Loading...
REVIEWED PLN RESUB 1 BLD2021-0895 Landscape estimateEastman King Residence 3.33. Skyline Drive, Edmonds, Washington Landscape Cost Projection DATE: October 19,2021 Q landscape architecture ITEM QUANTITY UNIT COST TOTAL MOBILIZATION Contractor mobilization 1 Allow $ 2,000.00 $ 2,000.00 subtotal: $ 2,000.00 PLANTING Topsoil -6" depth in planting/lawn areas 132 CY $ 6o.00 s 7,930.00 Mulch -z" depth in planting areas 44 CY $ 6o.00 $ 2,648.62 Required 1.5" Dogwood trees 5 EA $ 300.00 $ 1,500.00 Specimen trees 5 EA $ 250.00 $ 1,250.00 Columnartrees 14 EA $ 200.00 $ 2,800.00 Shurb/groundcover planting areas 7137 SF $ 5.00 $ 35,685.00 subtotal: $ 51,813.62 IRRIGATION Irrigation system (modified for new design) New Controller 7137 SF $ 1.75 $ 12,489.75 1 Allow $ 800.00 $ 800.00 subtotal: s 13,289.75 SUBTOTAL: s 67,103.37 WA State Sales Tax (io.8%) $ 7,247.16 TOTAL: s 74350.53