Loading...
APPROVED BLD2023-0543+Architectural_Plan+5.3.2023_8.38.28_AM+3521204GENERAL REQUIREMENTS REFER TO SUBSEQUENT PLAN AND DETAIL NOTES FOR VARIATIONS AND REQUIREMENTS SPECIFIC TO REFERENCED PROJECT. NOTES ON DRAWINGS TAKE PRECEDENCE OVER GENERAL STRUCTURAL NOTES. DESIGN CRITERIA ALL WORK SUBJECT APPROVED TO FIELD PLANS MUST BE FOR BUILDING CODE CONFORMANCE (MEETS OR EXCEEDS REQUIREMENTS): CODE COMPNIANCE ON JOB SITE 2018 INTERNATIONAL BUILDING CODE (IBC) 2018 INTERNATIONAL RESIDENTIAL CODE (IRC) 2018 WASHINGTON BUILDING CODE 2018 WASHINGTON RESIDENTIAL CODE 0: 11121u111iL1113 ROOF DEAD LOAD 15 PSF FLOOR DEAD LOAD 15 PSF WOOD WALL DEAD LOAD 12 PSF DECK DEAD LOAD 12 PSF CONCRETE 150 PCF 40=110L1113 ROOF LIVE LOAD 25 PSF DECK LIVE LOAD 60 PSF FLOOR LIVE LOAD (RESIDENTIAL) 40 PSF SAFEBASE PUSH PIERS MATERIALS: BRACKET PLATES - ASTM A36 (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu PIER TUBES - ASTM A500 GRADE B OR C (MIN YIELD STRESS, Fy = 46 KSI / MIN TENSILE STRESS, Fu EXTERNAL SLEEVE - ASTM A500 GRADE B OR C (MIN YIELD STRESS, Fy = 46 KSI / MIN TENSILE STRESS, Fu PIER CAP - ASTM A36 (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu COIL ROD - ASTM A193 GRADE B7 (MIN YIELD STRESS, Fy = 105 KSI / MIN TENSILE STRESS, Fu STEEL ANGLE SHAPES - ASTM A36 (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu City Of Edmonds Building Department Work FOUNDATION STABILIZATION Address 1222 8TH AVE S Owner SCHMUTZ Approved Date 5/24/2023 Building Official /7astayscst W. X c,� Permit Number BLD2023-0543 (Special inspections are required for this permit: ■ ■Installation on construction of the push pins, I (Foundation bracket, stabilizer's and Terrathane■ ■Geo-technical 24-010 polyurethane foam I = 58 KSI) REVISIONS - PAGES = 58 KSI) = 58 KSI) = 58 KSI) = 125 KSI) = 58 KSI) WELDING NOTES: CONFORM TO AWS D1.1. WELDERS SHALL BE CERTIFIED IN ACCORDANCE WITH AWS REQUIREMENTS. USE E70 ELECTRODES OF TYPE REQUIRED FOR MATERIALS TO BE WELDED. CORROSION PROTECTION: SACRIFICIAL DESIGN THICKNESS - CAPACITIES INCLUDE A SCHEDULED LOSS IN STEEL THICKNESS DUE TO CORROSION FOR BLACK, UNCOATED STEEL. ANCHORS ARE DESIGNED FOR 50-YEAR SCHEDULED SACRIFICIAL THICKNESS LOSS IN ACCORDANCE WITH ICC-ES AC358. INSTALLATION: SYSTEM TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. MINIMUM INSTALLATION PRESSURE IS TO BE DETERMINED BY THE FOLLOWING EQUATION: PUSH PIER INSTALLATION PRESSURE (PSI): [DESIGN LOAD] X 2 / [AREA OF HYDRAULIC RAM]. MINIMUM INSTALLATION DEPTH IS 10'-O" t UNO. NOTIFY ENGINEER IF MINIMUM INSTALLATION CONDITIONS CANNOT BE ACHIEVED. NOTIFY ENGINEER IF MINIMUM INSTALLATION CONDITIONS