Loading...
UPDATED OWNER Building PermitType: FIRE SPRINKLER Subtype: FIRE SPRINKLER NEW - COM I Status: ISSUED Parcel No: 00576700002614 Site Address: 8215 236TH ST SW BLDG B EDMONDS,WA 98026 Subdivision: SP S-2004-64, 005767, SP 82 (3-86), SP S-2003-190, SP S-2004-63 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $72,647.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: HOUSING HOPE- FIRE SPRINKLER- BUILDING B WA State Contractor L & I #: REDHAHF901QP Applied: 12/23/2022 Issued:7/26/2023 Final: Expiration Date: 7/20/2024 Issued by: NED • NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LAUREN MAIN 801 VALLEY AVE NW SUITE D, (253)230-4588 LAURENM@REDHAWKFP.COM PUYALLUP WA 98371 CONTACT RED HAWK FIRE PROTECTION 801 VALLEY AVE NW SUITE D, (253)840-9900 travisk@redhawkfp.com PUYALLUP WA 98371 CONTRACTOR RED HAWK FIRE PROTECTION 801 VALLEY AVE NW SUITE D, (253)840-9900 insp-permit@redhawkfp.com LLC PUYALLUP WA 98371 ELCFA / MADRONA 5830 EVERGREEN WAY, OWNER (425)322-3723 JEFFCHANDLER@HOUSINGHOPE.ORG HIGHLANDS EVERETT WA 98203 EE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/28/22 R25273 PER PERMIT FIRE SPRINKER - BASE FEE 001.000.345.83.100.00 $100.00 $100.00 7/26/23 R30209 FIRE SPRINKLER - BLDG BASE FEE 001.000.322.10.000.00 $100.00 $100.00 7/26/23 R30209 FIRE SPRINKLER - ENG REVIEW FEE 001.000.341.82.000.00 $100.00 $100.00 12/28/22 R25273 FIRE SPRINKLER - FIRE PLAN 001.000.345.83.100.00 $912.22 $912.22 12/28/22 R25273 REVIEW FEE FIRE SPRINKLER - FIRE VALUATION 001.000.342.40.000.00 $1,073.20 $1,073.20 7/26/23 R30209 BASED FEE TOTALS: $2,325.42 $2,325.42 • 1 • CONDITION TYPE STATUSI ! NOTES Printed: Thursday, July 27, 2023 1:11:45 PM 1 of 2 FIRE SPRINKLER Permit City of • • • - 98020 1 136, www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES F-5 FIRE SPRINKLER ACCEPT F-7 FIRE PRESSURE TEST F-8 FIRE SPRINKLER INSUL X-1 FIRE FINAL" X-0 CROSS CONNECTION FINAL Printed: Thursday, July 27, 2023 1:11:45 PM 2 of 2