent properties during work hours. Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners/operators. All signs shall be reflectorized and standard size. The contractor shall provide for safe pedestrian access at all times. MINIMUM LANE CLOSURE TAPER LENGTH = L (FEET) LANE POSTED SPEED LIMIT (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 10 105 150 205 270 450 500 550 - - - 11 115 165 225 295 495 550 605 660 - 12 125 180 245 320 540 600 660 720 780 840 LEGEND ® - WORK AREA FLAGGER FLASHING ARROW 51GN (FA5) P.o UNIFORMED POLICE OFFICER d EXI5TING 51ON BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65L733O LENGTH (feet) 155 200 250 305 360 425 495 570 645 TANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. > 22,000 lbs. < 45 45-55 > 55 < 45 45-55 > 55 MPH MPH MPH MPH MPH MPH 100' 123' 172' 74' 100' 150' I TYPE -III BARRICADE W/ 51GN X TYPE -II BARRICADE W/ SIGN ]I ADA BARRICADE W/ SIGN • CHANNEUZATION DEVICE 51GN STANTEC CONSULTING SERVICES INC. SIGN SPACING = X (1) FREEWAYS & 55/70 MPH 1500' +/- EXPRESSWAYS RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN 35/40 MPH 350' +/- ARTERIALS RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200' +/- (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ADDRESS 202 5TH AVENUE SOUTH EDMONDS, WA MINIMUM SHOULDER TAPER LENGTH = L/3 (FEET) SHOULDER WIDTH (feet) POSTED SPEED LIMIT (MPH) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 200 220 240 WORK AREA TRAFFIC CONTROL: BP 51TE 00910 CONTACT: ALEX F15CHL CONTACT: (925) 627-4627 JOB NUMBER: 525966 PLAN#: 67759 PERMIT NUMBER: COVER SHEET SIZE: B 5CALE: N.T.5. DATE: 11/11/2021 PREPARED BY: EL TRAFFIC MANAGEMENT, INC. California - Great Lakes - Pacific Northwest 800.763.3999 www.trafficmanagement.com TMIIN Traffic Control Services - Sales & Rentals Permits & Consulting - Engineering - Training C31 # 785804 TMI CONTACT PERSON: Valeriy Kotyay TCS CERT #: 008319 FHA5E: 1 W20-1 R9-1 1(L) SIDEWALK CLOSED AHEAD ROAD &T WORK CROSS AHEAD 100' TO BE PLACED AT 4TH AVE 5 f NT5 DAYTON 5T [ 25 MFH I tiX F L W20-1 L1OO'NTS--­I R9-9 SIDEWALK ROAD CLOSED WORK AHEAD FOT5 TE M F "NO PARKING" FER JOB SCHEDULE Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. 139-1 1 a(R) SIDEWALK CLOSED ­:> 00 CROSS HERE 0) LEGEND ® WORK AREA FLAGGER FLASHING ARROW 51GN (FA5) P.o UNIFORMED POLICE OFFICER d EXI5TING 51GN TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP W20-1 LLI < ROAD = N WORK AHEAD 100' NT5—{ W20-1 100<AH>EAD NT5 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Ti TYPE -III BARRICADE W/ 51GN X TYPE -II BARRICADE W/ 51GN �I ADA BARRICADE W/ 51GN • CHANNELIZATION DEVICE - 51GN ADDRESS SIDEWALK CLOSURE THAT EXCEEDS 72 HOURS SHALL INCUR DISRUPTION FEES. CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 202 5TH AVENUE 50 U TH EDMOND5, WA ENGINEERING DIVISION ...'7TED l (5wv 14/20/2022 f HASE: 2 W20-1 ROAD WORK �T AHEAD 100' NT5 DAYTON 5T [ 25 MFH ] I 100' NT5 W20-1 139-1 1 a(L) SIDEWALK CLOSED ROAD CROSS E WORK o AHEAD o� LLJ R9-9 m m SIDEWALK 0i CLOSED R9-1 1 (R) SIDEWALK CLOSED AHEAD CROSS TO BE PLACED AT MAPLE 5T 0' 20' 40' 80' SCALE: 1 " = 40' W20-1 ROAD WORK AHEAD 100' NT5—{ N LI 12' MIN = W20-1 ROAD WORK 100' AHEAD N�5 WORK AREA TRAFFIC CONTKOL: BF SITE 00910 CONTACT: ALEX FISCHL CONTACT: 925 627-4627 JOB NUMBER: 325966 FLAN#: 67759 FEKMIT NUMBER: SHEET 1 OF 1 5IZE:5 SCALE:1"=40' DATE: 11/11/2021 FREFAKED BY: EL TRAFFIC MANAGEMENT, INC. California • 6reat Lakes • Pacific Northwest 800.763.3999 www.trafficmanagement.com TMIIN Traffic Control Services - Sales & Rentals Permits & Consulting - Engineering - Training C31 # 785804