CANNOT BE ACHIEVED. EXISTING UTILITY LINES: CONTRACTOR TO REPAIR UTILITY LINES THAT MAY BE DAMAGED DURING INSTALLATION. SAFEBASE PUSH PIERS (CONT. PUSH PIER SPLICING: PILES ARE TO BE GRAVITY SPLICED WITH FITTING COUPLERS. BUILDING WEIGHT WILL ENSURE JOINTS DO NOT SEPARATE. TESTING & INSPECTION CONTINUOUS SPECIAL INSPECTION IS REQUIRED DURING INSTALLATION PER 2018 IBC SECTION 1810.4.12. THE SPECIAL INSPECTOR IS RESPONSIBLE FOR VERIFYING AND RECORDING THE FOLLOWING: • PROJECT DESCRIPTION (ADDRESS, INSTALLATION DATE, PERMIT NUMBER • PILE AND BRACKET CONFIGURATION • PART DESCRIPTION (PRODUCT MANUFACTURER, BRACKET TYPE, PIER TYPE, PIER OUTSIDE DIAMETER, PIER WALL THICKNESS) • PIER INCLINATION, LOCATION, DEPTH, AND INSTALLATION PRESSURE ACHIEVED EXPIRES: 12/24/24 LOAD TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM METHOD D1143 (QUICK METHOD) ON 20 PERCENT OF PIERS AND WILL BE SELECTED BY THE SPECIAL INSPECTOR. AN ALIGNMENT LOAD (AL) SHALL BE APPLIED TO THE PILE PRIOR TO SETTING THE DEFLECTION MEASURING EQUIPMENT TO ZERO OR A REFERENCE POSITION. THE AL SHALL BE NO MORE THAN 10% OF THE DESIGN LOAD. INCREMENTAL LOADING SHALL BE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. TEST LOADING SCHEDULE HOLD TIME MAX DEFLECTION AL (.10 DL MAX) 0 MIN. 0.25 DL UNTIL STABLE 0.50 DL UNTIL STABLE 0.75 DL UNTIL STABLE 1.00 DL UNTIL STABLE 1.25 DL UNTIL STABLE 1.50 DL HOLD FOR CREEP TEST (SEE BELOW) 0.04 INCHES 1.25 DL UNTIL STABLE 1.00 DL UNTIL STABLE 0.75 DL UNTIL STABLE 0.50 DL UNTIL STABLE 0.25 DL UNTIL STABLE LOAD TESTING CREEP ACCEPTANCE CRITERIA SHALL BE NO GREATER THAN 0.04 INCHES WITHIN A 10 MINUTE PERIOD. IF MOVEMENT IS OBSERVED GREATER THAN 0.04 INCHES WITHIN THE 10 MINUTE PERIOD THE LOAD TEST SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES, THE PIER IS TO BE DEEPENED AND RE -TESTED, OR THE PIER IS TO BE ABANDONED AND REPLACED WITH A NEW PIER. IF THE LOAD TEST IS TO BE HELD THE PIER MOVEMENTS SHALL BE MEASURED AT 15, 20, 30, 40, 50, AND 60 MINUTES. THE CREEP VERSUS THE LOGARITHM OF TIME SHALL BE PLOTTED. IF THE CREEP RATE IS LESS THAN 0.080 INCHES BETWEEN 6 AND 60 MINUTES, THE LOAD TEST SHALL BE CONSIDERED SUCCESSFUL. PUSH PIER TEST PRESSURE (PSI): [DESIGN LOAD] X 1.5 / [AREA OF HYDRAULIC RAM]. HELICAL PIER TEST PRESSURE (PSI): [DESIGN LOAD] X 1.5 / [AREA OF HYDRAULIC RAM]. DO NOT PLACE PIERS THIS ZONE W/0 DIRECTION DO NOT PLACE PIERS FROM ENGINEER THIS ZONE W 0 DIRECTION CONTRACTOR TO NOTIFY FROM ENGINEER FOR IF (E) FOUNDATION CRACK IS PRESENT IN THE SPAN BETWEEN FOUNDATION BRACKETS NO PIER PLACEMENT ZONE 1 SCALE: NTS 9f 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50) W1-8311 