ENG2023-0300 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
LM
www.edmondswa.gov i
Description: COMCAST - REMOVE CONDUIT FROM BO POLE ATTACH TO NEW POLE
ISSUED: 07/31/2023
Address: 410 DAYTON ST EDMONDS WA 98020-3518
EXPIRES: 01/31/2024
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032300406900
NAME TYPE NAME ADDRESS PHONE
APPLICANT DESIRE GEORGE 406 PORTER WAY, MILTON WA 98354 (253)922-2787
CONTACT CANNON CONSTRUCTION LLC 406 PORTER WAY, MILTON WA 98354 (253)922-2787
CONTRACTOR CANNON CONSTRUCTION INC 406 PORTER WAY, MILTON WA 98354 (253)248-1052
OWNER WINSLOW LLC 18445 16TH AVE NW, SHORELINE WA 98177
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$504.00 $504.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 07/31/2023
Printed: Monday, July 31, 2023 10:28:28 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUMBE3
City of Edmonds
,...Ave
N, Edmonds WA 9:01 1 11
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
E-7 CONCRETE SIDEWALK
E-7 CURB GUTTER
E-7 DWY APPROACH
E-7 RESTOR LIMITS
Printed: Monday, July 31, 2023 10:28:28 AM 2 of 2
RECEIVED
of EpM04O�
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right-of-Wgy permit Handout E6�.
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General •
Project Name 410 Dayton St
Site Address or if no site address use Property Address at NW corner of project area: 410 Dayton St Edmond WA 98020
Associated Permits: BLD PLN ENG
Owner and Entity Holding
Name of Company Comcast Cable Communications Management Franchise Ordinance No:
Point of Contact Jessamin Santos
Title Permit Coordinator
Address 410 Valley Ave NW
City Puyallup
State CIA
Zip 98371
Phone 25.256.8843
Email jessamin—santos@cable.comcast.com
Contractor and Authorized Agent of Owner
Name of Company Cannon Construction
(see note below)
Contractor Contacts During Construction
Primary Name
Agent Name Desire George
Title
Title Permit Coordinator
Mobile
Address 406 Porter Way
Email
City Milton
State WA
Zip 98354
Secondary Name
Phone 253-922-2787 ext
Title
Email dgeorge@teamcannon.com
Mobile
City of Edmonds Business License No:
Email
State License No: CANNOCL791 JK
0 Contractor verifies it is currently bonded
0 Contractor verifies it currently has general liability insurance
NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
X Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 Of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Wreckout (1) 2" riser & (1) 4" riser, Dig up and intercept 4" conduit and place (1) new 4" split duct riser on new pole, break out B'x9' concrete panel, reroute and place new conduit to vault
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk '72hours +
LF
I x
LF
SF
Alley'72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
e telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
X
No
2. Will any equipment be added underground or above round (e.. pedestals, vaults, etc.)?
X
If yes, describe: placing conduit uncierground to new pole
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
6.
of Work to be Completed
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed: 8x9 panel of sidewalk along Dayton St
Yes
x
No
11
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
2
What is the height of the existing poles?
35
How many poles are to be removed?
o
Are additional poles to be laced?
0
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Desire George D..2!023062608375 -0,W DATE: 06i26/2023
APPLICANT PRINTED NAME: desire George
APPLICANT TITLE: Permit Coordinator
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
00 3:
W
I
N J
0
V
J
Q
W
0
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
o
PARKING LOT
x
o
120
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
S/W❑
OW O ROW
S/W —
OW
/W -
S
OW
SIDEWALK
RI EWAY
CB
EOP- EOP EOP
0 IDEWALK I.
PARKING
20
EOP
„
EOP
D
DAYTO ND S T
D MH
9'
D D
E
1
__-_-_—
O
- - - - - - - S --_—
—
M
—_—_
___
o
CD
9E
0
,A
JAJ W
Q -W -
W
W Q
W
CB
PARKING PARKING
30'
14'
U)
S/W — �— EO
CB
PARKING
C
_ _
— C C
C
3 C
2'
EOP
C
S/W - -
S/W
C
S/W DRIVEWAY S/W SIDEWALKS W
25
°25
RI SVAY
5'
• SI(,VALK
DRIVEWAY
Ft'o
R/Nvj - - - - -
0
o
Ix
410
VIM
o
0
420
400
IY
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
p UTILITIES MAY REQUIRE A SEPERATE PERMIT.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
%I/ LV1,,J,,,44p 07/25/2023
VV
RECEIVED
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
CONSTRUCTION NOTES.
