131 Skyline Utilities - As Built (2)�-i r_` 11.1,90 ENGINEERING CIVIL SITE DESIGN PO Box 171 Edmonds, WA 98020 206.419.0873 CATCH BASIN RIM=345.48 " RCP(E)IE=343.13 / H c4 2 SECTION PER C I DET GU-4�0 (TYP I I i I CONNECT FD DOWNSTREAM OF DETENTION SYSTEM I OC A� tL #1.0 FLOW ONTROL UCTURE I RIM .30 RISER OVf�RFL W 353.94 IIE A0.94 (8") IF 35b.94 (36") I II SSCO W/ 112" LAMPHOLE COVER W/ 1 /"'k HE� BOLTS AND A CONdRETE1 COLLAR RIM 353.95 Ifs 349.74 NEW SS I LATERAL CONNECTION TO TOP OF SS 3 MAIN PER COE ISTD DET c4.2 IE ISS-202 342.7t (6" �S MAIN) FIELD VERIFY SS MAIN IE MIN 2 WKS kIOR TO CONSTRUCTION SS EASEMENT I' ' AFN #i135318 AREA'DRAIN #3 I' 65.17 IIE 3 3.0 (6") 50 LF 6� SD 2% MIN I I AREA DRAIN '2 367. 0 IE .43 (6`) �\ LF 6" V S 16 1.5% � I I\ I I \ I I h I I I II I I I II \ I I� I I� I II I II I� AREP 6R IN #1 IMI 67.20 IE 3 5l0 (6") II I II II I li I I I I SET REBAR & CAP LS 31976 1 I I I I SSMH RIM=350.45 IE=342.15 CB #3.0 ON EX 12" SD MAIN sRIM 353.00 / 49.94 (8") \ IE 348. I I I I JS s5 / \ FOUND MONUMENT FOUND MONUMENT 3" SURFACE MTD BR. SS W/CUT CROSS ' CONNECT A ST 1' 1 r SS. / ABOVE $PRINGLINE USING,fLEXIBLE I CONNE�TOR \�L PROVIDE TRA CONTROL LAN HffWPO sD I ft0g1 BRL NE FOR DET TANK EXCAVATIONi\ ,1202 3" SURFACE MTD BR. W/CU CROSS 0 SDMH a RIM=373.98 SS (W)IE-369.481 (N)IE=369.3J III SET BRA,SS DISK LS 319716 I I \ SSMH RIM=377.22 IE=366.97 SET 3RASS IbISK LS 3 1976 CH BA IN =376.5 RCP IE 372.811 U) (N 1...M IET 3RASS [ISK LS 3 1976 C0 ZE Z_ FEM 10 0 10 SCALE: 1 " = 10' Datum NAVD 88 Section, Township, Range NE 1/4, SE 1/4 SECTION 26, TOWNSHIP 27 N, RANGE 3E, WM Legend AREA DRAIN PERF UNDER -DRAIN/ 0 PATIO DRAIN FOOTING DRAIN 6" SANITARY SIDE SEWER PVC ---- CB TYPE 1 PER COE STD SDR 35 W/ GASKETED FITTINGS 'I DET SD-303 WATER SERVICE LINE CB TYPE 2 FLOW < ! CONTROL STRUCTURE - - - ELECTRICAL SERVICE LINE - - - TELECOM SERVICE LINE 6 SD OR SS CLEANOUT - -- -- -- -- PVC STORM DRAIN 4" @ 2% MIN GAS SERVICE LINE ����--- PVC STORM DRAIN 6" & UP RETAINING WALL Notes 1. SEE SHEET C1.0 FOR GENERAL NOTES. 2. SEE COE STD DET GU-400 FOR TYPICAL ROW TRENCH SECTION, DETAIL 2/C4.2. 3. VERIFY LOCATION AND INVERTS OF ALL EX SYSTEMS AT PROPOSED POCs TO NEW LINES PRIOR TO CONSTRUCTION OF ANY NEW PIPING, AND NOTIFY ENGINEER OF ANY DISCREPANCIES AT LEAST 4 WORKING DAYS PRIOR TO STARTING PIPE LAYING OPERATIONS. 4. MAINTAIN ALL EXISTING UTILITY SERVICES DURING CONSTRUCTION. PROVIDE TEMPORARY SERVICES AND ALL BYPASS SYSTEMS, INCLUDING PUMPING, AS NECESSARY TO ACCOMPLISH NEW CONSTRUCTION AND MINIMIZE SERVICE INTERRUPTIONS. 5. PLACE STORM DRAINS AND SANITARY SEWERS AT A MINIMUM SLOPE OF 2% AND A MAXIMUM SLOPE OF 50% UNLESS NOTED OTHERWISE. 6. COORDINATE BLDG SYSTEM CONNECTION LOCATIONS AND IEs W/ MECH/PLUMBING CONTRACTOR. PROVIDE ALL REQUIRED FITTINGS FOR CONNECTION. 7. COORDINATE ALL UTILITY INTERRUPTIONS W/ AFFECTED FACILITY OWNERS. PROVIDE MIN 2 WEEKS ADVANCE NOTICE OF ANY SERVICE INTERRUPTION. SEE ALSO COE GENERAL NOTE #29. 8. CONFIRM THAT ALL UNDERGROUND UTILITY SYSTEMS ARE INSTALLED AND FUNCTIONAL PRIOR TO PAVING. 9. WHERE A NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 10. ADJUST ALL NEW AND EX UTILITY CASTINGS TO FINAL FINISHED GRADE PRIOR TO FINAL PAVING/PLANTING. 11. TAKE THE NECESSARY PRECAUTIONS DURING TRENCH EXCAVATION TO PROTECT EXISTING UTILITIES FROM DAMAGE AND SETTLEMENT. 12. PROVIDE 2.5' MIN COVER OVER ALL WATER LINES, UNLESS NOTED OTHERWISE. 13. PROVIDE HERRINGBONE GRATES ON ALL CBs UNLESS NOTED OTHERWISE. 14. A MINIMUM OF 2' OF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVABLE SURFACES AND 1' OF COVER UNDER LANDSCAPED AREAS. 15. IF THE RIM TO IE EXCEEDS 5' THEN A TYPE II MANHOLE WILL BE REQUIRED. 16. A MINIMUM OF 3' HORIZONTAL SEPARATION IS REQUIRED BETWEEN THE DRY UTILITIES (POWER, GAS, PHONE, CABLE, ETC.) AND SEWER, WATER, AND STORM AND 5' FROM ANY CITY MAIN LINES. Construction Sequence (COE) 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 FIR) NOTICE IS REQUIRED. 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. COMPOST AMEND AND REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 10. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. APPROVED FOR CONSTRUCTION CITY OF EDMONDS 6/22/22 Call Before You Dig! 811 Rev # Date Description 1 10/18/21 CN #1 2 12/21/21 CNI #2 3 .......................................................................................................... 2/23/22 Wall Revision 4 .......................................................................................................... .......................................................................................................... .......................................................................................................... 6/22/22 SD Revision Sta10 Project #: 21 01 3 Submittal: Construction Documents Eastman King Residence 131 Skyline Dr Edmonds, WA 98020 Owners: Sue Eastman King and Gerald King Design: Sheet: Drainage and Utility Plan DATE: CITY ENGINEERING DIVISION C2nO