www.siatlg.tan CU J Z Q Z 0- IL LU Itr o Er C\1 Z j LU L rn U Q Q p 00 0 Z U)No N � W r Q w LL Z) U) RECEIV D May 03 2023 � s DEPARTMENT GENERAL NOTES REVISIONS PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: AD DATE: 05.01.2023 SHEET NO: S1.1 NCFI GEOTECHNICAL - TERRATHANE 24-010 POLYURETHANE FOAM INSTALLATION SEQUENCE THE FOLLOWING INSTALLATION STEPS PROVIDE A BROAD OVERVIEW OF TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM INJECTION BENEATH A CONCRETE SLAB OR PAVEMENT. INTERMEDIATE STEPS, INSTALLATION EQUIPMENT AND TOOLS USED, AND CONSIDERATIONS FOR UNUSUAL CONDITIONS OR APPLICATIONS ARE NOT ADDRESSED. STEP 1: ACCESS/APPLICATION HOLES ARE DRILLED (5/"O) AT STRATEGIC LOCATIONS IN THE SLAB. IN GENERAL, THE HOLES ARE SPACED 5 FEET APART AND 3 FEET FROM THE EDGES OF THE SLAB. LOCATIONS AND SPACING ARE OFTEN MODIFIED IN THE FIELD TO ACHIEVE THE DESIRED RESULT. STEP 2: INJECTION PORTS ARE PLACED TO SEAL THE HOLES. STEP 3: TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM IS INJECTED TO FILL VOIDS AND ALLOW FOR LIFTING. LIFT MAY BE MONITORED WITH SURVEY EQUIPMENT OR STRING LINES. STEP 4: THE INJECTION PORTS ARE REMOVED AND THE HOLES ARE PATCHED WITH MORTAR MIX, NEXUSPRO SILICONE JOINT SEALANT, OR EPDXY SEALANT. TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAMS ARE MOST OFTEN USED BENEATH EXTERIOR CONCRETE SIDEWALK AND PAVEMENT SECTIONS FOR STABILIZATION OR RELEVELING, BUT ARE ALSO UTILIZED FOR INTERIOR WORK AND OTHER SPECIALTY APPLICATIONS. TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM IS OFTEN CONSIDERED AS AN ALTERNATIVE TO MUDJACKING OR REMOVAL AND REPLACEMENT. SETTLEMENT OF RESIDENTIAL SLABS IS TYPICALLY THE RESULT OF CONSOLIDATION OF POORLY COMPACTED FILL SOILS AROUND FOUNDATIONS AND WITHIN UTILITY TRENCHES, SOFTENING OF WEAK NATIVE SOILS AND FILL DUE TO INCREASES IN MOISTURE CONTENT, AND EROSION OR WASHOUT CONDITIONS RESULTING FROM POOR DRAINAGE. CRACKED SLABS, FAULTING BETWEEN SLAB SECTIONS, AND/OR OTHER OBVIOUS DOWNWARD VERTICAL MOVEMENT ARE TYPICALLY THE FIRST OBSERVABLE SYMPTOMS OF SETTLEMENT FROM THE SURFACE, THOUGH VOIDS MAY ALSO BE PRESENT BELOW AS RIGID SLABS CAN SPAN BETWEEN SUPPORT POINTS. WHEN VOIDS ARE PRESENT, USING INERT, HYDROPHOBIC TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM ALLOWS FOR UNDERSEALING OF THE REGION, PREVENTING ANY FURTHER WASHOUT AND ACTING TO AGAIN PROVIDE UNIFORM SUPPORT TO THE BRIDGED CONCRETE. WHEN SLABS HAVE SETTLED, WITH OR WITHOUT THE PRESENCE OF VOIDS, FOAM CAN BE INJECTED TO CREATE LIFT WITHOUT ADDING SIGNIFICANT WEIGHT TO THE UNDERLYING SOIL. TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM