Loading...
APPROVED BLD2021-0895+Transportation_Impact_Form+7.12.2021_7.41.08_PM+2296446APPENDIX A of E DMo� Page 1 of 2 v o tp Transportation Impact Analysis 'nC. 18A0 Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project: Owner/Applicant Gerald and Sue King Name 8433 SE 62nd St Street/Mailing Address Mercer Island WA 98040 City Telephone: 206.230.9254 State Zip Applicant Contact Person: Name Street/Mailing Address City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: 1. PROJECT DESCRIPTION a. Location - Street address: 131 Skyline Drive, Edmonds, WA (Attach a vicinity map and site plan.) b. Specify existing land use: Single family home c. Specify proposed type and size of development: One residential unit (# of residential units and✓or square footage of building) d. Date construction will begin and be completed: e. Define proposed access locations: HANDOUT UPDATED 03.24.2021 APPENDIX A Page 2 of 2 £ Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X = New Use Fee: $ - Prior Use Fee: $ _ $ ' ® NEW DEVELOPMENT ITE Land Use Category New Use I 210 - S F R Per Unit Fee Rate $ 6249.14 1 X ❑ NO CHANGE ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfP, etc. 1 MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ 9/15/2021 City of Luiiiviiva, -L:...rjLjL.v%;;Ang Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 03.24.2021