Loading...
DO NOT ISSUE - APPROVED PLN RESUB2 BLD2021-0895+LANDSCAPE PLAN+12.27.2021_4.55.17_AM+2591941Eastman King Residence (6) t I i (1) Stev artia monadelpha Tall Stewartia Emerald Hills Community path (20' wide) I tw 354.80 I bw 354.30 tw 360.80 ! bw 355.00 tw 365.34 bw 361.00 110' sanitary sewer easement setback line 4' ht. max. horizontal wood fence atop retaining wall nati e low maintenance planting at b se of retaining wall 1 I building overhang 6' ht. retaining wall (typ.) Allan Block AB Europa collection tw 367.38 !! bw 361.00 4' ht. max. hdrizontal wood fence atop retaining wall Amelanchier 4nifolia 'Honeywood' Hone rood Serviceberry 1 (15) Thuja oc identalis 'Smaragd' Eme4d Green Arborvitae I tw 367.38 bw 361.00 tw 360.80 bw 355.00 I tw 354.80 bw 349.00 I IWIR [filLaTNTAX-1 LVV Uvv.v'-r bw 364.00 (5) propose', min. 1. 5" cal. Comus kousa 'Eddie's White Wonder' Eddie's White Wonder Dogwoo trees to eet City of Edmonds ode 23.10.06 .C.5 EWW D wood more disease r slsta than nati e species Comu N ttallii (Pacific Dogwoo ) (2) Pyrus ca letyana 'Glen's Form' TM Chanticle,er Callery Pear 12' utility easelinent stairs to main entry (2) Acerpal atum 'Sango Kaku' Coral Bark Japanese Maple 5' wide concr to walkway CE W Z J � CO concrete walkway and stairs ex. utility box s to remain trash & recyl containers concrete ret ining wall, see civil, typi hl nTF.q Planting Notes 1. Plant quantities listed on this sheet are total quantities for each species. See 1-2 for plant schedule and details. 2. Landscape Architect (L.A.) or Owner shall approve all plant material upon delivery. 3. Contractor to layout all plant material and get approval from L.A. prior to planting anything in the ground. 4. Plants shall meet the current American Standard for Nursery Stock and shall be healthy, vigorous and well -formed, with well -developed: fibrous root systems, free from dead branches or roots. Plants shall be free from damage caused by temperature extremes, lack of or excess moisture, insects, disease, and mechanical injury. Plants in leaf shall be well foliated and of good color. Plants shall be habituated to outdoor environmental conditions (hardened off) 5. Root balls of potted and balled and burlapped (B&B) plants must be loosened and pruned as necessary to ensure there are no encircling roots prior to planting. At least the top half of burlap and any wire straps are to be removed from B&B plants prior to planting, The plant should be completely vertical. The top of the root flare, where the roots and the trunk begins, should be about one inch from the surrounding soil Soils: 1. Incorporate 8" of 3-Way topsoil from Cedar Grove (or equal) tilled to a depth of 12'' to all planting areas & mounded to account for settling. 2. Install 2" top course of Cedar Grove Landscape Mulch (or approved equal) to all planting areas. Cedar Grove: (877) 764-5748 3. See soil management Plan (Sheet L-4) for specific soil placement instructions and designated areas 4. All disturbed soil areas to meet requirements as directed on Soil Management Plan to ensure compliance with BMP T5.13. Testing results and lading bills are required to be submitted to the City. Irrigation: 1. Contractor to design/build irrigation system to provide head to head coverage for all planting areas. See L-3 for Specifications 2. Irrigation water shall be applied with goals of avoiding runoff and overspray onto adjacent property, non -irrigated areas, and impervious surfaces. 