Loading...
ENG COMPACTION REPORT Skyline Drive - DFR 7-28-22 (2)GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 26, 2022 Mr. Phil Haberman (E-Mail) COBALT GEOSCIENCES, LLC P.O. BOX 1792 North Bend, WA 98045 RE: CONSTRUCTION TESTING AND INSPECTION Skyline Drive 131 Skyline Drive Edmonds, Washington Dear Mr. Haberman, KA No. 096-22359 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Jeffrey S. Me e � Operations er Pacific N 1 . est Division JSM/lkj INC. 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09622359 DFR.doc Page 1 of 1 i m Field aZan8tAssociates,inc. Geotechnical Engineering . Environmental Engineering Report NO.: 09622359DFR7212022AL Construction Testing and Inspection DATE: 7/21/2022 Set Count: CONTRACTOR: Cobalt PROJECT #: 09622359 PERMIT #: PROJECT: Skyline Dr INSPECTOR: Amelia Leon LOCATION: 131 Skyline Dr, Edmonds JURISDICTION: City of Edmonds KA P.M.: JM WEATHER: Sun TEMP: 75' F A Krazan & Associates Representative visited the project site today to perform in -place density testing and obtain a sample for lab testing. Upon arrival on site, we met with the contractor to discuss locations for testing. The contractor had previously placed and compacted 5/8-in minus, CSTC in the roadway of Skyline Drive along the north edge of the site. Today, we performed and reported two (2) in -place density tests. At the time of our site visit, lab testing on the placed material had not been conducted; results will be provided following completion. See soil compaction report no. 09622359SCR7212022AL for additional details. While on site, we obtained a sample of the 5/8-in minus, CSTC from a site stockpile. The sample was sealed and transported to the Krazan Lab for testing (proctor). Reviewed By: I i j f{ i ASTM Test #: I I Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and K=an k Associates. This report indicates our inspectors observation and testing insults based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector dots not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. 'm —am -0" Kr2t70n& Ass oci ate s Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 7/21 /2022 PROJECT M 09622359 PROJECT: Skye Dr LOCATION: 131 Skyline Dr, Edmonds KA P.M.: JM COMPACTION REPORT NO.: 09622359SCRO72122-AL CONTRACTOR: PERMIT #: INSPECTOR: Amelia Leong JURISDICTION: City of Edmonds WEATHER: Sun TEMP: 75 ASTM 6938ENSOMETER SANDCONE ❑ ASTM D115 6 F-1 OTHER LOCATION MAP O Paved Areas: 0 Building Pad(s) : 00 Utility: 0 Other Curve Unified Soils Classification or Description Maximum Dry Density! Rice optimum Moisture A 5/8-in minus, CSTC 131.4 3.8% TEST ELEVATION LOCATION CURVE MODE & DEPTH DENSITY (PCF) MOISTURE COMPACTION REQUIRED COMPACTION 1 Near surface Skyline Dr (N edge of site) in front of storm drain A 8" 127.4 4.2% 97% 95% 2 Near surface Skyline Dr (N edge of site) — 5' E of storm drain A 81' 128.8 4.5% 98% 95% EQUIPMENT NO.: B-269 (TroxIer 3430) DAILY AVERAGE STANDARD DENSITY COUNT: 2257 DAILY AVERAGE STANDARD MOISTURE COUNT: 62 Reviewed By: This testing does not preclude the possibility that the soil or hot mix asphalt may be loosened by future construction or rainfall events. The compaction tests were performed at the approximate locations and elevations shown, and indicate relative compaction at those locations. Horizontal and vertical limits of the compacted areas were determined by others. Our firm does not guarantee earthwork or paving construction, nor does our work relieve the contractor's responsibility to conform to the approved project plans and specifications. To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. REMARKS: Superintendent/Representative: Compaction Report Technician: Offices Serving the Western United States Effective 12/15/2020 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The infnnutien provided on ihisreport is preparat f r the -elusive of the client. This report nin not be reproduced in any fmmat without the written permission of the client and Kra,tan&Associates. This report indicates our inspectsts observation and testing result, hawvl on site conditions and mntractst activities, This information is subject to review prior to final submittal. By signing this report, our inspeetordoee not accept responsibility for validity orresolts. The snore information has bcon proeided by other, on site, The test results apply only (,the specific hwations, and items inspected or tested. Page 1 of 1