IS INSTALLED WITH CUSTOM—BUILT INSTALLATION RIGS AVAILABLE AS TRUCK —MOUNTED OR TRAILER UNITS. THE BASIC COMPONENTS OF THE SYSTEM INCLUDE MATERIAL STORAGE TANKS, A GENERATOR, AN AIR COMPRESSOR, PUMPS, A PROPORTIONER, AND APPLICATOR(S)/ GUN(S). THE PROPORTIONER INCLUDES A MATERIAL HEATER, PRESSURE REGULATOR, STROKE COUNTER, AND INSULATED AND HEATED HOSES. THIS ENSURES THAT THE TWO PARTS ARE DELIVERED TO THE APPLICATOR AT A CONSISTENT PRESSURE AND TEMPERATURE. TERRATHANE GEOTECHNICAL - 24-010 POLYURETHANE FOAM TABLES COMPONENT PROPERTIES COMPONENT B-24-010 A2-000 BROOKFIELD VISCOSITY AT 72°F 600 CPS AT 72°F 200 CPS AT 72°F SPECIFIC GRAVITY 1.08 1.24 WEIGHT PER GAL 8.9 LBS 10.3 LBS APPEARANCE CLEAR AMBER LIQUID CLEAR BROWN LIQUID STORAGE TEMPERATURE 60°-90°F 60°-90°F TERRATHANE GEOTECHNICAL - 24-010 POLYURETHANE FOAM TABLES (CONT. REACTIVITY AT 110°F CREAM TIME (SEC) 1 GEL TIME SEC 7 TACK FREE TIME SEC 12 RISE TIME SEC 17 PROCCESSING PARAMETERS ISO TEMPERATURE 100°-140°F POLY TEMPERATURE 110°-1407 MIXING PRESSURE STATIC 1000 PSI MIXING PRESSURE DYNAMIC 800 PSI MIX RATIO BY WEIGHT 100 PARTS POLY: 116 PARTS ISO BY VOLUME 100 PARTS POLY: 100 PARTS ISO NOTE: INSTALL PER MFR RECOMMENDATIONS EXPIRES: 12/24/24 PHYSICAL PROPERTIES PHYSICAL PROPERTIES TEST METHOD FREE RISE RESTRAINED DENSITY ASTM D1622 2.8 PCF 3.9 PCF COMPRESSIVE STRENGTH ASTM D1621 25.7 PSI 60.5 PSI COMPRESSIVE MODULUS ASTM D1621 695 PSI 1714 PSI TENSILE STRENGTH ASTM D1623 64.5 PSI 78 PSI TENSILE MODULUS ASTM D1623 96 PSI ------ WATER ABSORBTION ASTM D2842 < 0.08 Ib%tq < 0.08 Ib%t= CLOSED CELL CONTENT — — — — — — — > 90% > 90% MAX SERVICE TEMP — — — — — — — 1807 1807 ELONGATION ASTM D1623 7.0% ------ SHEAR STRENGTH ASTM C273 38.7 PSI SHEAR MODULUS ASTM C273 486 PSI FLEXURAL STRENGTH ASTM D790 57.8 PSI ------ FLEXURAL MODULUS I ASTM D790 1279 PSI I — — — — —— SFA Design Group, LLF_ STRUCTURAL ENGINEERING p: (SOJ) 311 ww�v.5ledq ct \ U J J Q Z 0— O_ Lu r o o z � LLJ � rn O U Q QZ 2 pcc) 0 Z ud N O W CV cr r Q O � w LL D LU >U) ZECEIV D May 03 2023 WF„F s DEPARTMENT GENERAL NOTES REVISIONS PROJECT NO: M FR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S1.2 SAFEBASE STABILIZER SYSTEM INFO PART DESCRIPTION COMMENTS MIN YIELD STRESS, Fy MIN TENSILE STRESS, F. TOP It11/ ASTM A36 R /2x6x0'-6" W/ (4) /g" 0 HOLES W/ WELDED WOOD BEAM 36 KSI 58 KSI "Dx1 1/ " IPS SCH 40 ASTM A53 PIPE CONDITION 30 KSI 48 KSI 11/40"-7x12" ASTM A193 GRADE B7 THREADED ROD W/ THREADED ROD 11/ 0"-7 ASTM A194 GRADE 2H HEX NUT 75 KSI 125 KSI HSS 4x4x3/16x0'-4" ASTM A500 GRADE B/C HD GALV PER ASTM 50 KSI 65 KSI THREADED CAP A123 W/ WELDED