3. Modified irrigation system to follow water conservation best management practices and include a rain sensor. Tree Removal: NOT APPLICABLE FOR THIS PROJECT. NO EX. TREES LOCATED ON SITE NO PROPOSED DISTURBANCE OF TREES OR NATURAL VEGETATION ON STEEP SLOPE AREAS. nL�0 4 8 16 SCALE-1 /8" = T-0" NORTH 129 Skyline Dr. Edmonds, WA 98929 a). landscape architecture p ❑ b ❑ x g 7 z edm❑nds • was hin9t❑n ■ 98020 p h o n e J f a x •( 2 o 6) 5 4 5 0 3 4 z w w w s t u d i 0 3 4 z c❑ m STATE OF WASH I NGTON REGISTERED LANDSCAPE ARCHITECT cs.r CHAD S. WICHERS CERTIFICATE No. 931 project number: 20211004 drawn: CSWIJMM checked: Studio 342 date issue 1 revision 03.08.21 Schematic Design 03.12.21 Revisions 03.24.21 Revisions 04.01.21 Revisions 05.20.21 Driveway Revisions 06.03.21 SMP 10.06.21 Wall Study 12.20.21 Permit Schematic Landscape Plan L-1 C) studio 342 Landscape Architecture, LLC CONCEPTUAL TREE SCHEDULE TREES CODE QTY BOTANICAL NAME E SAN 3 Acer palmatum 'Sango Kaku COMMON NAME SIZE CONTAINER REMARKS Sango Kaku Japanese Maple i' Ht. B&B Matched, Evenly Branched, Meets Nursery Quality Industry Standard, Stake per detail, typ. ACE JRD 8 Acer shirasawanum 'Jordan' Jordan Fullmoon Maple 8' Ht. B&B AME HON 6 Amelanchier alnifolia 'Honeywood' Honeywood Serviceberry 2" Cal. B&B COR EDD 5 Cornus kousa ' Eddie's White Wonder' Eddie's White Wonder Dogwood 8' Ht. B&B RU CHA 2 STE MON 1 Pyrus calleryana 'Glen's Form' TM Stewartia monadelpha CONCEPT PLANT SCHEDULE ORNAMENTAL PLANTING Festuca glauca 'Elijah Blue'/ Elijah Blue Fescue Kalmia latifolia 'Tiddlywinks' 1 Tiddlywinks Mountain Laurel Lysimachia nummularia / Creeping Jenny Miscanthus sinensis'Morning Light' I Morning Light Eulalia Grass Nandina domestica 1 Heavenly Bamboo Nassella tenuissima 'Pony Tails'/ Mexican Feathergrass Pieris japonica 'Prelude' 1 Prelude Japanese Pieris Pittosporum tobira 'Wheeler's Dwarf 1 Wheeler's Dwarf Pittosporum Rhododendron x 'Nestucca' I Nestucca Rhododendron Rubus pentalobus 'Emerald Carpet' / Bramble NATIVE REVEGETATION PLANTING Deschampsia cespitosa 1 Tufted Hair Grass Fragaria chiloensis J Beach Strawberry Mahonia nervosa 1 Oregon Grape Philadelphus lewisii I Wild Mockorange Polystichum munitum J Western Sword Fern Ribes sanguineum I Red Flowering Currant Vaccinium ovatum 1 Evergreen Huckleberry Chanticleer Callery Pear Tall Stewartia 3,094 sf 3,110 sf 1 gal., Pat 2 gal., Pot 4", Pot 1 gal., Pot 5 gal., Pot 1 gal., Pot 2 gal., Pot 2 gal., Pot 2 gal., Pot 1 gal., Pot 1 gal., Pot 4", Pot 2 gal., Pot 5 gal., Pot 1 gal., Pot 5 gal., Pot 2 gal., Pot 2" Cal. B&B 8' Ht. B&B Matched, Evenly Branched, Meets Nursery Quality Industry Standard, Stake per detail, typ. Matched, Evenly Branched, Meets Nursery Quality Industry Standard, Stake per detail, typ. Matched, Evenly Branched, Meets Nursery Quality Industry Standard, Stake per detail, typ. Matched, Evenly Branched, Meets Nursery Quality Industry Standard, Stake per detail, typ_ Matched, Evenly Branched, Meets Nursery Quality Industry Standard, Stake per detail, typ. plant joints with groundcover 12" x 4' x 2'' pre -cast conc. large narrow paver from StepStone inc. 1'' sand setting bed specified topsoil %8' minus crushed rock compacted to 95% 95% compacted subgrade or undisturbed native soil Pre -cast Concrete Paver Detail SCALE: N.T-S. )12" diameter black rubber hose & 12 ga. wire tie. height to be just _.: high enough to hold tree upright. tie at one level only (3) 2x2 d.f. woad stakes or rebar - drive to refusal outside rootball plant slightly higher than - scarify rootball & spread roots, grown In nursery and pull insure crown is not buried Or cut twine & p burlap off top after settling and mulching Y2 of rootball 2" depth mulch fill planting pit with native soil or specified backfill 4" watering basin scarify edge of finish grade planting pit PLANT SLIGHTLY HIGHER THAN GROWN IN NURSERY AND INSURE THAT CROWN IS NOT BURIED AFTER SETTLING AND MULCHING FILL WITH ORIGINAL SOIL OR SPECIFIED BACKFILL SCARIFY Fr)GF OF PLANTING PIT <— existing soil firmly tamp prepared soi to avoid settling 2x rootball dia. NOTE: stake trees only if min. determined necessary by L.A. Deciduous Tree Planting Detai SCALE: N.T.S. IVII IN. LA ROOTBALL DIAMETER Evergreen Tree Planting Detail SCALE: N.T-S- plant