1O WRECKOUT (1) 2" RISER & (1) 4" RISER
2 DIG UP AND INTERCEPT 4" CONDUIT AND PLACE
2)
(1) NEW 4" SPLIT DUCT RISER
3 BREAK OUT 8'X9' CONCRETE PANEL, REROUTE
AND PLACE NEW CONDUIT TO VAULT
**NEED RATCHET SET FOR VAULT
C/G & SIDEWALK FORM
INSPECTIONS REQUIRED
LOCATION POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
O SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
STATION START
STATIONING STARTS AT 10+00 THE INTERSECTION OF
4TH AVE S & DAYTON ST
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF T HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF S'
HORIZONTAL CLEARANCE.
/ N \
W 4 E
�S�
Ce.�.�eNi.y Tlw Fufir�$wu�1965
CANNON COMPANIES
e�:try I ou�ury I •rrEaxrry I �rwortu
li
COMCAST
I&.
Knowwhat's below.
CALL before You dig.
UJ
O
ci
04
Z
as
1-004
W
z
O G G Z
4
Im��Q
Z
W
a
N
O
Z
N
W
a
x
u
K
O
z
WLU
a
V
a
0
ir
-.irr
CODE: 17-050
DATE: 06/22/23
PROJECT MANAGER:
ZR
DRAWN BY:
HAYLEY W
SCALE:
I I I
0 10 20
CONSTRUCTION PLAN
5/ 7
V
>J
W
0
0
0 0
o
F¢-
a_
O
M
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
PARKING LOT
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
OWS1W O OW
SIDEWALK
TEOP- EOP
PARKING
O
—J
S/W
RIVEWAY
DAYTON ST
0 CD I
+ o o
LO
~ ¢
PARKING PARKING C0 co
3/W II •tom—
EOP
s/W DRIVEWAY � - SIDEWAL �
S.ROW SN
400
I I
Q
w OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
> ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
0
G,
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
410
M
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
0
120
0
OW
0 IDEWALK
EOP 11 1� EOP
'till
RESTORATION NOTES.
RESTORE CONCRETE SIDEWALK PANELS PER
CITY OF EDMONDS SPECIFICATIONS.
-------f— — — -- C/G & SIDEWALK FORM
0
INSPECTIONS REQUIRED
30' - - -
VAY
ENGINEERING DIVISION RECEIVED
APPROVED AS NOTED
,II Jun 27 2023
Jell Ulo✓xu..,,,p 07/25/2023 CITY OF EDMONDS
VV DEVELOPMENT SERVICES
DEPARTMENT
LOCATION POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
O SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
STATION START
STATIONING STARTS AT 10+00 THE INTERSECTION OF
4TH AVE S & DAYTON ST
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF T HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF S'
HORIZONTAL CLEARANCE.
/ N \
W J E
S
C-fi dTIw F..w.r s' .ass
CANNON COMPANIES
e�:try I au�ury I nrrEaxrry I �rwortu
li
COMCAST
I&.
Knowwhat's below.
CALL before you dig.
UJ
O
ci
CV
Z
1-
004
W
zN
ocoz
Q
Z
W
a
Z
u
00
N
w
=
K
o
z
W
0
V
0-
CODE: 17-050
DATE: 06/22/23
PROJECT MANAGER:
ZR
DRAWN BY:
HAYLEY W
SCALE:
I I
0 10 20
RESTORATION PLAN
6/7
CONSTRUCTION NOTES.
1O WRECKOUT (1) 2" RISER & (1) 4" RISER
DIG UP AND INTERCEPT 4" CONDUIT AND PLACE
2
2) (1) NEW 4" SPLIT DUCT RISER
BREAK OUT 8'X9' CONCRETE PANEL, REROUTE
3 AND PLACE NEW CONDUIT TO VAULT
**NEED RATCHET SET FOR VAULT
RESTORATION NOTES:
1 R RESTORE CONCRETE SIDEWALK PANELS PER
CITY OF EDMONDS SPECIFICATIONS.
1 R
,�
. •
is '
I') ' F' T r�
Al
l/-
y ..
wok
y¢ "
�\
U
7
2
/l
PLACE NEW CONDUIT TO VAULT
2 BREAK OUT 8'X9' CONCRETE PANEL
ROAD NAME - DAYTON ST
ROAD NAME - DAYTON ST
RECEIVED
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
/ N \
W 4 E
�S�
Ce.�.�eNi.y Tlw Fufir�$wu�1965
CANNON COMPANIES
e�:try I au�ury I nrrEaxrry I �rwortu
NO
COMCAST
I&.