R3/4x4xO'-4" ASTM A36 & 11/4"0-7 ASTM 194 36 KSI 58 KSI GRADE 2H HEX NUT R1/4X6X0'-6" ASTM A36 W/ (2) HOLES W/ WELDED HSS 36 KSI 58 KSI BASE 4x4x3/16xO'-2" ASTM 500 GRADE B/C HD GALV PER ASTM A123 50 KSI 65 KSI 3/16" HIGH DENSITY POLYETHYLENE SHELL (21 "SQ BASE) LIGHTFOOT 15 PCF POLYURETHANE (F'c=470-510 PSI) 3.375 KIPS MAX BASE 10 PCF POLYURETHANE (F'c=285-310 PSI) 3.5 PCF POLYURETHANE (F'c=55-60 PSI) ASTM A500, GRADE B/C HD GALV, PER ASTM A123 MAIN TUBE HSS 31/2x31/2x11 GA 50 KSI 65 KSI NOTE: INSTALL PER MFR RECOMMENDATIONS EXPIRES: 12/24/24 mfa 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50)W1-8311 wwwniatlg— J J Z_ Q Z 0— IL w c O Er 0 o Z j Lu00 U Q Q Wcoo0 p Z Fn N o N � r Q Q W L.L � U) ZECEIV D May 03 2023 s DEPARTMENT GENERAL NOTES REVISIONS PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S1-3 LINE OF (E) DECK ABOVE 1-1 PIER SCHEDULE MARK PIER DESIGN INSTALLATION INSTALLATION TYPE LOAD PRESSURE/TORQUE DEPTH OPUSH 8,929 LBS 2,000 PSI 10'-0" PIER ' OPUSH 11,374 LBS 2,400 PSI 10'-0" PIER ' 50'-6" 10'-6" 16'-6" 23'-6" I I I I 2'-6" 5'-0" 2'-0» o N 6 �71 N I I I � �gl 5 i (E) CONC PATIO CD N - SLAB ON GRADE o N 2 S4.2co 3 ' I _ I 1 S4.2 TYP g cn 11 �121 L6x6x3/gx3'-O" --� TYP I I I I I r"=----- 10 ---: 3'-10» 17P-9$ 2 S4.3 TYP 5 -5" 5'-5" 10'-9" I,'. 11 13 Wi N ` 14 (E) CONC SLAB I'r ON GRADE Q-(E) CRAWL SPACE ACCESS y' I QO (E) CHIMNEY II I� o ...:...:...... . =1 (E) CRAWL ..'F — o-----------..�. SPACE N 16 _> (E) CONC SLAB I 2 N 1 ON GRADE I> _ -- 1 S4.3 TYP 1 2'-0'> (E) FRONT PORCH UP I LJ 1 /1 I 1 I'I 1= II I (E) FDN/(N) PUSH PIER/(N) STABILIZER LAYOUT PLAN SCALE: 1/8"=1 '-0" EXPIRES: 12/24/24 (E) FOUNDATION/(N) PUSH PIER/(N) STABILIZER LAYOUT PLAN NOTES: 1. REFERENCE S1.1, S1.2, & S1.3 FOR GENERAL REQUIREMENTS 2• CONTRACTOR TO NOTIFY ENGINEER OF RECORD OF DISCREPANCIES BETWEEN FIELD CONDITIONS & THOSE SHOWN IN THESE DOCUMENTS PRIOR TO WORK TYP 3• INDICATES (E) CONC STEMWALL ON (E) CONC FOOTING (CONTRACTOR TO VERIFY 6"Wx2'-6"H (E) CONC STEMWALL AND 1'-0"Wx6"DP (E) CONC FOOTING MIN TYP (NOTIFY ENGINEER OF RECORD IF FIELD CONDITIONS DIFFER IN THE AREA OF WORK)) 4. ® INDICATES (E) WOOD POST/COLUMN 5• INDICATES (N) POLYURETHANE BACKFILL PER DETAILS 2/S4.2, 1 /S4.3, 2/S4.3, & 1 /S4.4 ((5) TOTAL) 6. X/SX.X SECTION CUT - DETAIL NUMBER/SHEET NUMBER 7• [__; INDICATES LOCATION OF SAFEBASE 288 PUSH PIER W/ LIGHT DUTY FOUNDATION BRACKET PER DETAILS ON S4.1 ((18) TOTAL) PUSH PIER INSTALLATION NOTES: • 2.875"0 PIPE PILE W/ 0.165" THICK WALL • 3.5"0x36" LONG PIPE SLEEVE W/ 0.220" WALL • MINIMUM 1/4" FOUNDATION LIFT DURING INSTALLATION 8. ® INDICATES LOCATION OF SAFEBASE FLOOR STABILIZER