Building PermitType: COMMERCIAL BLDG Subtype: NEW APT OR CONDO BLDG I Status: ISSUED
Parcel No: 00576700002614 Site Address: 8215 236TH ST SW EDMONDS,WA 98026 Applied: 9/30/2022
Subdivision: SP S-2004-64, 005767, SP 82 (3-86), SP S-2003-190, SP S-2004-63 Lot: 0 Issued: 7/27/2023
Fire Sprinklers: Yes Lot Area: Zoning: Final:
Valuation: $1,555,030.29 Occupancy Type: R-2/B/S-2 Construction Type: VB Expiration Date: 7/21/2024
Code Edition: 2018 No. Stories: 3 # of Dwelling Units: 10 Issued by: JOK
Scope of Work: HOUSING HOPE- BUILDING A (10 APTS) ***MAIN PERMIT***
I WA State Contractor L & I #: KIRTLAL951BC I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KIM WILLIAMS
26915 102ND DR NW 201,
(360)629-3441
KIM@DESIGNSNW.COM
STANWOOD WA 98292
CONTACT
DESIGNS NORTHWEST
26915 102ND DR NW 201,
(360)629-3441
kim@designsnw.com
ARCHITECTS
STANWOOD WA 98292
CONTRACTOR
KIRTLEY-COLE ASSOCIATES
2820 OAKES AVE SUITE B,
(425)609-0446
JSchwartz@Kirtley-Cole.com
LLC
EVERETT WA 98201
ELCFA / MADRONA
5830 EVERGREEN WAY,
OWNER
(425)322-3723
JEFFCHANDLER@HOUSINGHOPE.ORG
HIGHLANDS
EVERETT WA 98203
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/7/22
R23589
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
7/27/23
R30275
INDEPENDANT FEE CALCULATION
001.000.345.83.400.00
$260.00
$260.00
7/27/23
R30275
REVIEW
INDEPENDENT TRAFFIC IMPACT FEE
112.502.345.86.000.00
$29,131.11
$29,131.11
7/27/23
R30275
PERMIT FEE - COMMERCIAL
001.000.345.83.000.00
$9,348.80
$9,348.80
7/27/23
R30275
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$8,371.48
$8,371.48
10/7/22
R23589
STATE BUILDING CODE SURCHARGE
001.000.237.150
$18.00
$18.00
7/27/23
R30275
EACH ADDL DWELLING UNITS
STORMWATER GENERAL FACILITY
422.000.379.00.000.00
$14,288.78
$14,288.78
7/27/23
R30275
CHARGE MF COMM
TRANSPORTATION IMPACT ADMIN
001.000.345.83.400.00
$100.00
$100.00
7/27/23
R30275
FEE - MF COMM
TOTALS: $61,583.17
$61,583.17
CONDITIONS
CONDITION TYPE
STATUS
NOTES
FOR
48 HRS NOTICE-ENGR FINAL
48 Working hours notice is required when requesting
your FINAL engineering inspection.
NFORMATION
Printed: Thursday, July 27, 2023 2:12:44 PM 1 of 5
•MERCIAL BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
98020 1 •
ww.edmondswa.gov
FOR
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
NFORMATION
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE
SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN
CARBON MONOXIDE SYSTEMS
O
NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR
INFORMATION
ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS
ARE ADDED OR CREATED.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
ELECTRICAL PERMIT
O
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
ORMATION
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
EXIT SIGNAGE AND EMERGENCY
FOR
Final locations of illuminated exit signs and emergency lighting subject to field inspection
LIGHTING
INFORMATION
by the Fire Marshal.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
Printed: Thursday, July 27, 2023 2:12:44 PM 2 of 5
• . •:� i 1 •
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
INFORMATION
www.mybuildingpermit.com
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
MAINTENANCE BONDS
FOR
Maintenance Bond(s) required at FINAL.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
FOR
INFORMATION
MANUAL ENTRY
Defferred permits:
1. Sign Permit
OTHER CONDITION
2.Fire sprinkler
FOR
3.Fire Alarm system
INFORMATION
4.electrical
S.Distributive Antenna system
6.Shop Drawings off site sports court commercial clearing/grading (civil permit)
7.Demolition permit for relocation of offsite office modular
FOR
This property falls within the Olympic View Water and Sewer District. A permit from
OVWSD SEWER LATERAL
INFORMATION
Olympic View is required for the sewer lateral installation.