Know what's below.
CALL before you dig.
W
N
�Nf~00
Q
opp4
W
z
����'
rn
Z
Q
O G G
O O O 0
Z
W
Q
J
tN
0
Z
N
Wo
=
�Z
Lu°
WR
0-
CODE: 17-050
DATE: 06/22/23
PROJECT MANAGER:
ZR
DRAWN BY:
HAYLEY W
SCALE:
NO
SCALE
SITE PHOTOS
7/ 7
PROJECT MAP:
v
D Q
� L
N L
PAGE 5 0,�,.,....
v
Q D
L
�N�
W ' E
�S�
POLE INFORMATION:
POLE COUNT = 2 TRANSMISSION = 0
POLES THAT NEED PERMIT = 0 DISTRIBUTION = 2
POLES THAT NEED MAKE READY = 0
BILLOF MATERIALS*.
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED II
FIBER 57 FT + 20%
STORAGE
= 68 FT
ROW FOOTAGES*:
SITE FOOTAGES*:
NEW AERIAL =
OFT.
NEW BUILDING PATHWAY =
0 FT.
OVERLASH =
OFT.
EXISTING BUILDING PATHWAY =
0 FT.
NEW UNDERGROUND =
7FT.
NEW UNDERGROUND =
0 FT.
EXISTING UNDERGROUND =
OFT.
EXISTING UNDERGROUND =
0 FT.
RISER(2) =
50FT.
TOTAL ROW FOOTAGE =
OFT.
TOTAL SITE FOOTAGE =
0 FT.
I TOTAL PROJECT FOOTAGE = 57 FT. I
Plant Maintenance
J B0001507290
410 DAYTON ST
Cow J -rk,& Fwttw& 5 i *� 19 8 5
CANNON COMPANIES
SAFETY I QUALITY I INTEGRITY I TEAMWORK
SITE ADDRESS:
410 DAYTON ST
EDMONDS WA 98020
Know what's below.
CALL before you dig.
CONTACTS:
COMCAST COMMUNICATION
Casey Brown - (425)-263-5345 - Casey_Brown2@cable.comcast.com
CANNON COMPANIES
Zack Rollins - (253) 754-1914- zrollins@teamcannon.com
SCOPE OF WORK:
- WRECKOUT (1) 2" RISER & (1) 4" RISER
- DIG UP AND INTERCEPT 4" CONDUIT AND PLACE (1) NEW 4" SPLIT DUCT RISER
- BREAK OUT 8'X9' CONCRETE PANEL, REROUTE AND PLACE NEW CONDUIT TO VAULT
**NEED RATCHET SET FOR VAULT
SHEET INDEX
1 - COVER 7
2 - GENERAL NOTES
3 - LEGEND
4 - DETAILS
5 - CONSTRUCTION PLAN
6 - RESTORATION PLAN
SITE PHOTOS
RECEIVED
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
COMCAST
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION
THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE
THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND
OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE
PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL
OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT
WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES
NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL
TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF
THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO
PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY
RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER,
AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY
HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED
TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN
APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES
WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT,
UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE
LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR
ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON -WORKING HOURS
EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK
PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER
REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL
(I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH
BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL
LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON -TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC -BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF
CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE,
DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND
PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION
PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC -GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND
PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM -RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF
EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE
ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVELAREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE
WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO
PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN -KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND
WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO
CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S
WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE -RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR
REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN
WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL
GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED
WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
RECEIVED
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Ce.+erAin9 T Iw FW uw Siwae iv85
i
CANNON COMPANIES
s�ery I auunv � swim � �rxionK
li
COMCAST
I$.
Know what's below.
CALL before you dig.
