Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW APT OR CONDO BLDG I Status: ISSUED Parcel No: 00576700002614 Site Address: 8215 236TH ST SW EDMONDS,WA 98026 Subdivision: SP S-2004-64, 005767, SP 82 (3-86), SP S-2003-190, SP S-2004-63 Lot: 0 Fire Sprinklers: Yes Lot Area: Zoning: Valuation: $1,307,959.18 Occupancy Type: R-2, S-2 Construction Type: VB Code Edition: 2018 No. Stories: 3 # of Dwelling Units: 12 Scope of Work: HOUSING HOPE- BUILDING C (12 APTS) Applied: 9/30/2022 Issued:7/27/2023 Final: Expiration Date: 7/21/2024 Issued by: JOK I WA State Contractor L & I #: KIRTLAL951BC I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KIM WILLIAMS 26915 102ND DR NW 201, (360)629-3441 KIM@DESIGNSNW.COM STANWOOD WA 98292 CONTACT DESIGNS NORTHWEST 26915 102ND DR NW 201, (360)629-3441 kim@designsnw.com ARCHITECTS STANWOOD WA 98292 CONTRACTOR KIRTLEY-COLE ASSOCIATES 2820 OAKES AVE SUITE B, (425)609-0446 JSchwartz@Kirtley-Cole.com LLC EVERETT WA 98201 ELCFA / MADRONA 5830 EVERGREEN WAY, OWNER (425)322-3723 JEFFCHANDLER@HOUSINGHOPE.ORG HIGHLANDS EVERETT WA 98203 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 10/7/22 R23589 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 7/27/23 R30276 PERMIT FEE - COMMERCIAL 001.000.345.83.000.00 $8,658.40 $8,658.40 7/27/23 R30276 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $7,359.64 $7,359.64 10/7/22 R23589 STATE BUILDING CODE SURCHARGE 001.000.237.150 $22.00 $22.00 7/27/23 R30276 EACH ADDL DWELLING UNITS TOTALS: $16,105.04 $16,105.04 CONDITIONS CONDITION TYPE STATUS NOTES FOR 48 HRS NOTICE-ENGR FINAL 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION FOR ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. NFORMATION Printed: Thursday, July 27, 2023 2:45:09 PM 1 of 5 •MERCIAL BLDG PermitCity - • • • • •:0iBLD2022-1321 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS O property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. EXIT SIGNAGE AND EMERGENCY FOR Final locations of illuminated exit signs and emergency lighting subject to field inspection LIGHTING INFORMATION by the Fire Marshal. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Printed: Thursday, July 27, 2023 2:45:09 PM 2 of 5 rMERCIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2022-13211 ww.edmondswa.gov LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION MAINTENANCE BONDS FOR Maintenance Bond(s) required at FINAL. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. FOR MANUAL ENTRY INFORMATION Defferred permits: 1. Sign Permit OTHER CONDITION 2.Fire sprinkler FOR 3.Fire Alarm system INFORMATION 4.electrical S.Distributive Antenna system 6.Shop Drawings off site sports court commercial clearing/grading (civil permit) 7.Demolition permit for relocation of offsite office modular FOR This property falls within the Olympic View Water and Sewer District. A permit from OVWSD SEWER LATERAL INFORMATION Olympic View is required for the sewer lateral installation. FOR This property falls within the Olympic View Water and Sewer District. A permit from OVWSD SEWER SERVICE INFORMATION Olympic View is required for the sanitary sewer installation. OVWSD WATER LINE/METER FOR This property falls within the Olympic View Water and Sewer District. Contact Olympic INFORMATION View for specific water line and/or water meter information. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. FOR POTHOLING NFORMATION VERIFY CLEAR BORE CROSSINGS. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. The building enclosure must be inspected by a qualified inspector in accordance with RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter from the inspector must be submitted to the Building Division prior to final inspection by the RCW 64.55 BUILDING FOR City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction ENCLOSURE INFORMATION occurs, coordinate inspection with the City Building Inspector to ensure that all required inspections are performed. Inspection by the building enclosure inspector to meet RCW 64.55 does not substitute for required City building inspections which must be performed by the City Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. RESTORE LANDSCAPE FOR Restore landscape to like or better conditions NFORMATION Printed: Thursday, July 27, 2023 2:45:09 PM 3 of 5 •MERCIAL BLDG PermitCity - • • • • 98020 1 Sk www.edmondswa.gov Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. A Special Inspection agreement is required for this project. It is the owner/contractors SPECIAL INSPECTIONS FOR responsibility to ensure inspections take place and that reports are provided to the ENGINEERING INFORMATION Engineering Division on a weekly basis at Engineeringpermits@edmondswa.gov. STORM COVENANT FOR A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. ' • - • - •MEW 1"We ro • INSPECTIONTYPE 04 INSPECTOR COMPLETED RESULT !NO"TESM X-1 FIRE FINAL X-3 BUILDING FINAL" A-1 BUILDING PRECON B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 ROOF SHEATHING B-4 CEILING GRID B-4 FIRESTOPPING B-4 FRAMING B-4 INTERIOR SHEAR B-4 TRASH ENCLOSURE B-5 BLDG SPECIAL INSPECTION B-5 CROSS CONNECTION B-5 INSULATION ENERGY X-1 PLANNING FINAL Printed: Thursday, July 27, 2023 2:45:09 PM 4 of 5 rMMERCIAL • w.edmondswa.gov BLDG PermitCity • • • Edmonds- 98020BLD2022-1321 B-7 BUILDING OTHER INSP B-4 DRYWALL FASTENING X-1 PLANNING FINAL A-1 TESC AND MOBILIZE E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE E-4 STRM STUB CONNECT E-4 WATER SERVICE LINE E-9 COMPOST AMEND X-0 OVWSD APPROVAL X-2 ENGINEERING FINAL Printed: Thursday, July 27, 2023 2:45:09 PM 5 of 5