slightly higher than grown in nursery and insure crown Is not bur after settling and mulch fill planting pit with nat soil or specified bacl scarify edge planting 2x2 WOOD STAKE DRIVEN To REFUSAL SECURE TO TREE W/ (2) STRANDS OF NURSERYMANS TAPE. TOP OF STAKE TO POINT TOWARD PREVAILING WIND SCARIFY ROOTBALL AND SPREAD ROOTS OR CUT TWINE & PULL BURLAP OFF TOP OF ROOTBALL 2" DEPTH MULCH PER SPECS 4" WATERING BASIN FINISH GRADE EXISTING SOIL FIRMLY TAMP PREPARED SOIL TO AVOID SETTLING NOTE: STAKE TREES ONLY IF NECESSARY AS DETERMINED BY PROJECT LANDSCAPE ARCHITECT scarify rootball & spread roots, or cut twine & pull burlap off top %3 of rootball 2" depth mulch 4" watering basin finish grade existing soil firmly tamp prepared soil to avoid settling Eastman King Residence 129 Skyline Dr. Edmonds, WA 98929 p ❑ b ❑ x g 7 z edmonds ■ was hingt❑n ■ 98020 p h o n e J f a x ■( 2 o 6)5 4 5 0 3 4 z w w w s t u d 1 o 3 4 2 c❑ m STATE OF WASH I NGTON REGISTERED LANDSCAPE ARCHITECT wcs,W� CHAP S. WICHERS CERTIFICATE NO. 931 project number: 20211004 drawn: checked: Studio 342 date issue 1 revision 03.08.21 Schematic Design 03.12.21 Revisions 03.24.21 Revisions 04.01.21 Revisions 05.20.21 Driveway Revisions 06.03.21 SMP 12.20.21 Permit Plant Schedule CX Details SCALE: N.T-S. L-2 C) Studio 342 Landscape Architecture, LLC Eastman King Residence 1.00 General 1.01 Summary A. Provide a fully automatic bidder designed irrigation system installed by a qualified, licensed Contractor. 1.02 Quality Assurance A. Perform work in strict accordance with the applicable plumbing, electrical, and health codes. B. Obtain and pay for all permits and approvals required by the local jurisdictional authorities for the full operation of the system. C. The work is subject to Landscape Architect tests and inspections as specified. Furnish written notice to the Landscape Architect 72 hours minimum prior to the required test or inspection. D. Include a master valve on the incoming mainline at the backflow preventer location. Advise Landscape Architect if mainline pressure is insufficient to permit the additional pressure loss of a master valve. 1.03 System Coverage A. Provide full coverage* in all planted areas. Exercise professional judgement in selection, location, height, and angle of sprinkler heads. Select and locate heads to avoid erosion, spraying building, and excessively washing walks. Shrub zones, sprinkler heads with widely varied precipitation rates, and differing sun exposures are to be valved separately. (Full coverage is defined as head to head coverage with a plants receiving adequate water). 1.04 Guarantee A. Guarantee system against defects of installation and material for a period of one (1) year after acceptance of sprinkler system. During guarantee period check, clear, and adjust sprinkler heads and otherwise insure adequate operation of system at maximum three (3) month intervals during the year. 1.05 Submittals A. Plans - Two (2) sets of irrigation plans showing pipe and head layout, spray pattern, and equipment list. B. Catalog Cuts - Manufacturer's descriptions of all proposed materials. C. Make submittals to Landscape Architect for review prior to construction. Approval of plans and materials by Landscape Architect does not change the Contractor's responsibility for providing full coverage in planting areas. 