BLD2021-0895+Soil Mngt+7.12.2021_7.41.04_PM+2296442Developing a Soil Management Plan — SECTION FIVE
Model SOIL MANAGEMENT PLAN for BMP T5.13
(available as MS Word file at www.SoilsforSalmon. org)
PROJECT INFORMATION Page # 2 of 3 pages
Complete all information on naLye 1: onlv site address and nermit number on additional napes.
Site Address / Lot No.: 7908 53rd Avenue W, Muliteo, WA 98275 -
Permit Type: Building Permit Permit Number:
Permit Holder: Phone:
Mailing Address: 9800 Harbour Place, Suite 205
Mukilteo, WA 98275
Contact Person: Fred Baxter, AIA Phone: 425-348-3975
Plan Prepared By: Chad Wichers -Studio 342 Landscape Architecture
ATTACHMENTS REQUIRED (Check off required items that are attached to this plan
X Site Plan showing, to scale: X Areas of undisturbed native vegetation (no amendment required)
X New planting beds and turf areas (amendment required)
X Type of soil improvement proposed for each area
NASo.l test results (required if proposing custom amendment rates)
NAProduct test results for proposed amendments
AREA # 2 (should match Area # on Site Plan)
PLANTING TYPE Turf Undisturbed native vegetation
X Planting Beds Other:
SQUARE FOOTAGE OF THIS AREA: 23,092 square feet
SCARIFICATION
inches (depth) of scarification needed to achieve finished total 12" loosened depth.
Cnhenil will he ecarifierl
PRE -APPROVED
AMENDMENT METHOD:
$1inches of compost or imported topsoil applied
X 3_1 (conversion factor, inches to cubic yards)
PRODUCT: Cedar Grove 3-Way
X Topsoil import
24.8 = cu. yards per 1,000 sq. ft.
Topsoil Mix
Amend with compost
X 23,000s sq.ft. in this area
Stockpile and amend
570 = cubic yards of amendment — — — — —
QUANTITY: 570 CU. YDS.
cu. yds. stockpiled)
needed to cover this area to designated depth)
CUSTOM AMENDMENT
Attach test results and calculations.
Topsoil import
inches organic matter or topsoil import
PRODUCT:
Ton -nil k comnnat lift
X I 1
Amend
= cu. yards / 1,000 sq. ft.
Stockpile and amend
X ,000s sq.ft. in this area
cu. yds. stockpiled)
= cubic yards of amendment — — — — —
QUANTITY: CU. YDS.
MULCH
23,000 sq.ft.
PRODUCT: Cedar Grove Land. Mulch
X 6.2 (conversion, to give 2 inch mulch depth)
143 = cubic yards of mulch — — — --+ --+ --+
QUANTITY: 143 CU. YDS.
1 U I AL A1VIr:1NL1V1EN I / 1 )FNU1L/1VIULUH V UK ALL AKEAI (complete on page L only, totaling all areas/pages in this Ulan)
❑
Product #1:
❑ Quantity: cu. yds.
❑
Test Results: % organic matter
C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) Y "stable" (yes/no)
❑
Product #2:
❑ Quantity: cu. yds.
❑
Test Results: % organic matter
C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no
❑
Product #3:
❑ Quantity: cu. yds.
❑
Test Results: % organic matter
C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no
Date:
Inspector:
Approved:
Revisions Required:
Date:
Inspector:
Approved:
Revisions Required:
COMMENTS:
13
Developing a Soil Management Plan — SECTION FIVE
Model SOIL MANAGEMENT PLAN for BMP T5.13
(available as MS Word file at www.SoilsforSalmon. org)
PROJECT INFORMATION Page # 2 of 3 pages
Complete all information on naLye 1: onlv site address and nermit number on additional napes.
Site Address / Lot No.: 7908 53rd Avenue W, Muliteo, WA 98275 -
Permit Type: Building Permit Permit Number:
Permit Holder: Phone:
Mailing Address: 9800 Harbour Place, Suite 205
Mukilteo, WA 98275
Contact Person: Fred Baxter, AIA Phone: 425-348-3975
Plan Prepared By: Chad Wichers -Studio 342 Landscape Architecture
ATTACHMENTS REQUIRED (Check off required items that are attached to this plan
X Site Plan showing, to scale: X Areas of undisturbed native vegetation (no amendment required)
X New planting beds and turf areas (amendment required)
X Type of soil improvement proposed for each area
NASo.l test results (required if proposing custom amendment rates)
NAProduct test results for proposed amendments
AREA # 2 (should match Area # on Site Plan)
PLANTING TYPE Turf Undisturbed native vegetation
X Planting Beds Other:
SQUARE FOOTAGE OF THIS AREA: 23,092 square feet
SCARIFICATION
inches (depth) of scarification needed to achieve finished total 12" loosened depth.
Cnhenil will he ecarifierl
PRE -APPROVED
AMENDMENT METHOD:
$1inches of compost or imported topsoil applied
X 3_1 (conversion factor, inches to cubic yards)
PRODUCT: Cedar Grove 3-Way
X Topsoil import
24.8 = cu. yards per 1,000 sq. ft.
Topsoil Mix
Amend with compost
X 23,000s sq.ft. in this area
Stockpile and amend
570 = cubic yards of amendment — — — — —
QUANTITY: 570 CU. YDS.
cu. yds. stockpiled)
needed to cover this area to designated depth)
CUSTOM AMENDMENT
Attach test results and calculations.
Topsoil import
inches organic matter or topsoil import
PRODUCT:
Ton -nil k comnnat lift
X I 1
Amend
= cu. yards / 1,000 sq. ft.
Stockpile and amend
X ,000s sq.ft. in this area
cu. yds. stockpiled)
= cubic yards of amendment — — — — —
QUANTITY: CU. YDS.
MULCH
23,000 sq.ft.
PRODUCT: Cedar Grove Land. Mulch
X 6.2 (conversion, to give 2 inch mulch depth)
143 = cubic yards of mulch — — — --+ --+ --+
QUANTITY: 143 CU. YDS.
1 U I AL A1VIr:1NL1V1EN I / 1 )FNU1L/1VIULUH V UK ALL AKEAI (complete on page L only, totaling all areas/pages in this Ulan)
❑
Product #1:
❑ Quantity: cu. yds.
❑
Test Results: % organic matter
C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) Y "stable" (yes/no)
❑
Product #2:
❑ Quantity: cu. yds.
❑
Test Results: % organic matter
C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no
❑
Product #3:
❑ Quantity: cu. yds.
❑
Test Results: % organic matter
C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no
Date:
Inspector:
Approved:
Revisions Required:
Date:
Inspector:
Approved:
Revisions Required:
COMMENTS:
13