W
N
�HU
Z
Q
coc
1-00
W
T. H
Z
000Z
a
m o o p
L
'���
Z
W
a
J
f1
V
0
z�
O
Z
�
LULUo
a
�
U
w
o
d
u
a
Q
0
CODE, 17-050
DATE. 06/22/23
PROJECT MANAGER:
ZR
DRAWN BY:
HAYLEY W
SCALE:
NO
SCALE
GENERAL NOTES
2/7
LINE TYPES
PARCEL LINES
BUILDING OUTLINE
LANE LINE
CENTER LINE / STATION LINE
FOG LINE
EOP
EOP
EDGE OF PAVEMENT
Row
Row
RIGHT OF WAY
SIDEWALK
CROSSWALK
FENCE
L
GUARD RAIL
P
POWER
Ts
TRAFFIC SIGNAL
O
COMMUNICATION
T
T
TELECOMMUNICATION
S
S
SEWER MAIN
SS
Ss
SIDE SEWER
D
D
DRAIN MAIN
DID
DD
DRAINAGE DITCH
G
G
GAS
OIL
OIL
OIL
ST
ST
STEAM
W
W
WATER
UNIC
UNIC
UNKNOWN UTILITY
STRAW WATTLES
0 0 0 0 0
0 0 o n n
TRAFFIC CONES
PROPOSED NEW CONDUIT
PROPOSED NEW STRUCTURE
EXISTING CONDUIT/INFRASTRUCTURE
PROPOSED NEW AERIAL STRAND
EXISTING AERIAL
SYMBOLS
0/0
UTILITY POLE (EXIST / NEW)
®/®
UTILITY RISER (EXIST / NEW)
SL
STREET LIGHT
CW
CROSS WALK SIGNAL
."YA,�t
3e
SHRUBBERY
TREE
CB
CATCH BASIN
CATCH BASIN W/ SOCK
FIRE HYDRANT
�M
WATER METER
MH
MANHOLE
OV
UTILITY VALVE
17X30 VAULT
24X36 VAULT
36X48 VAULT
4X4 VAULT
25-TA VAULT
35-TA VAULT
253-TA VAULT
233-LA
® 444-LA
LINK VAULT (SIZE MAY VARY)
DH DOG HOUSE
TH TIGER HOUSE
CAB CABINET
[P] PEDESTAL
BOREPIT
BOREPIT (SIZE MAY VARY)
�.
EXISTING SPLICE CASE
�.
NEW SPLICE CASE
NEW COAX TAP
2V
NEW STORAGE
POLE ANCHOR/GUY PROPOSED
339'
FOOTAGE NOTE
(339')
FOOTAGE NOTE OVER
MULTIPLE SHEETS
O
UTILITY POTHOLE
STREET SIGN
IN \\
NORTH ARROW
LANE DIRECTION INDICATOR
0 o BUS STOP LOCATION
MARK-UP NOTATIONS
- STA 0+00 DISTANCE STATION
# --� DISTANCE DIMENSION
POLE # CALLOUT
CONSTRUCTION NOTE CALLOUT
CROSS SECTION SYMBOL
A CROSS SECTION NAME
CROSS SECTION PAGE
WORK BEING DONE PHOTO NOTE CALLOUT
LOCATION
40 J PHOTO LOCATOR/ORIENTATION
���/// CALLOUT
HATCH PATTERNS
El CONCRETE ASPHALT
El CONCRETE PANELS
® BRICK/COBBLE
® LANDSCAPE
GRAVEL
❑ LIMITS OF RESTORATION
RECEIVED
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Ce. A-OTI-F.6. Siwac]A85
CANNON COMPANIES
s TvIQll mI KrOWm I WArxTOW
A 100
COMCAST
is.
Know what's below.
CALL before you dig.
Uj
O
V
CV
0)HU
Z
Q
COO
1
-00
W
T. H
Z
00 z
a
m O O p
Z
W
a
J
d
V
a
Z
O
Z
v)
w
=
u
�
o
wLU
o
a
N
a
a
0
CODE: 17-050
DATE' 06/22/23
PE.ECTMANA H
ZR
DRAWN BY:
HAYLEY W
SCALE:
NO
SCALE
LEGEND
3/7
PLAN VIEW 12" MIN. ZONE OF INFLUENCE 12" MIN
8" MIN CONCRETE (MATCH
CL EX IF GREATER
DIRECTION OF VEHICULAR TRAFFIC
° a ° a • , . ° e ° 8
LOCATION LOCATION
1 2
LOCATION LOCATION
4 3
5" MIN
-UP TO 2 CONDUITS
CONDUIT
STANDOFF BRACKET
CONDUIT CLAMP 1S" MIN LENGTH
LEX CONCRETE
SURFACE
Z
12'
_ 24"
n STANDARD DETAIL n STANDARD DETAIL
RISER PLACEMENT ` CONCRETE TRENCH DETAIL
6" MIN COMPACT
MINERAL AGGREGATE
TYPE 2
COMPACTED
BACKFILL
RECEIVED
Jun 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
COnw 6-6 Tk.FWW SiA 1985
CANNON COMPANIES
e�ceET I auunT I �lE�oxm I iF.rYroxc
ii
COMCAST
Know what's below.
CALL before you dig.