1.06 Substitutions A. Substitutions to the equipment specified will be permitted only with the express written approval of the Landscape Architect and when the substituted item is equal or better in quality than the item originally specified. The final determination for equal rests with the Landscape Architect, 1.07 As -Built Drawings A. Maintain a current record of all pipes and equipment placement and record any variations from the original design. B. Dimension pipe and equipment in variance to plans to two permanent structures sufficient for location after burial. C. Submit a neat and legible as -built drawing of complete irrigation system upon completion of irrigation system and prior to releases of final payment. Provide reduced scale copy of plan, plastic encased, for attachment inside controller door. 2.00 Materials 2.01 Meter A. Per local code. 2.02 Galvanized Pipe and Accessories A. Pipe - Standard weight steel pipe, electrical resistance weld, ASTM Schedule 40. B. Fittings - Malleable galvanized fittings. C. Exterior Coatings - Primer and Matte Black Alkyd Oil Enamel for above grade pipe and fittings. 'Fields 125' bituminous coating for pipe and fittings below grade. 2.03 Plastic Pipe and Fittings A. Pipe - Mainline: Schedule 40 PVC pipe, manufactured from a Type Grade I Polyvinyl Chloride (PVC) compound with a Cell Classification of 12454 per ASTM D1784. The pipe shall be manufactured in strict compliance to ASTM D1785 and D2665 (where applicable). Lateral lines: PVC 1120 or 1220, Class 200 conforming to U.S. Product Standard PS 22-70 and ASTM 2241, marked with manufacturer's name, class of pipe, NSF seal, and date and shift of manufacturing run. Provide uniform, smooth and glossy pipe with no evidence of interior or exterior extrusion marks. Pipe end pre -belled or straight to receive solvent -weld couplings. 2.04 Sprinkler Heads and Nozzles A. Rainbird, Toro, Weathermatic, or approved equal. Brass or plastic. Pop-up type spray heads in all shrub beds areas. Select nozzles to provide full coverage and to prevent erosion and overspray of buildings, windows, walks, etc.... Galvanized risers used only upon approval of Landscape Architect. 2.05 Risers A. Plastic bodies - 6" & 12" high pop-up Rainbird 1800 Series, or approved equal. B. Brass bodies - Only if requested by Owner. 2.06 Automatic Valves A. 24 volt, normally closed, provide with flow adjustment/shut-off handle and manual bleed cock. B. Brass, or plastic. Weathermatic 8200CR or 11000CR, or approved equal. 2.07 Master Valve A. Brass only. 2.08 Valve Boxes A. General - Black or green plastic with bolt down lock -top capability. B. Automatic Valves/Pressure Reducing Valve - Carson 132013-13B or approved equal. Lid marked valve. C. Backflow Preventer - Carson 1730C-12B or approval equal. D. Shut-off Valve - Carson 10" diameter or approved equal. E. Quick Coupling Valve - Carson 6" diameter or approved equal. 2.09 Automatic Controllers A. 120 volt service with 24 volt output and UL approved, lockable door. Size for minimum of two additional future zones. 14 day capability and option of any 30 minute start of a 24 hour day. Time spread per station 0-60 minutes. Include Master Valve terminal or a pump start terminal for Master Valve operation. 2.10 Wire A. UL approved OF and UL marked insulation jackets +/- #14 OF direct burial, solid copper, from controller to valves. ASTM B-3. Red or black for hot side, white for common ground, any third color for auxillary wires. Multi -strand wire is acceptable if distance from controller to furthest valve is less than 500 feet. 3M DBY below grade wire splices. Screw -type and taped splices above grade per code. 2.11 Quick Coupling Valve For Air Blowout A. Rainbird or approved equal with 1" MPT key. 2.12 Shut -Off Valve A. Champion Angle Valve, Mueller, or approved equal. Stop and Waste valve where allowed by code. Provide 30'' long key for valve operation. 2.13 Backflow Preventer A. Per State of Washington approved list and as approved by local code. Febco #850 double check valve assembly or approved equal. Include resilient seat gate valve on each end of unit and Y2" brass, screwed end, 150# WOG drive valve on downstream side. 2.14 Pressure Reducing Valve A. Watts #223, Wilkens #500, or approved equal. Contractor has the option of utilizing a pressure reducing valve or automatic valves with pressure reducing capability. 