APPROVED BLD RESUB1 BLD2021-0895+SPECIAL INSPECTION FORM+10.31.2021_10.56.47_AM+2492737RESUB BLD2021-0895
Nov 01 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Of ED4fU
SPECIAL INSPECTION AND TESTING AGREEMENT
Permit #: BLD2021-0895
est. 1s9° Project: Eastman and King, 131 Skyline Drive
Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Innspectors:
- s
The Special Inspection firm of C 2e) .S Gf�- rj -�- will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
Reinforced Concrete
Bolting in Concrete
Prestressed Concrete
Shotcrete
— Structural Masonry
_Structural Epoxy
_ High Strength Bolting
Spray applied Fireproofing
_ Smoke Control Systems
_ Lateral Wood
Structural Observation by design professional
X Soils
X Installation and construction of the
Block Wall
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and fine must be submitted. The resume must show that the inspector
and the firm are qualified by education and experience to perform the work and testing required by the project
design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any
nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be
detailed in the final report.
Contractor:
\\edmsvr-userfsluserprolS\dakauOesktop\Comurents Letters and Special Inspection forms 2019\Special Inspection fbrms\SI 2021-0895 Eastman
and King.doc9110/2021
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Sue Eastman King Signature 0� lM�a" ' " Date 10/20/21
Contractor: L>A l( aL L $ (LCrt_— Signa ___--- Date:
-ATeh./En : David Bradley, P.E. 10/21/2021
g Signature Date:
Special Insp. � pt VW 'V Signature gx Date: (0
�t
Special Insp. Agency �rllJ ' S J ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION
By: W. W 47� Date: 12/7/2021
\ledmsvr-userfs%useiprofS\dakau\DesktoplCoimuents Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-0995 Eastman
and King.doc9/1012021
COBALT
G E 0 S C I E N C E S
Phil Haberman, PE, LG, LEG
Principal
Mr. Haberman specializes in geotechnical engineering, geology, and engineering geology and has extensive
experience with fluvial and hillslope geomorphology, geologic hazard analysis, subsurface investigations,
and retaining system design. Mr. Haberman has over 20 years of experience throughout the Pacific
Northwest conducting geotechnical investigations, geologic hazard evaluations, geologic mapping and
reconnaissance, retaining wall design, and construction oversight.
He has managed and led countless geotechnical projects involving roadways, industrial facilities, utility
construction, military installations and bunkers, schools, fire stations, as well as residential, mixed use, and
commercial developments; including mid to high rise buildings with multiple levels of below grade parking.
Phil has been involved in all types of geologic hazard analysis and mitigation, including slope stability
analyses, coal mine hazard/subsidence analyses, liquefaction and seismic hazards, and groundwater
mitigation. He has provided expert witness testimony, forensic evaluations, as well as shoring, gravity wall,
and reinforced retaining wall design and monitoring.
Mr. Haberman is involved in coordinating and supervising subsurface explorations, landslide evaluations,
forensic evaluations, infiltration analysis, construction monitoring and inspection, construction plan
preparation, specifications and bid document preparation; seepage analyses, and earth dam/levee and
embankment design.
EDUCATION
B.Sc. (Geological Sciences), University of Washington,
Seattle, Washington, 1997
LICENSES & CERTIFICATIONS
Profession Engineer — No. 54896
Licensed Geologist — No. 2513
Licensed Engineering Geologist — No. 2513
Certified Erosion and Sediment Control Lead (CESCL)
Cobalt Geosciences, LLC
P.O. Box 82243, Kenmore, WA 98028
cobaltgeo@gmail.com
PROJECT EXPERIENCE
Coal Creek Park, Bellevue, Washington
Conducted numerous geotechnical investigations for
the City of Bellevue and provided slope stability
analyses, erosion evaluations, and engineering design
parameters for use in the construction of numerous
bridges and rail systems in Coal Creek Park.
Determined setback requirements for bridge
abutments in an actively incising fluvial environment.
Provided coal mine subsidence analyses and slope
stability analyses for multiple projects within the
Bellevue Parks System.
Phil Haberman PE, LG, LEG
Principal
Proposed Hotels, Snoqualmie & Marysville, Washington
Prepared geotechnical investigations for new five story
hotels in Snoqualmie and Marysville, Washington.
Explored the subsurface soils using borings and test
pits and conducted an analysis of potential geologic
hazards and mitigation options. Provided foundation
and pavement design parameters along with
recommendations related to earthwork, grading,
infiltration, and utility placement.
Medical Office Building, Kent, Washington
Conducted a geotechnical investigation in an area with
high liquefaction potential for a new office building.
Drilled and sampled five borings as part of the seismic
analyses for use in foundation design consideration.
Recommended the use of compacted rock columns to
support the new building and reduce the potential
effects of liquefaction on the development.
Forensic Evaluation, Seattle, Washington
Evaluated the soil and groundwater conditions of a
three tier retaining wall system within a steep slope
and landslide hazard area. Conducted detailed slope
stability analyses to determine options to mitigate
local instability within the wall systems constructed in
the early 197o's.
Frances Anderson Center, Edmonds, Washington
Evaluated the soil conditions for a new open-air roof
structure. Determined foundation parameters for the
new stage and roof structure, as well as foundation
setback requirements from an adjacent concrete
retaining wall.
Cobalt Geosciences, LLC
P.O. Box 82243, Kenmore, WA 98028
cobaltgeo@gmail.com
Proposed Hotels, Vantage, Washington
Excavated numerous test pits within a 5 acre parcel to
determine depth to bedrock and fill thickness in the
area of an old fuel station. Provided a geotechnical
report detailing foundation design recommendations
and options for site grading to limit blasting of in situ
basalt.
Mercer Slough Boardwalk Trail, Bellevue, Washington
Conducted Cone Penetrometer analysis of a portion of
the Mercer Slough to determine depth to bearing soils
for pile support of a new boardwalk trail system.
Prepared a geotechnical analysis report for variable
diameter piles to support new bridges placed over 6o
to 8o feet of very soft peat deposits.
Port of Poulsbo Seawall Mitigation, Poulsbo,
Washington
Provided construction monitoring during fill removal
and dead -man anchor placement for updates to an
existing seawall. Evaluated soil conditions during
construction and provided recommendations to
minimize soil loss through the seawall due to tidal
fluctuations, groundwater, and surface water from
pervious pavements and rain gardens.