Loading...
BLD2021-0895+Soil Mngt+7.12.2021_7.41.04_PM+2296442Developing a Soil Management Plan — SECTION FIVE Model SOIL MANAGEMENT PLAN for BMP T5.13 (available as MS Word file at www.SoilsforSalmon. org) PROJECT INFORMATION Page # 2 of 3 pages Complete all information on naLye 1: onlv site address and nermit number on additional napes. Site Address / Lot No.: 7908 53rd Avenue W, Muliteo, WA 98275 - Permit Type: Building Permit Permit Number: Permit Holder: Phone: Mailing Address: 9800 Harbour Place, Suite 205 Mukilteo, WA 98275 Contact Person: Fred Baxter, AIA Phone: 425-348-3975 Plan Prepared By: Chad Wichers -Studio 342 Landscape Architecture ATTACHMENTS REQUIRED (Check off required items that are attached to this plan X Site Plan showing, to scale: X Areas of undisturbed native vegetation (no amendment required) X New planting beds and turf areas (amendment required) X Type of soil improvement proposed for each area NASo.l test results (required if proposing custom amendment rates) NAProduct test results for proposed amendments AREA # 2 (should match Area # on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation X Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: 23,092 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Cnhenil will he ecarifierl PRE -APPROVED AMENDMENT METHOD: $1inches of compost or imported topsoil applied X 3_1 (conversion factor, inches to cubic yards) PRODUCT: Cedar Grove 3-Way X Topsoil import 24.8 = cu. yards per 1,000 sq. ft. Topsoil Mix Amend with compost X 23,000s sq.ft. in this area Stockpile and amend 570 = cubic yards of amendment — — — — — QUANTITY: 570 CU. YDS. cu. yds. stockpiled) needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Ton -nil k comnnat lift X I 1 Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area cu. yds. stockpiled) = cubic yards of amendment — — — — — QUANTITY: CU. YDS. MULCH 23,000 sq.ft. PRODUCT: Cedar Grove Land. Mulch X 6.2 (conversion, to give 2 inch mulch depth) 143 = cubic yards of mulch — — — --+ --+ --+ QUANTITY: 143 CU. YDS. 1 U I AL A1VIr:1NL1V1EN I / 1 )FNU1L/1VIULUH V UK ALL AKEAI (complete on page L only, totaling all areas/pages in this Ulan) ❑ Product #1: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) Y "stable" (yes/no) ❑ Product #2: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no ❑ Product #3: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no Date: Inspector: Approved: Revisions Required: Date: Inspector: Approved: Revisions Required: COMMENTS: 13 Developing a Soil Management Plan — SECTION FIVE Model SOIL MANAGEMENT PLAN for BMP T5.13 (available as MS Word file at www.SoilsforSalmon. org) PROJECT INFORMATION Page # 2 of 3 pages Complete all information on naLye 1: onlv site address and nermit number on additional napes. Site Address / Lot No.: 7908 53rd Avenue W, Muliteo, WA 98275 - Permit Type: Building Permit Permit Number: Permit Holder: Phone: Mailing Address: 9800 Harbour Place, Suite 205 Mukilteo, WA 98275 Contact Person: Fred Baxter, AIA Phone: 425-348-3975 Plan Prepared By: Chad Wichers -Studio 342 Landscape Architecture ATTACHMENTS REQUIRED (Check off required items that are attached to this plan X Site Plan showing, to scale: X Areas of undisturbed native vegetation (no amendment required) X New planting beds and turf areas (amendment required) X Type of soil improvement proposed for each area NASo.l test results (required if proposing custom amendment rates) NAProduct test results for proposed amendments AREA # 2 (should match Area # on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation X Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: 23,092 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Cnhenil will he ecarifierl PRE -APPROVED AMENDMENT METHOD: $1inches of compost or imported topsoil applied X 3_1 (conversion factor, inches to cubic yards) PRODUCT: Cedar Grove 3-Way X Topsoil import 24.8 = cu. yards per 1,000 sq. ft. Topsoil Mix Amend with compost X 23,000s sq.ft. in this area Stockpile and amend 570 = cubic yards of amendment — — — — — QUANTITY: 570 CU. YDS. cu. yds. stockpiled) needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Ton -nil k comnnat lift X I 1 Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area cu. yds. stockpiled) = cubic yards of amendment — — — — — QUANTITY: CU. YDS. MULCH 23,000 sq.ft. PRODUCT: Cedar Grove Land. Mulch X 6.2 (conversion, to give 2 inch mulch depth) 143 = cubic yards of mulch — — — --+ --+ --+ QUANTITY: 143 CU. YDS. 1 U I AL A1VIr:1NL1V1EN I / 1 )FNU1L/1VIULUH V UK ALL AKEAI (complete on page L only, totaling all areas/pages in this Ulan) ❑ Product #1: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) Y "stable" (yes/no) ❑ Product #2: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no ❑ Product #3: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for nativeplants) "stable" es/no Date: Inspector: Approved: Revisions Required: Date: Inspector: Approved: Revisions Required: COMMENTS: 13