2.15 Check Valves A. KBI King -Check or approved equal. SAMS (seal-a-matic) may be used with an auto -drain and a gravel sump (minimum 1 CF) at the lowest end of each zone. 3.00 Installation 3.01 Examination A. Prior to starting work carefully inspect the prepartory work of other trades and verify that such work is acceptable for the installation of this work. Report all unacceptable conditions to the Landscape Architect. Do not begin work until unacceptable conditions have been resolved. Beginning work constitutes Contractor acceptance of conditions. 3.02 Meter A. Verify need with local water purveyor. Determine location, size, and type of pipe in the service from the main. 3.03 Trenching A. Make trenches for irrigation system. Finish trenches free from rock, debris, or sharp articles. Provide depth to acheive minimum 16" cover for shrub beds, and 16" cover for mainline. Removed unused trench spoils from site. 3.04 Pipe A. Cut PVC pipe ends at 90 degrees to the pipe length and clean all cutting prior to cementing. Wipe pipe ends clean with rag lightly wetted with PVC thinner. Apply cement with light coat on inside of fitting and heavier coat on outside of pipe. Insert pipe into fitting and give a quarter turn to seat cement. Wipe excess cement from outside of pipe. 3,05 Sleeving A. Class 200 PVC, 4" minimum diameter. Schedule 40 under asphalt or crushed rock paving. Verify with Landscape Architect if sleeves are to be installed by others. 3.06 Spray Heads and Risers A. Set shrub heads with flange flush or slightly below finish grade at a minimum distance of 4 inches from planter edge. Provide double swing joint or flexible swing pipe and spiral barbed fitting (connection at bottom of sprinkler body only) for connection to lateral. 3.07 Nozzles A. Select nozzles to provide full coverage without causing erosion problems, staining of siding, or drift onto windows. 3.08 Electric Wire A. Install wire in conduit where required by local code. Bury at sufficient depth to meet local code and in no case less than bottom side of parallel pipe. Bundle control wires and tape at 10' intervals. Tape bundles to adjacent pipe. Install wire in sleeves under all pavement. Splices shall occur at boxes only. 3.09 System Expansion A. Provide a minimum of two (2) auxillary wires for future valve locations Run one unconnected spare control wire from the controller though each intermediate valve to terminate at the valve(s) at the ends of the main line. Loop at least 24'' of wire at each of the intermediate valve boxes. Mark spare wires at the controllers and in boxes with permanant tag. Coil spare wire in plastic valve box. 3.10 Backfilling Trenches A. Set pipe to ensure no puncture damage or future settlement. Lay mainline pipe with manufacturer's designations toward top of trench. Compact backfill to no less than 90% density at optimum moisture content. Backfill around sprinkler heads to restrict movement of heads by external force. Repair all trench settlement and finished surface damage due to settling during warranty period. 3.11 Automatic Valves A. Install in specified valve box. Provide PVC nipple (minimum 4" long) on the inlet side and compression coupling or PVC union on the outlet side. Adjust flow with stem of valve to balance system. Mount valve boxes flush with finish grade unless otherwise indicated on drawings. Install immediately adjacent to walks or curbs (in shrub beds where possible). Provide 6" of pea gravel in bottom of valve box with 6" clear from gravel to underside of valve. 