SYSTEM W/ LIGHTFOOT FTG ((3) TOTAL) DESIGN LOAD = 3,259 LBS g. PIER SPACING SHALL BE AS INDICATED ON PLAN 10. STABILIZER SPACING SHALL BE AS INDICATED ON PLAN 11. REPLACE "IN -KIND" ALL (E) WOOD MEMBERS (JOISTS, PURLINS, SUBPURLINS, SHEATHING, STUDS, WALL PLATES) WHICH SHOW SIGNS OF DRY ROT OR STRUCTURAL DAMAGE 12. CONTRACTOR TO NOTIFY ENGINEER OF RECORD IF (E) FOUNDATION CRACK IS PRESENT IN THE SPAN BETWEEN FOUNDATION BRACKETS 13. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY SHORING 14. CONTRACTOR SHALL NOT REMOVE ANY (E) POSTS OR PRE -CAST FOOTINGS SUPPORTING THE (E) FLOOR FRAMING 15. ALL FASTENERS AND HARDWARE IN CONTACT W/ PT WOOD, CONCRETE OR MASONRY SHALL BE HOT -DIPPED ZINC -COATED GALVANIZED STEEL OR STAINLESS STEEL 16. FILL ALL VISIBLE CRACKS IN THE FOUNDATION WALL WITH HYDRAULIC CEMENT OR EPDXY 17 ALL CONSTRUCTION MATERIALS IN THESE DOCUMENTS ARE (N) UNO 18. PROVIDE SAFEBASE 2.5 STRUCTURAL LIFTING FOAM OR EQUIVALENT PER CONTRACTOR AS REQ'D. REF DETAILS 2/S4.4 & 1 /S4.5 mfa 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50)W1-8311 wwwniatlg— CU o J Z_ Q Z 0- IL LI °C o Er 0 c\l Z j Lu rn c) 'a Q pcoo0 Z wNO 5 cc r 0 H W LL Z) W U co CEIVED May 03 (E) FI �T,QMN/ (N) PUSH PIER/(N) STABILIZER LAYOUT PLAN [REVISIONS 1 PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S2.1 1 S4.1 OPP (�/HOLES/ + _ TYP HOLE TYP ----- 2%„ 1 S4.1 S B-LD BRACKET - TOP 1" 7/8"0 HOLE TYP TYP �_/R/PIPE/HOLES —N—( + LINE OF �- 35/g"0 HOLE SYMMETRY 5 BEYOND ' EA SIDE OF R \_31/2"ox0.31"x0'-1/2" 3/16 1 _2 1 PIPE EA SIDE OF It 1 S4.1 LINE OF _ o' SYMMETRY d TYP 0 $ 0 + 9/16 HOLE ce TYP %" i I I i — TYP I I I 1 BEYOND 6 t8,. 5 NOTES, REF 1 /S4.1 FOR MATERIALS LIST SB-LD BRACKET - FRONT SCALE: 11/2"=1 '-0" SAFEBASE-LD FOUNDATION BRACKET MATERIALS LIST ITEM # PART DESCRIPTION DIMENSIONS GRADE 1 MAIN R R3/4x5x0'-93/4" A36 2 SEAT R R1/4x10x0'-10" A36 3 BACK R V/4x7x0'-10" A36 4 TOP R V/4x4x0'-81/2" A36 5 STRAP BENT R3/gx3x2'-O" A36 6 MAIN TUBE * PIPE 4"0X0.188XO'-9" A500 7 ALL THREADED RODS (2x) 3/4"ox1'-0" A193 8 THREADED HEX NUTS (4x) - A193 9 PUSH PIER SHAFT * PIPE 2.875"0x0.188x4'-O" A500 10 PUSH PIER EXTERNAL SLEEVE ** PIPE 3.5"Ox0.220x3'-0" A500 11 CONNECTOR * PIPE 2.5"OX0.188X0'-6" A500 12 FRICTION REDUCER * PIPE 3"0X0.188XO'-1" A53 * DIMENSIONS GIVEN AS OUTER DIAMETER x WALL THICKNESS x LENGTH ** EXTERNAL SLEEVE ALSO AVAILABLE IN 48" LENGTH 1 S4.1 d 0II / 10 NOTES: REF 1 /S4.1 FOR MATERIALS LIST SB-LD BRACKET - SIDE SCALE: 11/2"=1'-O" 0- 0 �r cn 9f 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50)W1-8311 wwwniatlg— EXPIRES: 12/24/24 U J Z_ Q Z 0- IL w c O Er O Z j Lu 00 c)a� Q pcoo0 