Building PermitType: COMMERCIAL BLDG Subtype: CHANGE OF USE I Status: ISSUED
Parcel No: 27042900307400 Site Address: 22511 HIGHWAY 99 108E EDMONDS,WA 98020
Subdivision: 004883, 003916, 005351 Lot: 0
Fire Sprinklers: Yes Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: B Construction Type:
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: KIDDLETON- ESTABLISHING OCC LEVELS, NO CONST.
WA State Contractor L & I #:
Applied: 6/26/2023
Issued:7/27/2023
Final:
Expiration Date: 7/21/2024
Issued by: NED
CONTACTS
A
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
15455 DALLAS PARKWAY SUITE
APPLICANT
KANAKO NISHIKAWA
600, ADDISON, TX, ADDISON TX
(469)987-0683
LICENSE@KIDDLETON.US
75001-6760
15455 DALLAS PARKWAY SUITE
CONTACT
KIDDLETON, INC.
600, ADDISON, TX, ADDISON TX
(469)987-0683
license@kiddleton.us
75001-6760
CONTRACTOR
CONTRACTOR UNKNOWN
15015 MAIN ST 203, BELLEVUE
OWNER
FRANKLIN-EDMONDS
LLC
WA 98007
=4
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BLD - PERMIT BASE FEE
001.000.322.10.000.00
$100.00
$100.00
6/28/23
R29557
CHANGE OF USE
001.000.345.83.000.00
$482.00
$482.00
6/28/23
R29557
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
6/28/23
R29557
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
6/28/23
R29557
COM
TOTALS: $652.00
$652.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, July 27, 2023 7:15:07 AM 1 of 2
•MERCIAL BLDG PermitCity
• • • • -
•:0i 1 1 •
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSPECTIONS
- Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Thursday, July 27, 2023 7:15:07 AM 2 of 2