3.12 Master Valve A. Size to match mainline size. 3.13 Backflow Prevention Unit A. Install per local applicable code. Verify location with Landscape Architect. Otherwise Contractor is responsible for cost of relocation. Install galvanized ground joint unions on both inlet and outlet sides. Install Double Check Assembly in plastic box with minimum of 6" of gravel at bottom of box. Provide positive and verifiable drainage out of box. If required, install Reduced Pressure Backflow Preventer per code. 3.14 Pressure Reducing Valve A. Install in plastic valve box with un-marked lid. Set so system does not fog with auto valves wide open. 3.15 Automatic Controller A. Review exact location with Landscape Architect prior to installation. Connect to 120 volt service. Provide conduit/wire from controller location to valves. Label each station to clearly identify location of each valve. 3.16 Quick Couple Valve A. Install in a 10" diameter valve box. Ensure valve can be operated from finish grade. 3.17 Shut Off Valve A. Install in a 10'' diameter valve box. If Stop and Waste Valve is allowed by code, provide 1 cubic foot gravel sump beneath valve. 3.18 Check Valves A. Provide low head check valves on risers of lowest heads to prevent leakage. 3.19 Riser Painting A. Paint all galvanized pipe and fittings with one coat minimum of specified material. Touch up after assembly. 3.20 System Flushing A. Flush entire system prior to installation of sprinkler heads/nozzles. After capping all risers, remove cap nearest automatic valve, flush, and recap. Repeat this process until last head on circuit is flushed. If a pressure reducing valve is included in system, open wide for maximum pressure during flushing operation. 3.21 Pressure Test A. Leave all system joints, connections, etc... exposed until after completion and acceptance of pressure test. Cap and open entire system to full main static pressure (pressure reducing valve wide open) for a period of two (2) hours. If static exceeds 80 psi, set PRV at 80 psifor testing laterals. Test mainlines at 100 psi. Visually check joints and connections for leaks. Repair all leaks, however minor. Contractor has the option of using AWWA pressure test (test with approved pressure pump at 100 psi with no more than 5 psi loss in 15 minutes). Deliver written record of test to Landscape Architect. 3.22 Performance Tests A. Upon completion of system installation and after flushing and pressure tests are completed, operate system in presence of Landscape Architect. Correct all deficiencies until the system is approved. 3.23 Adjusting A. Substitute or modify up to 5% of total nozzles to accomodate locations and density of plants and ensure full coverage. 3.24 System Familiarization A. Upon completion of system installation, flushing, and pressure tests, and acceptance of system by Landscape Architect, operate the system in the presence of the Owner. Provide keys and/or other tools necessary to operate/drain/activate the system and spend adequate time with Owner to ensure operation/maintenance/winterization can continue after departure of Contractor. Submit written verification of compliance to Landscape Architect indicating date and persons involved. Contractor is liable for all damage or losses resulting from failure to comply with provisions of this paragraph. 3.25 System Protection A. Deactivate and drain the system prior to the onset of frezzing seasonand reactivate at the onset of spring season. Accomplish each at least once during the guarantee period. If installation is completed when system is not in use, winterize after testing. Certify by letter the dates of winterization/activation. Repair damage from failure to comply. Purge system with low pressure and low volume compressed air. Do not allow pipe or compressor to get hot to the touch. 