Z U)NN O W 1 Z) fr T Q SCALE: 11/2=1 °-0" w LINE OF f`\/L I L I r•Tr1\ NOTES: REF 1/S4.1 FOR MATERIALS LIST SB-LD BRACKET - BACK U- i- _ U 1 /S4.1 >07 CEIVE D May 03 2023 Q1201-0s DEPARTMENT BRACKET DETAILS "0 HOLE SCALE: 11/2"=1'-O" 1 REVISIONS PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S4.1 (E) WALL SHEATHING (E) DECKING AS OCCURS (E) DECK FRAMING AS OCCURS-, (E) EXTERIOR SURFACES ((E) EXTERIOR GRADE AS OCCURS) a 4. 4. (E) CONC FOOTING (CHIP FLUSH W/ STEMWALL AS REQ'D STEEL ANGLE LEDGER PER PLAN - FOUNDATION BRACKET PER PLAN DIRECT INJECTION POLYURETHANE PER PLAN (E) WALL FRAMING (E) FLOOR SHEATHING (E) FLOOR FRAMING (PARALLEL AS OCCURS) (E) CONC STEMWALL (E) INTERIOR GRADE SAFEBASE PUSH PIER & EXTERNAL SLEEVE PER PLAN NOTE: REF PLAN FOR LAYOUT & INSTALLATION REQ'S (N) PUSH PIER TO (E) FOUNDATION DETAIL SCALE: 1 "=1'-0" (E) WALL SHEATHING (E) EXTERIOR SURFACES (SAWCUT REQ'D) ((E) EXTERIOI GRADE AS OCCURS) DIRECT INJECTION POLYURETHANE PER PLAN 0 I N 9f 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50) W1-8311 www.siatlg.tan (E) WALL FRAMINq EXPIRES: 12/24/24 U J (E) FLOOR SHEATHING J o Z_ Q Z 0- IL W c o o o z j Lu Lu � (E) FLOOR FRAMING O U Q < (PARALLEL AS OCCURS) Q co ( E) CONC STEMWALL p 0 Z F15 N O W N (E) INTERIOR GRADE 5 pC r O H Lu :III —ICI —ICI —ICI; =1 I I —III —III —I � _ w 0 (E) CONC FOOTING (CHIP FLUSH W/ C E IV D L-) STEMWALL AS REQ'D) May 03 2023 II —STEEL ANGLE LEDGER PER PLAN —FOUNDATION BRACKET PER PLAN POLYURETHAN BACKFILL CENTERED ON PIER TUBE INSTALLED FLUSH W/ FOUNDATION BRACKET AS OCCURS �- SAFEBASE PUSH PIER & EXTERNAL NOTE: SLEEVE PER PLAN REF PLAN FOR LAYOUT & INSTALLATION REQ'S (N) PUSH PIER TO (E) FOUNDATION DETAIL SCALE: 1 "=1'-O" DEPARTMENT PUSH PIER DETAILS [REVISIONS 1 PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S4.2 (E) WALL SHEATHING (E) WALL FRAMING DIRECT INJECTION POLYURETHANE PER PLAN (E) WALL FRAMING (E) FLOOR � (E) WALL SHEATHING f FINISHES TYP (E) INTERIOR GRADE ---,\ DIRECT• POLYURETHANE C) CN Y` POLYURETHANE BACKFILL CENTERED ON PIER TUBE INSTALLED FLUSH W/ FOUNDATION BRACKET AS OCCURS SAFEBASE PUSH PIER & EXTERNAL SLEEVE PER PLAN NOTE: REF PLAN FOR LAYOUT & INSTALLATION REQ'S (N) PUSH PIER TO (E) FOUNDATION DETAIL SCALE: 1 "=1'-0" r—(E) CONC STEMWALL �l (E) INTERIOR SLAB °.a, ON GRADE a. — — °° ° III-IIIIIIIII- °° m"shm SFA Design Group, LLF_ STRUCTURAL ENGINEERING p: (SOJ) 311 ww�v.5ledq c— \ EXPIRES: 12/24/24 J J Z Q Z Li. 0- Lu m o o Z �rn Z) LLJ O vQ< Lu 2 Q p cc) 0 Z U) N N O /W/.