Loading...
EOR addressing and approval of deck joists hangers.CJR Engineering Civil — Structural Engineering Comprehensive Project Management 14602 15th PL W Phone: (425) 21 Lynnwood, WA 98087-6043 Fax: (425) June 29, 2023 City of Edmonds Permitting & Development Building Inspections Dept. 151 5th Avenue N Edmonds, WA RE: 131 Skyline Drive Sue Eastman and Gerald King Deck Joists Support on Hangers Dear Sirs, Regarding the referenced project, Luke Sigler, Sigler Construction LLC, requested that review the support of deck joists on the joist hangers, because the end of the joists were short approximately'/2" and did not fully reach the back of the hanger. Upon review of photographic evidence of the support on the hangers and the joist loads involved, I find that the brackets are providing adequate support for the joists. No remediation actions are required for this condition. If anything else is required regarding this matter, please call me at (425) 269-5204, or email to clemens(a)cjreng.com . Sincerely, CJR Engineering Clemens J. Rossell, P.E. I��S J. R0`rr� WAS 1�SSIONAL�G 6/29/23