FOR
This property falls within the Olympic View Water and Sewer District. A permit from
OVWSD SEWER SERVICE
INFORMATION
Olympic View is required for the sanitary sewer installation.
OVWSD WATER LINE/METER
FOR
This property falls within the Olympic View Water and Sewer District. Contact Olympic
INFORMATION
View for specific water line and/or water meter information.
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch
min stroke width on a contrasting background.
FOR
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
NFORMATION
FOR
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance.
PROJECT CIVIL ASBUILT
INFORMATION
Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov.
The building enclosure must be inspected by a qualified inspector in accordance with
RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter from
the inspector must be submitted to the Building Division prior to final inspection by the
RCW 64.55 BUILDING
FOR
City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction
ENCLOSURE
INFORMATION
occurs, coordinate inspection with the City Building Inspector to ensure that all required
inspections are performed. Inspection by the building enclosure inspector to meet RCW
64.55 does not substitute for required City building inspections which must be performed
by the City Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
RESTORE LANDSCAPE
FOR
Restore landscape to like or better conditions
NFORMATION
Printed: Thursday, July 27, 2023 2:12:44 PM 3 of 5
•MERCIAL
BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
9:0i 1 •
. •. •
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
A Special Inspection agreement is required for this project. It is the owner/contractors
SPECIAL INSPECTIONS
FOR
responsibility to ensure inspections take place and that reports are provided to the
ENGINEERING
INFORMATION
Engineering Division on a weekly basis at Engineeringpermits@edmondswa.gov.
STORM COVENANT
FOR
A stormwater covenant shall be approved for recording prior to project final approval.
NFORMATION
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
INSPECTOR
COMPLETED
RESULT
NOTES
MOWINSPECTIONTYPE
X-1 FIRE FINAL
B-1 SETBACKS
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 ROOF SHEATHING
B-4 CEILING GRID
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 INTERIOR SHEAR
B-4 TRASH ENCLOSURE
B-5 BLDG SPECIAL
INSPECTION
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
B-5 CROSS CONNECTION
B-2 SLAB INSULATION
X-1 PLANNING FINAL
A-1 TESC AND MOBILIZE
Printed: Thursday, July 27, 2023 2:12:44 PM 4 of 5
•MMERCIAL
BLDG PermitCity
-
•
• • •
Edmonds98020 1 •
w.edmondswa.gov
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
E-4 STRM STUB CONNECT
E-4 WATER SERVICE LINE
E-9 COMPOST AMEND
X-0 OVWSD APPROVAL
X-2 ENGINEERING FINAL
A-1 BUILDING PRECON
PLEASE SEE SHEET WP-100 THRU WP-500
The building enclosure must be inspected by a
qualified inspector in accordance with RCW
64.55.030, 64.55.040, and 64.55.050. A building
enclosure certification letter from the inspector must
be submitted to the Building Division prior to final
inspection by the City Building Inspector in
accordance with RCW 64.55.060. Where phasing of
construction occurs, coordinate inspection with the
City Building Inspector to ensure that all required
inspections are performed. Inspection by the building
enclosure inspector to meet RCW 64.55 does not
substitute for required City building inspections which
must be performed by the City Building Inspector.
X-3 BUILDING FINAL"
The building enclosure must be inspected by a
qualified inspector in accordance with RCW
64.55.030, 64.55.040, and 64.55.050. A building
enclosure certification letter from the inspector must
be submitted to the Building Division prior to final
inspection by the City Building Inspector in
accordance with RCW 64.55.060. Where phasing of
construction occurs, coordinate inspection with the
City Building Inspector to ensure that all required
inspections are performed. Inspection by the building
enclosure inspector to meet RCW 64.55 does not
substitute for required City building inspections which
must be performed by the City Building Inspector.
B-4 FRAMING
The building enclosure must be inspected by a
qualified inspector in accordance with RCW
64.55.030, 64.55.040, and 64.55.050. A building
enclosure certification letter from the inspector must
be submitted to the Building Division prior to final
inspection by the City Building Inspector in
accordance with RCW 64.55.060. Where phasing of
construction occurs, coordinate inspection with the
City Building Inspector to ensure that all required
inspections are performed. Inspection by the building
enclosure inspector to meet RCW 64.55 does not
substitute for required City building inspections which
must be performed by the City Building Inspector.
A-1 ENGINEERING PRECON
-F
7
Printed: Thursday, July 27, 2023 2:12:44 PM 5 of 5