3.26 Final Approval A. Upon completion of all tests, final approval for system will be contingent upon Contractor providing signed and approved sprinkler/plumbing/health/electrical permits as may be applicable in the area, and as -built drawings of the complete system. END OF SECTION 129 Skyline Dr. Edmonds, WA 98929 p ❑ b ❑ x g 7 z edm❑nds ■ wash in9ton ■ 98020 p h o n e J f a x ■( 2 o 6)5 4 5 0 3 4 z w w w s t u d i o 3 4 z c❑ m STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT wcs, r CHAP S. WICHERS CERTIFICATE No. 931 project number: 20211004 drawn: checked: Studio 342 date issue / revision 03.08.21 Schematic Design 03.12.21 Revisions 03.24.21 Revisions 04.01.21 Revisions 05.20.21 Driveway Revisions 06.03.21 SMP 12.20.21 Permit Irrigation Specifications L-3 C) Studio 342 Landscape Architecture, LLC I I I (1) Stev artia monadelpha Tall Stewartia Emerald Hills Community path (20' wide) I tw 354.80 bw 354.30 tw 360.80 bw 355.00 tw 365.34 bw 361.00 110' san itary sewer easement I setback line 4' ht. max. horizontal wood fence atop retaining wall nati e low maintenance planting at b�se of retaining wall building overhang 6' ht. retaining wall (typ.) Allan Block AI Europa collection I tw 367.38 bw 361.00 4' ht. max, hdrizontal wood fence atop retaining wall (6) Amelanchier �lnifolia 'Honeywood' Honeywood Serviceberry (15) Thuja oc identalis 'Smaragd' Emer11d Green Arborvitae f tw 367.38 bw 361.00 tw 360.80 bw 355.00 I tw 354.80 bw 349.00 UAKily:!►M4 CP } 4 t y 1� a t } • • - • n P } .... ° sI 1I 7 i t �Ij ° • 4 I � I P t � y t ' BFE 367.60 P C ■ I } L new patio ffe 1 367.58 P• • t � } conq. patio (deck above) tw 360.80 bw 355.00 tw 365.64 bw 361.00 C5D concrete- 4 �. .,driveway �{ tw 368.00 -� bw 365.72 ti --------- MS. w �7 ■. ===ill!IIEe=:::- r�r�lll371.00 fMUM w•,=ii_ M0,11, a _ •l'�!!� tw 365.64 bw 361.00 ==CJCJC� W�►itAk� L_ 4'x4' AC unit pad 3' man gate at 4' ht. fence, typ. concrete walkway, typ. rock retaining wall, see civil, typ. (8) Acer shirasawanum 'Jordan' Jordan Fullmoon Maple tw 365.64 bw 364.00 } i i i GFE377.16 �A---� ,,concrete driveway � 0. el rEl SOL MANAGEMENT PLAN PLANTING TYPES i propose ', min. 1.5'' cal. Comus kousa 'Eddie's White Wonder' Eddie's White Wonder Dogwoo trees to eet City of Edmonds ❑de 23.10.06 .C.5 EWW D wood more disease r sistant than nati e species Comu N ttallii (Pacific Dogwoo (2) Pyrus ca letyana 'Glen's Form'TM Chanticl er Callery Pear 12' utility ease ent stairs to main entry (2) Acer pal atum 'Sango Kaku' Coral Bark Japanese Maple 5' wide concr to walkway L.L r1 - Lu 0 Z rT- J � CI] concrete walkway and stairs ex. utility box s to remain trash & recyle. containers concrete ret fining wall, see civil, typ. Ornamental plantingbeds Area #1 3,094 total SF All lancing bed area to have 8" of Cedar Grove 3-way soil mix added 1. �carify subsoil to a depth of 12" 2 " of imported topsoil to be added and tilled into the top 8" of existing soil 3. " of imported top soil to then be placed on tilled soil and raked smooth ❑ remove rocks over 2" in diameter Mulch all planting beds with 2" of Cedar Grove Organic Landscape Mulch Naglve planting beds (Area #2): (3,110 total SF) All lancing bed area to have 8" of Cedar Grove 3-way soil mix added 1. carify subsoil to a depth of 12" 2 " of imported topsoil to be added and tilled into the top 8" of existing soil 3." of imported top soil to then be placed on tilled soil and raked smooth o remove rocks over 2" in diameter Mu ch all planting beds with 2" of Cedar Grove Organic Landscape Mulch Unoisturbed native vegetation (Area #3): (nla} Na soil disturbance to these areas I I I I I 1 I I 1 I f I Eastman King Residence 129 Skyline Dr. Edmonds, WA 98020 Stu. &.0, MR. 2 landscape architecture p ❑ b ❑ x g 7 z edm❑nds • was hingt❑n ■ 98020 p h o n e J f a x •( 2 o 6) 5 4 5 0 3 4 z w w w s t u d i 0 3 4 z c❑ m STATE OF WASH I NGTON REGISTERED LANDSCAPE ARCHITECT cs. W�2h CHAD S. WICHERS CERTIFICATE No. 931 project number: 20211004 drawn: checked: Studio 342 date issue 1 revision 03.08.21 Schematic Design 03.12.21 Revisions 03.24.21 Revisions 04.01.21 Revisions 05.20.21 Driveway Revisions 06.03.21 SMP 12.20.21 Permit Soil Management Plan 0 4 8 16 L J SCALE-1 /8" = T-0" NORTH L-4 C) studio 342 Landscape Architecture, LLC