�� LL T Q O w L IX d °— . d III = (E) CONC FOOTING III =1I= (CHIP FLUSH W/ w U =III - STEMWALL AS REQ D) STEEL ANGLE LEDGER CE IVE D PER PLAN May 03 2023 I X. FOUNDATION BRACKET PER PLAN S DEPARTMENT PUSH PIER DETAILS 1'-6" O POLYURETHANE BACKFILL CENTERED ON PIER TUBE INSTALLED FLUSH W/ FOUNDATION BRACKET AS OCCURS SAFEBASE PUSH PIER & EXTERNAL SLEEVE PER PLAN NOTE: REF PLAN FOR LAYOUT & INSTALLATION REQ'S (N) PUSH PIER TO (E) FOUNDATION DETAIL SCALE: 1 "=1'-0" REVISIONS PROJECT NO: M FR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S4.3 DIRECT INJECTION o POLYURETHANE PER PLAN I N (E) WALL SHEATHING - -,j (E) WALL FRAMING 1'-6"O STEEL ANGLE LEDGER PER PLAN FOUNDATION BRACKET PER PLAN POLYURETHANE BACKFILL CENTERED ON PIER TUBE INSTALLED FLUSH W/ FOUNDATION BRACKET AS OCCURS SAFEBASE PUSH PIER & EXTERNAL SLEEVE PER PLAN NOTE: REF PLAN FOR LAYOUT & INSTALLATION REQ'S (N) PUSH PIER TO (E) FOUNDATION DETAIL SCALE: 1 "=1'-0" 9f 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50) W1-8311 www.siatlg.tan EXPIRES: 12/24/24 U J Z Q Z 0- IL LJJ c o W Er N PER PLAN PER PLAN Z fn co (E) CONC WALL MIN O LI > Q STEMWALL TYP _ U Q ?> o o o o Z 2 iw :rt r r r r I Z o �coz :z..4 N CC 17 -7 --7 W LLJ � T G ° N / O (E) CONC FOOTING TYP w L.L z) PIER SYSTEM �- PER PLAN TYP uJ U LLJ 1 S4.5 I CEIV D o May 03 2023 DIRECT INJECTION .. DEPARTMENT POLYURETHANE PER °' z GENERAL NOTES TYP DETAILS I -"O// REVISIONS NOTE: REF 1 /S4.5 FOR ADD'L INFO TYPICAL DIRECT INJECTION VOID FILL PLAN SCALE: 1/2"=1'-0" PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S4.4 (E) WALL SHEATHING — (E) EXTERIOR SURFACES (SAWCUT AS REQ'D) ((E) EXTERIOR GRADE AS OCCURS) E CONC S EMWALL IIMlII 4 G (E) CONC a ° FOOTING_ I- (E) WALL FRAMING (E) GARAGE CONC SLAB ON GRADE 5/g"0 HOLE DRILLED FOR INJECTION OF POLYURETHANE °a. AIL DIRECT INJECTION POLYURETHANE VOID FILL NOTES: 1. REF PLAN FOR LAYOUT & INSTALLATION REQ'S 2. PUSH PIER AS OCCURS NOT SHOWN FOR CLARITY (N) POLYURETHANE VOID FILL DETAIL SCALE: 1 "=1'-0" EXPIRES: 12/24/24 (E) FLOOR SHEATHING (E) FLOOR FRAMING TYP --(E) FLOOR BEAM (41/2"W MIN) "TOP PLATE PER GENERAL NOTES W/ (4) #9X3" WOOD SCREWS �— THREADED ROD PER GENERAL NOTES THREADED CAP PER GENERAL NOTES MAIN TUBE PER GENERAL NOTES LIGHTFOOT FOOTING PER PLAN & GENERAL NOTES (E) INTERIOR GRADE A IP1T r-n. 1. REF PLAN FOR LAYOUT & INSTALLATION REQ'S 2. INSTALL PER MFR RECOMMENDATIONS LF STABILIZER IN CRAWLSPACE SCALE: 1 "=1 '-O" 9f 5FA Design Group, LLr STRUCTURAL ENGINEERING p: (50) W1-8311 www.siatlg.tan CU J J Z Q Z 0- IL Lu c o Er 0 o 00 Z j Lu Lu 05 U Q Q Wcoo0 p Z wN0 O N o L.L Z) uj U co ECEIV D May 03 2023 DEPARTMENT DETAILS [REVISIONS 1 PROJECT NO: MFR23-037 DESIGNED BY: JB DRAWN BY: BR CHECKED BY: JLD DATE: 05.01.2023 SHEET NO: S4.5