Loading...
Letter re Holdowns Substitution 090922CJR Engineering Civil — Structural Engineering Comprehensive Project Management 14602 15th PL W Phone: (425) 21 Lynnwood, WA 98087-6043 Fax: (425) September 9, 2022 City of Edmonds Permitting & Development 151 5t" Avenue N Edmonds, WA RE: 131 Skyline Drive Sue Eastman and Gerald King Substitution for Holdowns Dear Sirs, I understand that during construction of the referenced residence, some of the LSTHD8 and LSTHD10 strap holdowns were not installed prior to pouring concrete. At each of the locations involved, the LSTHD-type holdown shall be substituted with an HDU2-SDS2.5 holdown attached to a double stud with (6) SDS1/4x2-1/2" screws and to hardened concrete with a 5/8" all -thread rod embedded 6" minimum and set with Simpson SET XP epoxy or approved equal. If anything else is required regarding this matter, please call me at (425) 269-5204, or email to clemens(a-)-cireng.com . Sincerely, CJR Engineering Clemens J. Rossell, P.E. �s J, Ross`[ 29133 w 9/09/22