W
N
V
Q
CDt~NCCOO
O
0 Q
O
3
H
Ln
N
Z
Z
Q
O G C
m O O 0
z
ul
Q
u
ci
z�
oz
�
u
LU
cr
o
Z
U
a
w
a
a
r
a
0
cooE: 1 7.0:
onrE: 06/22/23
PROJECT MANAGER:
ZR
DRAWN BY:
HAYLEY W
SCALE:
NO
SCALE
DETAILS
4/7
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
SIGN SPACING
= X (1)
RURAL ROADS & URBAN ARTERIALS
35 140 MPH
350't
RURAL ROADS, URBAN ARTERIALS,
25 130 MPH
200't (2)
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
25 MPH OR LESS
100't (2)
(1) ALL SPACING MAY BE ADJUSTED TO
ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN
URBAN AREAS TO
FIT
ROADWAY CONDITIONS.
LEGEND
K
TEMPORARY SIGN LOCATION
O
CHANNELIZING DEVICES
PROTECTIVE VEHICLE
BY
MINIMUM SHOULDER TAPER LENGTH = 1-13 (feet)
SHOULDER
Posted Speed (mph)
VADTH
(feet)
25
1 30
1 35
1 40
1 45
1 50
1 55
1 60
1 65
1 70
8'
40
1 40
1 60
1 90
1 -
-
-
-
-
-
10'
40
1 60
1 90
1 90
1 _
USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8'
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25 1
30
1 35 1
40
1 45
1 50
1 55
1 60
1 65
1 70
LENGTH (feet)
155
200
1 250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 Ibs.
HOST VEHICLE WEIGHT
> 22,000 Ibs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100'
123'
172'
74'
100'
150,
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
DAYTON ST Z
b �
® 0 0 O 0 O O 0 0
O
WORK AREA
X X i L/3 B R 50,
48'
ROAD
WORK
AHEA/48'
SHOULDER
WORK
48„
W21-5
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANGENT
35/40
30
60
25/30
20
1 40
ENGINEERING DIVISION
RECEIVED
APPROVED AS NOTED
Jun 27 2023
jdl W��� p 07/25/2023
v -U
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
NOTES
1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT).
SHOULDER CLOSURE - LOW SPEED 2. ALL SIGNS ARE BLACK ON ORANGE.
(40 MPH OR LESS)
NOT TO SCALE
ure - Low Soeed (40 MPHI or Less)\TC-5.dan
� xnx vxv
�I/ TC5�
Washington State ....
Department of Transportation or
TRAFFIC CONTROL PLAN x
RECEIVED
Jun 27 2023
CITY OFDEVELOPMENT
EDMONDS CITY OF EDMONDS MyBuildingPermit.com
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1338330 - JB0001507290-PLANT MAINTENANCE
Applicant
First Name Last Name Company Name
Desire George Cannon Construction LLC
Number Street Apartment or Suite Number E-mail Address
406 Porter Way dgeorge@teamcannon.com
City State Zip Phone Number Extension
Milton WA 98354 (253) 922-2787
Contractor
Company Name
CANNON CONSTRUCTION LLC
Number Street Apartment or Suite Number
406 Porter Way
City State Zip Phone Number Extension
Milton WA 98354 (253) 754-1914
State License Number License Expiration Date UBI # E-mail Address
CANNOCL791JK 4/12/2025 FD15gf13F;3 zrollins@teamcannon.com
Project Location
Number Street Floor Number Suite or Room Number
410 DAYTON ST
City Zip Code County Parcel Number
EDMONDS 98020 27032300406900
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
WINSLOW LLC
Number Street Apartment or Suite Number
18445 16TH AVE NW
City State Zip
SHORELINE WA 98177
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 6/26/2023 Submitted By: Desire George
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1338330 - JB0001507290-PLANT MAINTENANCE
Project Contact
Company Name: Cannon Construction LLC
Name: Desire George Email: dgeorge@teamcannon.com
Address: 406 Porter Way Phone #: (253) 922-2787
Milton WA 98354
Project Type
Utility Purveyor
Activity Type
Utility Work
Project Name: JB0001507290-PLANT MAINTENANCE
Scope of Work
Disturbance of Surface
Description of - WRECKOUT (1) 2" RISER & (1) 4" RISER - DIG UP AND INTERCEPT 4" CONDUIT AND
Work: PLACE (1) NEW 4" SPLIT DUCT RISER - BREAK OUT 8'X9' CONCRETE PANEL,
REROUTE AND PLACE NEW CONDUIT TO VAULT
Project Details
Project Information
Job Number
JB0001507290
Page 2 of 2